You are on page 1of 82

WELCOMES YOU

Presentation
2nd May 2017

HES Infra Private Limited


(An ISO 9001-2008 Certified Company)
Plot No. 39, B. N. Reddy Colony,
Road No. 14, Banjara Hills,
Hyderabad 500 034, Telengana.
Vision Statement.

The greatest possible good for the greatest possible


individual members of the Society.

Continuous improvement just in Time.

Commitment to the entrepreneurship to build a stronger


Nation.
Mission.

Engineering is a method to use heuristics to cause a best


change within available resources.

HES Infra Private Limited is committed to provide


quality construction and unsurpassed customer or user
satisfaction.
The Company.

The Company Hindustan Engineers Syndicate was established in


the year 1997 and transformed into HES Infra Private Limited in
the year 2007.

The Company run by Technocrat Entrepreneurs with three decades


of expertise in execution of Civil Engineering Infrastructure
projects .The visionary action of HES lived up to the expectations of
State Governments of Andhra Pradesh, Karnataka, Maharashtra,
Odisha, Madhya Pradesh, Gujarat, Uttar Pradesh and Telengana.
Details of Enlistment.

Roads and Buildings Department : Govt of Andhra Pradesh.


Roads and Buildings Department : Govt of Telengana.
Public Works Department : Govt of Odisha
Water Resources Department : Govt of Madhya Pradesh.
Public Works Department : Govt of Madhya Pradesh.
Sardar Sarovar Narmada Nigam Limited : Govt of Gujarat.
Irrigation Department : Govt of Uttar Pradesh.
Public Works Department : Govt of Karnataka.

Krishna Bhagya Jala Nigam Limited : Govt of Karnataka.

Ministry of Defence : MES, DGNP(V)


Areas of Expertise
Bridges, Roads & Tunnels.

Aqueducts, Site Development & Flood Protection Works.

Dams, Reservoirs, Spillways, Wier, Vertical & Radial Gates,


Regulators & Canal Network.

Industrial Pump Houses for the Lift Irrigation .

Survey, Investigation, Design of Bridges & Hydraulic Structures.


Machinery and Equipment
Tippers 111 Crushers 05

Excavators 59 Back Hoe Loaders 06

Transit Mixers 25 Drilling Compressors 05

Dozers 09 Loaders 06

Batching Plants 10 Tele Belts ( putzmeister) 02

Cranes 08 Weigh Bridges 04

Vibrator Soil Compactors 10 Motor Graders 02

Concrete Pumps 05 Boom Pumps 02


On Going Projects.
Name of Project : Kanhar Irrigation Project.
Type of Contract : Item Rate.
Client : Irrigation Department, Government of Uttar Pradesh.
Components of the Project : Spillway : 350 metres long.
Aqueduct Cum Viaduct : 1900 metres long.
Tunnel : 3000 metres long.

Value of Project : Rs. 1105.43 Crores. - Present Progress : 51%


Date of Commencement : 09 Aug 2011.
Original Date of Completion : 08 Aug 2014.
Extended Date of Completion : 08 Aug 2017.
Reasons for the Extension : Scope of work increased due to changes in Design
Parameters based on recommendations of CWC.
Kanhar Spillway
Kanhar Spillway
Kanhar Spillway
Kanhar Spillway
Kanhar Spillway
Kanhar Spillway
Kanhar Spillway Video
Tunnel
Tunnel.
Tunnel.
Tunnel
Tunnel Video
Foundation - Aqueduct .
Aqueduct
Aqueduct
Aqueduct
Aqueduct
Aqueduct Video
Workshop Fleet
Stone Crusher.
Concrete-Batching Plant
On Going Projects.
Name of Project : 16 No's Radial Gates of Spillway of Size 15.50 x 14.70
with ARMAC system for Kanhar Irrigation Project
at Sonbhadhra District, Uttar Pradesh.
Type of Contract : Item Rate.
Client : Irrigation Department, Government of Uttar
Pradesh.
Components of the Project : 16 Nos. Radial Gates, Canal Network for left and
right Kanhar canal System including Head Sluice.
Rehabilitation Colony.
Value of Project : Rs. 259.90 Crores. - Present Progress : 35%

Date of Commencement : 22 Jan 2015.

Original Date of Completion : 21 Jan 2018.


LKC Aqueduct
LKC Aqueduct
RKC Barrel Syphon
Rehabilitation Colony .
Layout Rehabilitation Colony.
On Going Projects.
Name of Project : Bhaoni Dam Project.
Type of Contract : Item Rate.
Client : Irrigation Department, Government of Uttar Pradesh.
Components of the Project : Spillway : 175 metres long.
Earthen Dam : 3000 metres long.
Canal Network : 26 Km long.

Value of Project : Rs. 261.42 Crores. - Present Progress : 88%


Date of Commencement : 28 Dec 2012.

Original Date of Completion : 27 Dec 2015.


Extended Date of Completion : 27 Dec 2017.
Reasons for the Extension : Scope of work increased due to changes in Design
Parameters based on recommendations of CWC.
Bhaoni Spillway.
Bhaoni Spillway.
Bhaoni Spillway
Bhaoni Earthen Dam.
Substantially Completed Projects.
Name of Project : Construction of High Level Bridge across River
Kathajodi (Mahanadi ) for direct link from Cuttack
to Bhubaneswar.
Client : Roads & Buildings Department,
Government of Odisha.
Components of the Project : High Level Bridge --3000 Metres Long.

Value of Project : Rs. 94.49 Crores. - Present Progress : 96 %

Date of Commencement : 07 Mar 2011.

Extended Date of Completion : 31 Dec 2017.

Reasons for the Extension : Delay in approval of Designs, Change in Scope of


Work
.
Concreting Boom Pump.
Pre-Stressed Concrete.
Form work Centering
HLB Cuttack to Bhubaneswar
HLB Cuttack to Bhubaneswar
HLB Cuttack to Bhubaneswar
HLB Cuttack to Bhubaneswar
HLB Cuttack to Bhubaneswar
On Going Projects.
Name of Project : Palamuru Rangareddy Lift Irrigation System:
Formation of Venkatadri Reservoir bund from Km
11.550 to 16.300 at Vattem
(V),Bijinepally(M),Mahabubnagar District, Package
No 11
Client : Irrigation & CAD Department,
Government of Telangana.
Components of the Project : High Level Earthen Dam.

Value of Project : Rs. 1026.37 Crores.


Date of Commencement : 28 May 2016.

Original Date of Completion : 28 Dec 2018.


COT Excavation Earthen Bund
COT Excavation Earthen Bund
Earthen Bund Compaction
On Going Projects.
Name of Project : Palamuru Rangareddy Lift Irrigation System:
Formation of Udandapur Reservoir bund from Km
6.300 to 15.875 at Udandapur(V),Jadcherla
(M),Mahabubnagar District, Package No 18

Client : Irrigation & CAD Department,


Government of Telangana.
Components of the Project : High Level Earthen Dam.

Value of Project : Rs. 1366.82 Crores.


Date of Commencement : 15 Jun 2016.

Original Date of Completion : 15 Jan 2019.


Completed Projects.
Name of Project : Gandikota Lift Irrigation Scheme (GKLIS).
Type of Contract : Turnkey.
Client : Irrigation & CAD, Government of Andhra Pradesh.
Components of the Project : Wier, Head Sluice, R/S Sluice for 6 TMC Reservoir,
Himakuntla Sump, Feeder Channel,
Branch Canals, Formation of High Level Canal.

Value of Project : Rs. 374.77 Crores.


Date of Commencement : 31 Mar 2005.

Original Date of Completion : 30 Mar 2009.

Date of Completion : 15 Dec 2015.(Inaugurated By Chief Minister on


11 Jan 2017.)
Reasons for the Extension : Scope of work increased due to changes in Storage
capacity of the Reservoir.
Gandikota Lift Irrigation Scheme-Reservoir
Gandikota Lift Irrigation Scheme
Gandikota Lift Irrigation Scheme-Reservoir
Gandikota Lift Irrigation Scheme-Reservoir
Gandikota Lift Irrigation Scheme-Reservoir
Gandikota Lift Irrigation Scheme-Reservoir
Inauguration By Chief Minister of Andhra Pradesh
Gandikota Lift Irrigation Scheme-Reservoir
Completed Projects.
Name of Project : Construction of High Level Bridge across River
Godavari and its approaches between Sironcha in
Maharashtra and Kaleswaram in Telengana.

Client : Public Works Department,


Government of Maharashtra.
Components of the Project : High Level Bridge and Approaches.

Value of Project : Rs. 214.73 Crores.


Date of Commencement : 22 Apr 2011.

Date of Completion : 30 Dec 2016.(Governor of Maharashtra inaugurated


the bridge on 30 Dec 2016 )
Reasons for the Extension : Scope of work has been enhanced by the Govt of
Maharashtra.
Girder Launching.
Girder Launching.
Heavy Machinery Activity.
River Godavari Bridge Sironcha Kaleswaram
River Godavari Bridge Sironcha Kaleswaram
River Godavari Bridge Sironcha Kaleswaram
Inauguration - Sironcha Kaleswaram Bridge
Substantially Completed Projects.
Name of Project : Construction of Saddle Dam E & F of Indira Sagar
Project (Polavaram).
Client : Irrigation & CAD,
Government of Andhra Pradesh.
Components of the Project : Regulator and Saddle Dam (Earthen).

Value of Project : Rs. 79 Crores.


Date of Commencement : 16 Feb 2009.

Original Date of Completion : 30 June 2016.

Reasons for the Extension : Scope of work has been revised by Govt. of Andhra
Pradesh.
Saddle Dam Polavaram.
Saddle Dam Polavaram.
Regulator Polavaram.
Regulator Polavaram.
Substantially Completed Projects.
Name of Project : Construction of Earthwork of Main Canal from RD
28.56 Km to RD 57.05 Km including minors,
hydraulic and road structures at Gulab Sagar Siddhi.

Client : Water Resources Department .


Government of Madhya Pradesh.
Components of the Project : Earthwork, Hydraulic and Road Structures .

Value of Project : Rs.90.90 Crores. Present Progress : 91 %


Date of Commencement : 05 March 2011.

Original Date of Completion : 31 March 2017.

Reasons for the Extension : Delay In Land acqusition .


Substantially Completed Projects.
Name of Project : Construction of Teonthar Lift Canal RD 0.00 Km to
RD 23.00 Km including its Distribution Network,
with Two Numbers Supplementary Small Lift
Irrigation System in Main Canal.

Client : Water Resources Department .


Government of Madhya Pradesh.
Components of the Project : Main Canal, Distribution Network, Lift Irrigation
System.
Value of Project : Rs. 94.84 Crores. Present Progress : 95%
Date of Commencement : 20 November 2011

Original Date of Completion : 30 March 2017.

Reasons for the Extension : Delay In Land acquisition.


Substantially Completed Projects.
Name of Project : Construction of Balance Earth Work of Pench
Earthen Dam from RD 0.00 to RD 1400.00 and RD
1800.00 to 6376.00. at Chhindwara .

Client : Water Resources Department .


Government of Madhya Pradesh.
Components of the Project : Earth work, Diaphragm wall, Drilling & Grouting.

Value of Project : Rs. 99.68 Crores. Present Progress : 97 %


Date of Commencement : 30 November 2011.

Original Date of Completion : 31 March 2017.

Reasons for the Extension : Delay In Land acqusition .


Financials.

(In Crores)

Details 2013 - 14 2014 - 15 2015 - 16

Turn Over : 525.93 606.07 817.60

Net worth : 187.55 228.07 288.99

Current Assets : 295.20 345.36 424.27


Financials.
9
8
7
6
5
4
14 15 16
3
2 14 15 16

1 14 15 16

0
Turnover Net Worth
Reserves Current
CurrentAssets
Assets
Thanking You..!