Training Seminar
on
Dholpur Combined Cycle Power Project
Submitted By:-
Gaganil Sharma
Final year, B.Tech. (ME)
1
CONTENT:-
Introduction
Working of DCCPP
Plant layout
Gas Turbine
Heat Recovery Steam Generator
Steam Turbine
Condensor
Switchyard
Control room
Conclusion
2
Introduction:-
4
Working of the combined cycle power
plant
6
WATER FLOW DIAGRAM
CHAMBAL
RIVER
ACW
RETURN
Intake well
COOLING TOWER CW
RETURN
BALANCING RESERVOIR
CROSS
COUNTR CW PUMPS
RAW WATER RESERVOIR
Y PIPE(8.5
(TWO NO.) For CW
KM)
ACW PUMPS
FIRE FIGHTING
BHARAT HEAVY ELECTRICALS LIMITED
GT # 1 HRSG # 1
104.5MW 187.1/39.8TPH
ST
121MW
GT # 2 HRSG # 2
104.5MW 187.1/39.8TPH
8
GAS FUEL FLOW DIAGRAM
GAS SUPPLY LINE
GAS TURBINE
9
GAS TURBINE:-
It works on idealized Brayton cycle.
It extract energy from hot gases produced
by combustion of gas.
In this shaft speed is 3000 rpm.
5 stage turbine arranged on common shaft
with 18 stage compressor and a generator.
10
GAS TURBINE - A HEAT
ENGINE:-
AirIntake System.
Compressor.
Combustion Chamber.
Turbine.
Generator.
11
POWER(29.5 %)
EXHAUST
FUEL GAS
(100 %) TURBINE HEAT
(67 %)
MISC.
(3.5 %)
12
WASTE HEAT RECOVERY
STEAM GENERATOR :-
Itis a heat exchanger that recovers heat
from a hot gas stream.
There are two boiler drums in WHRSG.
Water comes in economizer and
temperature of water increased.
Water supplied to boiler drum then
evaporator in this water is converted into
steam.
Steam pass through super heaters.
Dry steam is supplied to boiler drum.
Then steam turbine.
13
STEAM TURBINE:-
In Steam Turbine shaft is rotated steadily
by impact reaction of steam as working
substances on blades of turbine.
It converts potential energy or heat energy
into mechanical energy.
It works on Rankine Cycle.
Steam turbine is started by burnt exhaust
gases coming out from gas turbine.
14
WORKING OF STEAM
TURBINE:-
15
CONDENSER:-
Situated below turbine.
Purpose is to turn low energy steam
back into water for use in WHRSG.
Maintain proper flow of steam.
In general improve the efficiency of
plant.
Air and non-condensable gases, which
have corrosive action are removed by dry
air pump.
16
WORKING OF CONDENSER:-
17
SWITCHYARD AND
TRANSMISSION EQUIPMENTS:-
Transformer
Isolators
Circuit breakers
Wave trap
Lightning arrestor
Current transformer
Potential transformer
Bus bars
18
CONTROL ROOM:-
Incontrol room various controls are
provided simultaneously various
measurement are made various relays are
provided here.
Control room pannel:-
Fan control desk
Fuel control desk
Steam water desk
Turbine desk
Generator control panel
CONTROL ROOM:-
Incontrol room various controls are
provided simultaneously various
measurement are made various relays are
provided here.
Control room pannel:-
Fan control desk
Fuel control desk
Steam water desk
Turbine desk
Generator control panel
20
PLANT TO HOME:-
21
BHARAT HEAVY ELECTRICALS LIMITED
HIGH EFFICIENCY
LOW COOLING WATER REQUIREMENT
FAST START
LOW ENVIRONMENT POLLUTION
LOW COSTS
22
BHARAT HEAVY ELECTRICALS LIMITED
23
Conclusion :-
24
25