You are on page 1of 80

3rd Regional Asset

Management Review Meeting

Presentation by ARASUR S/S

1
Highlights
RHQ to collect all the site presentations and shall be handed over to
CC/AM at least one day before the meeting
All sites to ensure that status on all the issues is provided as per the
attached presentation
Status of commg. of On line DGA & Dry out/ validation of FO
Sensors wherever available as per contract.
Status of non-availability of equipments and restoration plan.
Status of commissioning of CSDs.
Status of healthiness of Fire Fighting, Air Conditioning, DG set &
Diesel Engine.
Status of Compliance of Circulars

2
Commissioning of Transformer and Reactor in last Two Year

Name of ICT/ Reactor Make MVA/ Voltage DOC


S/s Designation MVAR Rating

-NIL-

3
Compliance of last Review meeting
Status of all the Substation related issues as per last Regional
and central Asset Management review MOMs needs to be
mentioned

# Tan Delta at variable frequencies done and results/trends are


found to be in order. DGA sample of Bushing oil also taken
and results are found ok.

# Thermo vision scanning done on 20.03.2017 (Last date of


Measurement)

# Bay 206 B phase 245 kV BHEL make CVT having drift of


1.85 V from commissioning time. Replacement will be done
with new one already ordered from RHQ.
4
Compliance of SIR issues
Date of last Corporate SIR: November 2012

Date of last Regional SIR: January 2016


Pending issues: NIL

5
DGA status of BHEL make Bushings
Sl. Description Quantity
No
Due Done Balance Defect Replaced
ive
1st round Done IV side R Nil Nil
pole & B
2nd Round Done Pole of ICT
Cap could
3rd Round Done not be
opened
Ensure DGA Result of all the BHEL make Bushings during
the meeting DGA results are found in order

6
Status of Tan Delta at Variable Frequency

Sl.No Make Total Qty Qty Balance Remarks


mea *
sure
d
1 BHEL 420kV - 6 nos 12 Nil Test
Mfg After 245kV 6 Nos Nos results
2005 (All) found ok
2 ALSTOM-
Mfg After
Apr2013
* No3of bushings
765kV ABB
replaced based on tan delta at variable frequency to be indicated. In case problem
in Variable Frequency Tan-Delta, as a confirmatory test, DGA of the bushing to be carried out.
make bushing
4 Bushing
replaced 7
Bushing Tan Delta and
Capacitance

8
Guideline for Tan delta graphs
C & Tan delta of installed bushings to be provided.
Only last four results to be provided (in case, equipment is new, pre-commg.
results also to be provided)
In Tan delta, scale of 0.001 to be provided
Test result values to be displayed on the curve itself (i.e. data labels to be
provided)
Font size should be not less than 24
Tan delta should be in percentage (for e.g. 0.34 to be provided instead of
0.0034)
Capacitance should be in pF and no decimal digit to be displayed)

9
TAN DELTA
ICT#1 HV R-PH
550 1
530 0.9
510 0.8
490 484 484 484 0.7
485
470 0.6
450 0.5
430 0.39 0.39 0.37 0.39
0.4
410 0.3
390 0.2
370 0.1
350 0

Capacitance in pf
Tan delta 10
CAPACITANCE

ICT#1 HV Y-PH

TAN DELTA
450
430
410399 402 403

390 402

370
350
330
310 0.28

2900.21 0.21
0.22
270
250

Capacitance in DATE OF MEASUREMENT


pf
CAPACITANCE-

ICT#1 HV B-PH
1
0.9
444 442 442 0.8
445
0.7
0.6
0.5
0.43 0.4
0.39 0.37 0.38
0.3
0.2
0.1
0

Capacitance in
DATE OF MEASUREMENT pf
Tan delta
CAPACITANCE -

ICT#1 IV R-PH

TAN DELTA
1
370
0.9
350
330 0.8
310 312 304 302
0.7
308
290 0.6
270 0.5
250 0.4
230
0.3
210
0.22 0.2
190 0.2 0.17 0.18
170 0.1
150 0

Capacitance in
DATE OF MEASUREMENT pf
CAPACITANCE -
330 ICT#1 IV Y-PH 1

TAN DELTA
306 307 307 312
310 0.9
290 0.8
270 0.7
250 0.6
0.5
230 0.4
210 0.3
190 0.22 0.21 0.15 0.16
0.2
170 0.1
150 0

DATE OF MEASUREMENT
Capacitance in pf
Tan delta
CAPACITANCE-

ICT#1 IV B-PH

TAN DELTA
330309 311 3131
310 306 0.9
290 0.8
270 0.7
250 0.6
0.5
230 0.4
210 0.3
190 0.15 0.15 0.18
0.17 0.2
170 0.1
150 0

DATE OF MEASUREMENT
Capacitance in pf
Tan delta
C A PA C ITA N C E

TA N D E LTA
ICT#1 LV R-PH
189
190 185 185
1
186

0.9
170
0.8
150 0.7
130 0.6
0.5
1100.34 0.38
0.4
0.35 0.33
90 0.3
0.2
70
0.1
50 0

Capacitance in pf
Tan delta DATE OF MEASUREMENT
C A PA C ITA N C E

TA N D E LTA
ICT#1 LV Y-PH
190 175 176 175
174

170
150
130
1100.34 0.35 0.35 0.33

90
70
50

Capacitance in pf
Tan delta DATE OF MEASUREMENT
C APAC ITANC E-

TA N DELTA
ICT#1 LV B-PH
210197 198
0.8
198

190 199
0.7
170 0.6
150 0.5
0.41

1300.38 0.38 0.370.4

110 0.3
90 0.2
70 0.1
50 0

DATE OF MEASUREMENT Capacitance in pf


Tan delta
C A PA C ITA N C E

TA N D E LTA
ICT#2 HV R-PH

462 463 464 462

0.39 0.39 0.35


0.34

DATE OF MEASUREMENT
Capacitance in pf
Tan delta
C A PA C ITA N C E

TA N D ELTA
ICT#2 HV Y-PH
1
462 464 467 0.9
464
0.8
0.7
0.6
0.5
0.39 0.38 0.4
0.36
0.34
0.3
0.2
0.1
0

Capacitance in pf
Tan delta DATE OF MEASUREMENT
C APAC ITANC E-

TAN D ELTA
ICT#2 HV B-PH
1
466 466 464
463
0.9
0.8
0.7
0.6
0.5
0.38 0.37
0.4
0.34
0.36
0.3
0.2
0.1
0

Capacitance in pf
DATE OF MEASUREMENT Tan delta
C A PA C ITA N C E

TA N D ELTA
ICT#2 IV R-PH
330 1
310
309 307 310 309
0.9
290 0.8
270 0.7
0.6
250
0.5
230
0.4
2100.28 0.3
0.23
190 0.2 0.2
0.2
170 0.1
150 0

Capacitance in pf
DATE OF MEASUREMENT
Tan delta
C A PA C ITA N C E

TA N D E LTA
ICT#2 IV Y-PH
330 1
310 308 312 310 313
0.9
290 0.8
270 0.7
0.6
250
0.5
230
0.4
210 0.3
190 0.25 0.22
0.18 0.2
0.18
170 0.1
150 0

Capacitance in pf
Tan delta DATE OF MEASUREMENT
C A PA C ITA N C E

TA N D E LTA
ICT#2 IV B-PH
330314 314
1
312 311
310 0.9
290 0.8
270 0.7
0.6
250
0.5
230
0.4
2100.29 0.3
190 0.2
0.2
0.21
0.2
170 0.1
150 0

Capacitance in pf DATE OF MEASUREMENT


Tan delta
C A PA C ITA N C E

TA N D E LTA
ICT#2 LV R-PH
210 196
1
190196 197
193
0.9
0.8
170
0.7
150 0.6
130 0.5
0.360.4
0.38
1100.4 0.31
0.3
90
0.2
70 0.1
50 0

Capacitance in pf
Tan delta DATE OF MEASUREMENT
C A PA C ITA N C E

TA N D E LTA
ICT#2 LV Y-PH
210 1
1840.9
190184 184
180
0.8
170
0.7
150 0.6
1300.46 0.5
0.4

110 0.43 0.35 0.4


0.3
90
0.2
70 0.1
50 0

Capacitance in
pf DATE OF MEASUREMENT
C A PA C ITA N C E

TA N D E LTA
ICT#2 LV B-PH
210195 196 196 196
1.0
190 0.9
0.8
170
0.7
150 0.6
130 0.5
110
0.36400 0.36900
0.4
0.34100

0.34300
0.3
90
0.2
70 0.1
50 0.0

Capacitance in pf
Tan delta DATE OF MEASUREMENT
Status of Shaded store for RIP Bushings
Sl Substation No of RIP *Shaded Store Remarks (Action Plan for
bushing (Available/Not Construction of store if not
available/ Available) available)
requisition
given
Arasur
Not available.
RHQ is taking
action for
replacement

* If shaded store is available then photograph of same is to be included in presentation

28
Status of Commg. of On line DGA

Equipment Total Commissioned Balance Action plan

765kV Bus reactors 1- 0

765kV Line Reactors 1- 0

765kV ICT 1- 0

Online DGA Not


400kV ICTs Available

400kV Reactors 0

*Action Plan of commg. of On Line DGA:


Note : Mention the Quantity as per the provision of existing contract

29
Performance of On line DGA
Comparison with lab
Make Total Installed Defective Not commd. results*
details to be separately mentioned in a
sheet

Calisto NA

Kelman NA

Serveron NA

A Sensor NA

A Eberle NA

*Take care of accuracy limits as per TS during comparison with lab DGA
i.e. about 20ppm / 5%
Note : Mention the Quantity as per the provision of existing contract
30
Status of Integration of On line DGA with SCADA/NTAMC

Mode of
Equipment Total Integration Integration Balance Action plan
Completed (MODBUS/
61850

765kV Bus reactors 1- NA

765kV Line Reactors 1- NA

765kV ICT 1- NA

400kV ICTs NA

400kV Reactors NA

31
Status of Commg. of On line dry out

Equipment Total Commissioned Balance Action plan

765kV Bus reactors 1-

765kV Line Reactors 1-

765kV ICT 1- On line dry out is not available

400kV ICTs

400kV Reactors

Note : Mention the Quantity as per the provision of existing contract

32
Performance of On line dry Out

Make Total Installed Defective Not commd. Remarks*

Transec

Velcon NOT AVAILABLE AT ARASUR SS

Thermo syphon
filter

The inlet and outlet ppm and no nos of cartridge replaced at any site
to be mentioned.

Note : Mention the Quantity as per the provision of existing contract in


the total installed column.

33
Validation of Fiber Optic Sensors

Name of the Validation Done If not Action


Make ICT/Reactor Y/N taken

PROVISION IS NOT AVAILABLE

Note : Temperature measurement data to be given in Excel format.

34
Compliance of Circulars
Sl.No Description Yes/No Action plan if not
done
1.0 Use of twin conductors on neutral side of NA Not Applicable at
single phase 765kV ICTs Arasur SS
2.0 Earthing of spare single phase NA Not Applicable at
Transformers and Reactors as per IOM Arasur SS
dated 13.04.2015
3.0 Status of providing insulation tap/sleeves Planned to be carried
on tertiary conductor/bus as per IOM out within two weeks
dated 13th May, 2016

4.0 Storing of spare ICT/Reactor as per


discussion held during 10th CTC meeting
(Photograph of storage to be given)
5.0 Implementation of Committee Partially done. Status
Recommendation for security of S/S as furnished to Regional
per IOM Dtd. 18.01.2017 AM.

35
Status Drive Mechanism Overhauling - CB
Sl Total No of Make of Voltage No of CBs O/H Action Plan of O/H for
*CBs due for CBs Class Completed remaining CBs along with
O/H Details of CBs (Bay Details)
due for O/H
1
2
3 No circuit breaker is due for O/H
4

*Drive Mechanism O/H Schedule Hydraulic Mechanism after every 15 years & Pneumatic
Mechanism after every 10 years

36
DCRM Signature of Circuit Breaker
Sl Bay No Make of Date of DCRM Evaluation Remarks/ Findings
CBs carried out of DCRM
Signature
done by
RHQ
1 202 CGL 11.08.2016 DCRM Found Normal
2 203 CGL signatures Found Normal
12.08.2016 are yet to
3 204 CGL 26.10.2016 send to Found Normal
4 205 CGL 31.10.2016
Regional Found Normal
AM. Reports
5 206 CGL 02.11.2016 are under Found Normal
6 207 CGL 02.03.2017 preparation Found Normal
7 208 CGL 03.11.2016 Found Normal
8 209 CGL 03.11.2016 Found Normal
1) DCRM Signature Analysis Done by Sites/RHQ AM

2) If any abnormality found during last DCRM Signature, of the same shall be
shown during the meeting. Further sample DCRM signatures taken in last
one year to be shown.
37
DCRM Signature of Circuit Breaker
Sl Bay No Make of Date of DCRM Evaluation Remarks/ Findings
CBs carried out of DCRM
Signature
done by
RHQ
1 415 BHEL 10.12.2016 DCRM Found Normal
2 414 BHEL 05.12.2016 signatures Found Normal
are yet to
3 413 BHEL 07.12.2016 send to Found Normal
4 412 BHEL 12.12.2016 Regional Found Normal
AM. Reports
5 411 BHEL 25.11.2016 are under Found Normal
6 410 BHEL 10.11.2016 preparation Found Normal
7 407 CGL 19.11.2016 Found Normal
8 408 CGL 21.11.2016 Found Normal
1)9 404
DCRM CGL Analysis
Signature 28.02.2017
Done by Sites/RHQ AM Found Normal
10 405 CGL 05.03.2017 Found Normal

2) If any abnormality found during last DCRM Signature, of the same shall be
shown during the meeting. Further sample DCRM signatures taken in last
one year to be shown.
38
Status of Commissioning of NGR Bypassing Scheme in 765kV System

Completed Action plan if


Equipment Feeder Name Rating Make or not not
Completed completed

Not Applicable as no reactor available at station

All 765kV/400kV Reactors

39
Status of Commissioning of NGR Bypassing Scheme in 400kV System

Completed Action plan if


Equipment Feeder Name Rating Make or not not
Completed completed

Not Applicable as no reactor available at station


Status NGR Surge Arrester Replacement 765kV Line Reactors

Sl Feeder Name Replacement of LA Action plan


carried out Yes/No
1
2
3
Not Applicable
4

Note
1) For NGR rating 1600 ohm, 2 Nos 132kV, 12kJ/kV surge arrestors to be
provided in parallel.
2) For NGR rating other than 1600 ohm, surge arrestor rating 5kJ/kV, to be
replaced with 132kV 12kJ/kV rating surge arrestor.

41
Status of Shaded Store GIS Substation
1) Whether Shaded Store Available or Not -
2) If Yes, then photograph of same is to be included in
presentation
3) If No, Action plan for Construction of Shaded Store

Not Applicable for Arasur SS

42
Status of Commissioning of CSD Devices
Action
Equipment Total Procured Commissioned Balance plan

400kV Bus reactors

400kV Switchable LR

765kV Bus reactors

765kV Switchable LR

765kV side of ICT

400kV side of 765/400 kV 2 No ICTs are available. But CSD is not installed
side ICT

*Action Plan: Details of CB like s/s, Bay etc (where CSD is yet to be
commissioned) & action plan for commissioning of CSD
43
Status of Commissioning of CSD Devices

1) As per 2nd Central Asset Management review meeting, CSD graphs


are to be taken in every closing and opening operation of Transformers
and also opening of the Reactors and evaluated by various sites/Region.

2) CSD Graphs/DR for Transformer closing & Reactor opening for the
last operation to be shown .

CSD is not installed in any of the ICTs at Arasur SS

44
post Monsoon THRC Plot dt 30.12.2016
140

120
3RD Harmonic Leakage Current

100

80

60

40

20

0
0 5 10 15 20 25 30 35 40
Number of LA
Pre Monsoon THRC Plot dt 14.03.2017
140

120
3RD Harmonic Leakage Current

100

80

60

40

20

0
0 5 10 15 20 25 30 35 40
Number of LA
Status of THRC measurement
Sl No Bay Phase Rating Pre- Monsoon Post- Monsoon (Dec 2014)
Locati (KV)
Date of Resisti Total 3rd Date of Re Total 3rd
on
Measure ve Curre Harmo Measurem sis Curren Harmo
ment curren nt in nic ent tiv t in nic
t in A Resisti e A Resisti
A ve cur ve
current ren current
in A t in A
in
A

1 404 R 390 14.03.17 8 722 2 30.12.16 10 705 2.5


2 404 Y 390 14.03.17 13 692 3.25 30.12.16 13 656 3.25
3 404 B 390 14.03.17 15 778 3.75 30.12.16 15 767 3.75
4 407 R 390 14.03.17 10 756 2.5 30.12.16 10 745 2.5
5 407 Y 390 14.03.17 13 720 3.25 30.12.16 12 648 3
6 407 B 390 14.03.17 14 722 3.5 30.12.16 14 699 3.5
7 410 R 390 14.03.17 8 679 2 30.12.16 8 689 2
8 410 Y 390 14.03.17 12 727 3 30.12.16 12 626 3
9 410 B 390 14.03.17 12 686 3 30.12.16 12 675 3
10 413 R 390 14.03.17 8 725 2 30.12.16 7 764 1.75
11 413 Y 390 14.03.17 10 645 2.5 30.12.16 10 611 2.5
47
12 413 B 390 14.03.17 13 729 3.25 30.12.16 13 701 3.25
Status of THRC measurement
Sl No Bay Phase Rating Pre- Monsoon Post- Monsoon (Dec 2014)
Locati (KV)
Date of Resisti Total 3rd Date of Re Total 3rd
on
Measure ve Curre Harmo Measurem sis Curren Harmo
ment curren nt in nic ent tiv t in nic
t in A Resisti e A Resisti
A ve cur ve
current ren current
in A t in A
in
A

13 205 R 216 14.03.17 6 770 1.5 30.12.16 5 761 1.25


14 205 Y 216 14.03.17 5 762 1.25 30.12.16 4 751 1
15 205 B 216 14.03.17 5 830 1.25 30.12.16 4 828 1
16 206 R 216 14.03.17 20 862 5 30.12.16 20 63 5
17 206 Y 216 14.03.17 7 780 1.75 30.12.16 6 753 1.5
18 206 B 216 14.03.17 5 720 1.25 30.12.16 4 702 1
19 208 R 216 14.03.17 5 780 1.25 30.12.16 5 747 1.25
20 208 Y 216 14.03.17 5 765 1.25 30.12.16 4 721 1
21 208 B 216 14.03.17 9 780 2.25 30.12.16 9 783 2.25
22 209 R 216 14.03.17 5 788 1.25 30.12.16 5 788 1.25
23 209 Y 216 14.03.17 4 744 1 30.12.16 4 734 1
48
24 209 B 216 14.03.17 10 782 2.5 30.12.16 10 775 2.5
Status of THRC measurement
Sl No Bay Phase Rating Pre- Monsoon Post- Monsoon (Dec 2014)
Locati (KV)
Date of Resisti Total 3rd Date of Re Total 3rd
on
Measure ve Curre Harmo Measurem sis Curren Harmo
ment curren nt in nic ent tiv t in nic
t in A Resisti e A Resisti
A ve cur ve
current ren current
in A t in A
in
A

25 412 R 390 14.03.17 8 820 2 30.12.16 8 815 2


26 412 Y 390 14.03.17 8 766 2 30.12.16 8 714 2
27 412 B 390 14.03.17 14 752 3.5 30.12.16 14 708 3.5
28 415 R 390 14.03.17 7 842 1.75 30.12.16 7 832 1.75
29 415 Y 390 14.03.17 9 756 2.25 30.12.16 9 742 2.25
30 415 B 390 14.03.17 12 854 c3 30.12.16 12 844 3
31 202 R 216 14.03.17 5 788 1.25 30.12.16 5 784 1.25
32 202 Y 216 14.03.17 17 812 4.25 30.12.16 17 808 4.25
33 202 B 216 14.03.17 12 820 3 30.12.16 12 819 3
34 203 R 216 14.03.17 6 820 1.5 30.12.16 6 816 1.5
35 203 Y 216 14.03.17 5 780 1.25 30.12.16 5 758 1.25
49
36 203 B 216 14.03.17 12 850 3 30.12.16 12 834 3
Thermo-vision Scanning
Date of last measurement: 20.03.2017
Number of measurement in last one year: 4
Critical locations: Nil
Action taken/Planning:

(Thermo-vision scanning:20.03.2017)

50
CVT Secondary Voltage Measurement
Details of Secondary Voltage Measurements All CVTs in-service
Sl CVT Details (Bay & Make Bus I Bus II Sec. Voltage Difference w.r.t to Difference w.r.t
No phase) Voltage Voltage (in V) Core Bus I to Bus I I
III (Line Voltage- (Line Voltage-
(subject CVT) Bus-I Voltage) Bus-II Voltage)

1 410 Bay R PH BHEL 63.50 63.40 62.62 -0.88 -0.78

2 410 Bay Y Ph BHEL 64.10 64.00 63.90 -0.20 -0.10

3 410Bay B Ph BHEL 63.70 63.51 63.10 -0.60 -0.41

4 413 Bay R Ph BHEL 63.50 63.40 62.90 -0.60 -0.50

5 413 Bay Y Ph BHEL 64.10 64.00 63.20 -0.90 -0.80

6 413 Bay B PH BHEL 63.70 63.51 63.50 -0.20 -0.01

7 404 Bay R Ph AREVA 63.50 63.40 63.70 0.20 0.30

8 404 Bay Y Ph AREVA 64.10 64.00 63.90 -0.20 -0.10

9 404 Bay B Ph AREVA 63.70 63.51 63.80 0.10 0.29

10 407 Bay R Ph AREVA 63.50 63.40 63.80 0.30 0.40

11 407 Bay Y Ph AREVA 64.10 64.00 63.90 -0.20 -0.10


Note :
12 1) 407
No ofBay
CVTsBreplaced
Ph in AREVA 63.70on secondary
last one year (based 63.51voltage measurement).
63.50 -0.20 -0.01
2) In case line is having FSC, inter phase/inter circuit comparison to be done.
51
CVT Secondary Voltage Measurement
No of CVTs replaced in last one year (based on secondary voltage measurement) - 0
Sl CVT Details (Bay & Make Bus I Bus II Sec. Voltage Difference w.r.t to Difference w.r.t to
No phase) Voltage Voltage (in V) Core Bus I Bus I I
III (Line Voltage- Bus- (Line Voltage-
(subject I Voltage) Bus-II Voltage)
CVT)
1 205 Bay R Ph BHEL 61.46 60.80 61.07 -0.39 0.27
2 205 Bay Y Ph BHEL 61.50 61.20 61.20 -0.30 0.00
3 205 Bay B Ph BHEL 61.70 61.10 61.37 -0.33 0.27
4 206 Bay R Ph BHEL 61.46 60.80 61.47 0.01 0.67
5 206 Bay Y Ph BHEL 61.50 61.20 61.55 0.05 0.35
6 206 Bay B Ph BHEL 61.70 61.10 62.95 1.25 1.85
7 208 Bay R Ph BHEL 61.46 60.80 61.13 -0.33 0.33
8 208 Bay Y Ph BHEL 61.50 61.20 62.01 0.51 0.81
9 208 Bay B Ph BHEL 61.70 61.10 61.48 -0.22 0.38
10 209 Bay R Ph BHEL 61.46 60.80 61.03 -0.43 0.23
11 209 Bay Y Ph BHEL 61.50 61.20 61.57 0.07 0.37
12 209 Bay B Ph BHEL 61.70 61.10 61.61 -0.09 0.51

Note :
1) No of CVTs replaced in last one year (based on secondary voltage measurement).
2) In case line is having FSC, inter phase/inter circuit comparison to be done.
52
CT DGA Results
Date of
Make of CT Comm. - Date of Test H2 CH4 C2H4 C2H6 C2H2 CO CO2
Bay No. Phase
CT ppm ppm ppm ppm ppm ppm ppm

404 R AREVA 24.05.2012 17.05.2013 149 1 0 0 0 40 122


404 Y AREVA 24.05.2012 06.04.2014 287 2 0 0 0 45 89
404 B AREVA 24.05.2012 17.05.2013 13 1 0 1 0 30 112
405 R AREVA 24.05.2012 17.05.2013
124 1 1 0 0 105 223
405 Y AREVA 24.05.2012 17.05.2013 42 1 0 1 0 33 104
405 B AREVA 24.05.2012 17.05.2013 8 1 0 0 0 41 106

407 R 17.05.2013 76 1 0 0 0 36 126


AREVA 24.05.2012
407 Y AREVA 24.05.2012 17.05.2013 46 1 0 0 0 21 117
407 B AREVA 24.05.2012 17.05.2013 86 1 0 0 0 37 148
408 R AREVA 24.05.2012 17.05.2013 93 2 1 1 0 23 143
408 Y AREVA 24.05.2012 17.05.2013 38 1 1 1 0 29 113
408 B AREVA 24.05.2012 17.05.2013 162 1 1 1 0 28 159

53
CT DGA Results
Date of
Make of CT Date of Test H2 CH4 C2H4 C2H6 C2H2 CO CO2
Bay No. Phase Comm. - CT
ppm ppm ppm ppm ppm ppm ppm

410 R AREVA 27.07.2010 26.08.2010 4 3 2 1 0 154 422


410 Y AREVA 27.07.2010 26.08.2010 0 2 2 1 0 97 379
410 B AREVA 27.07.2010 26.08.2010 0 3 2 1 0 139 447
411 R AREVA 27.07.2010 03.11.2010 0 2 0 0 0 37 245
411 Y AREVA 27.07.2010 03.11.2010 0 3 0 2 0 72 380
411 B AREVA 27.07.2010 03.11.2010 0 2 0 0 0 37 224
412 R AREVA 27.07.2010 03.11.2010 0 2 0 0 0 22 262

412 Y 27.07.2010 03.11.2010 0 2 0 0 0 37 225


AREVA
412 B AREVA 27.07.2010 03.11.2010 0 3 2 0 0 102 393
413 R AREVA 27.07.2010 03.11.2010 0 2 2 0 0 86 377
413 Y AREVA 27.07.2010 03.11.2010 5 3 0 4 0 107 321
413 B AREVA 27.07.2010 03.11.2010 0 4 1 0 0 124 390

54
CT DGA Results
Date of
Make of CT Date of Test H2 CH4 C2H4 C2H6 C2H2 CO CO2
Bay No. Phase Comm. - CT
ppm ppm ppm ppm ppm ppm ppm

414 R AREVA 27.07.2010 18.12.2012 1 5 4 2 0 118 718


414 Y AREVA 27.07.2010 18.12.2012 3 3 2 1 0 125 457
414 B AREVA 27.07.2010 18.12.2012 2 3 2 1 0 0 544
415 R AREVA 27.07.2010 22.03.2013 2 4 2 1 0 125 636
415 Y AREVA 27.07.2010 22.03.2013 1 4 1 3 0 71 426
415 B AREVA 27.07.2010 22.03.2013 2 3 1 1 0 98 426
202 R AREVA 27.07.2010 20.10.2010 44 3 1 0 0 161 564
202 Y 27.07.2010 20.10.2010 177 4 2 0 0 309 691
AREVA
202 B AREVA 27.07.2010 20.10.2010 55 2 1 0 0 175 560
203 R AREVA 27.07.2010 20.10.2010 44 3 1 0 0 181 739
203 Y AREVA 27.07.2010 20.10.2010 71 3 1 0 0 243 580
203 B AREVA 27.07.2010 20.10.2010 48 2 1 0 0 154 523

55
CT DGA Results
Date of
Make of CT Date of Test H2 CH4 C2H4 C2H6 C2H2 CO CO2
Bay No. Phase Comm. - CT
ppm ppm ppm ppm ppm ppm ppm

204 R AREVA 27.07.2010 20.10.2010 224 4 2 0 0 448 755


204 Y AREVA 27.07.2010 20.10.2010 188 7 1 0 0 224 562
204 B AREVA 27.07.2010 20.10.2010 189 3 1 0 0 318 683
205 R AREVA 27.07.2010 20.10.2010 46 2 1 0 0 251 645
205 Y AREVA 27.07.2010 20.10.2010 45 3 1 0 0 194 658
205 B AREVA 27.07.2010 20.10.2010 88 3 1 0 0 281 469
206 R AREVA 27.07.2010 20.10.2010 45 3 1 0 0 206 813
206 Y 27.07.2010 20.10.2010 46 3 1 0 0 264 685
AREVA
206 B AREVA 27.07.2010 20.10.2010 96 4 0 0 0 252 716
207 R AREVA 27.07.2010 20.10.2010 13 2 0 0 0 54 625
207 Y AREVA 27.07.2010 20.10.2010 20 2 3 0 0 76 640
207 B AREVA 27.07.2010 20.10.2010 17 2 1 0 0 69 588

56
Commissioning status of Hot Spares for 765kV
Transformers & Reactors

Name of the Description of Date of Expected date of Number of times


substation spare Commissioning commissioning spare rotation
(*if not commd.) carried out

Spare Reactor
(Bus Reactor +
Line Reactor)

Spare
Transformer - Not applicable for Arasur SS -

Spare for Line


Reactor

Spare for Bus


Reactor

57
Wet Transformers & Reactors
Sl.No. Name of Oil parameters value Domino Value Action Plan
Transformer/ Date of BDV Value PPM Date of % RS
Reactors measurement Value measurement

Measurement indicates Dry at Arasur SS

Compliance of last MOM to be provided


58
Details of leakages in Transformers/ Reactors

Sl.No Description Make Sl.No Detail of Action


. leakages Plan
1 Transformer/ BHEL 6006421 Nil
Reactor
2 BHEL 6006422 Nil

59
Status of non-availability of Bay/Transformers/Reactors

SN Name of the Station Name of the Bays/ Non- Reason Action taken
Xmer/Reactors availability /Proposed
Since Restoration Date

1 -Nil-

60
Status of Healthiness of AC/ Fire fighting system

SN Name of the Station Healthiness of Fire In case not healthy, Action taken
fighting system * (Yes/ Reason /Proposed
No) Restoration Date

1 Arasur SS Yes

* Healthiness of Mulsifier/ Hydrant / NIFS and Smoke Detection system to be given

SN Name of the Station Healthiness of Air In case not healthy, Reason Action taken
Conditioning System /Proposed
(Yes/ No) Restoration Date
1 Arasur SS Split A/Cs are using
and are in working
condition
2

61
Status of Healthiness of DG Set/ Diesel Engine

SN Name of the Capacity of Healthiness of DG In Case not healthy, Action taken


Station Station DG Set Set (Yes/ No) Reason /Proposed
Restoration Date

1 Arasur SS 250kVA Yes

SN Name of the Station Healthiness of Diesel In Case not healthy, Reason Action taken
Engine (Yes/ No) /Proposed
Restoration Date

1 Arasur SS Yes

62
Connection Arrangement 765kV & 400kV - LA, CVT & BPI using
Twin Conductor
Sl Line Arrangement Remarks (Action plan for
Modified Yes/No modifying arrangement)

1 400kV Arasur Udpt Line I No


2 400kV Arasur Udpt Line II No
3 400kV Arasur-Karamadai I No Modification plan not initiated
yet.
4 400kV Arasur-Karamadai II No
5
6
7
8
9

63
Status of healthiness of Battery bank

Sl Description Make of Capacity as per Discharge test


Battery Name Plate Date Capacity
(in %)
1 220V Battery Bank -1 Amararaja 500AH 26.03.15 70%
2 220V Battery Bank -2 Amararaja 500AH 27.03.15 70%
3 50V Battery Bank -1 Amararaja 600AH 01.04.15 70%
4 50V Battery Bank -2 Amararaja 600AH 02.04.15 70%

New Batteries are procured and stock received at Site in April


2017. Installation yet to be carried out.
64
Status of T&P Availability
T&P NORMS FOR T&P Available Shortage

Man-lift with Self Propelled and One no. each for 765 KV & Available
Articulating Boom Lift with minimum 400 KV SS
250 kg Capacity at maximum height:
765/400 KV substation - 24 meter
400/220 KV substation - 13 meter

Offline Oil Filtration Plant of 10KLPH One no. each for 765 KV & Not Available
capacity or higher along-with power 400 KV SS
supply Cu cable and digital fine vacuum
meter.

Dry Air Generator, 80CFM or better with One no. each for 765 KV & Not Available
dew point of (-) 70 deg or better. 400 KV SS

65
Status of T&P Availability
T&P Norms for T&P Available Shortage

Battery Operated Platform Trolley to carry One no. each for Under
maintenance equipment/ materials in 765 KV & 400 KV procurement from
Switchyard with minimum capacity of 2000 kg. SS RHQ

SF6 gas handling plant with minimum 280 kg One no. each for Not Available
SF6 handling capacity along with coupling 765 KV & 400 KV
device for all make CBs & SF6 CTs and length SS
of hose pipe should be minimum 15 meter.

Standalone vacuum pump sufficient to pull One no. each for Not Available
vacuum for 765 KV auto transformer tank. 765 KV sub-station.

66
Status of T&P Availability
T&P Norms for T&P Available Shortage

4 Nos/ region Not Available in


SFRA Instrument Arasur SS

1 no. /Region Not Available in


FDS Instrument Arasur SS

1 no. / 5 SS Not Available in


Portable DGA Kit Arasur SS

1 No/ SS Not Available in


Online moisture Arasur SS
measurement kit

67
Status of T&P Availability
T&P Norms for T&P Available Shortage

1 No/ SS Not Available


THRC kit

Portable DGA Kit 1 No. / 765kV S/S

Tan & Capacitance 1 No./ SS Not Available

measurement kit having


variable frequency feature

68
Status of T&P Availability
T&P Norms for T&P Available Shortage
Tan & Capacitance At least 2 Nos./ Not Available

measurement kit having region


variable frequency feature (Subject to
(frequency range 20 Hz to availability of 01 no.
350Hz) kit /SS including kits
mentioned in above
row)
Small filter machine (1kL/Hr) 1 No./ 765kV S/S

69
Status of T&P Availability
T&P Norms for T&P Available Shortage

Oil Tanks Sufficient Oil tanks to


cater the requirement
of maximum capacity
equipment in each Not Available
substation to be
ensured

70
Status of Spare Availability
Sl Item/Equipm Required Actual available Shortag Procurement
N ent as per e (if any) Action/Remarks
norms
1 Transformers
(BHEL)
2 Reactors NA NA NA nA
(Make)
3 CB (BHEL & 1 420kV CB BHEL make 1 Nil
3AT2) & No
(CGL) 245kV CB CGL make 1
No
4 CT 2 420kV CT -4 No (2000 Nil
Amp))
245kV CT -3 nos (120%
Extended, 1600A)
245kV CT 1 no (150%
extended)

Current Rating for Isolators & CBs, Cap. for CVTs also needs to be specified 71
Status of Spare Availability
Sl Item/Equipm Required Actual available Shortage (if Procurement
N ent as per any) Action/Remarks
norms
5 CVT 245kV 1 ABB make 245kV 245kV 1 Order already placed
no CVT 1 Nos no from RHQ
420kV 1 420 kV CVT -1 No 420kV 1
Nos BHEL Make Nos

6 LA 390KV 2 216kV LA 1 No 390kV LA One number 420 kV


Nos; Oblum Make 02 No; LA is under diversion
216KV -2 216 kV LA from Udumalpet SS
Nos. 01 No
7 Isolators 420kV isolator 245kV
(Siemens) 3 nos Isolator 2
Nos
8 Wave Trap Not available

Current Rating for Isolators & CBs, Cap. for CVTs also needs to be specified 72
Status of Spare Availability
Sl Item/Equipm Required Actual available Shortage (if Procurement
N ent as per any) Action/Remarks
norms
9 BB relay PU 0 1 Recently Diverted to
Karur
Distance Main II-1 Main I 1 Diverted to Mysore.
relays Yet to return
BCU 1 Diverted to Karur
Spares for other relays are available.

Current Rating for Isolators & CBs, Cap. for CVTs also needs to be specified 73
Earth Resistance Measurement Without Grid

Sl. No. Earth Resistance Measurement Last Date of Value Measured


Measurement OHMS
1 ICTs Earth Pit 24.03.2016 & 31.03.2016 8 ohm & 8.5 ohm

2 Reactors Earth Pit No reactor No reactor

3 Substation Earth Pit 06.02.2017 8 Ohm

8
9

10
SF6 Consumption Data
Sl. Details Apr Jun Jul Sept Oct Dec Jan Mar
No. 2015 2015 2015 2016

1 Total SF6 gas in s/s 729 729 729 729


(present in all the
equipments like CTs,
CBs etc) (in kg)

2 Total SF6 Gas 0 0 0 0


Consumed for refilling
the equipments (in kg)

Remarks : No consumption in the year 2016-17


ORGANISATION CHART

SHRI AK DAS/ASST GM

SHRI K RAVICHANDRAN/DY MGR

SHRI B KANNAN/JE SHRI A BALASUBRAMANIAN/JE

SHRI A A ABHILASH/JE

SHRI S MATHIVANAN/SR TECH

SHRI T S NITHEESH/JR TECH


Details of major maintenance carried out since
last Asset Management meeting

Nil

77
Status of NTAMC integration work

1. NTAMC Communication between Local Station and RTU is found frequently


failed. RTU needs to be restarted to resolve the issue every time. However, a
permanent solution is to be found out.
2. Some of the change of status are not timely updated in the RTAMC. It is
observed that all status are reporting to NTAMC after restarts of Gateway as
GI( General Interrogation). Suspecting some issues in the communication
between RTU and Gateway.

78
Status of ERP implementation work
Created Closed
No of Maintenance Orders 326 326
No of Maintenance 324 324
Notifications

All store transactions are being carried out through SAP regularly

79
Any other critical issue for discussion

NIL

80