Professional Documents
Culture Documents
Problem of matching
parallel connected
CTs is not existant
Separate stub
protection can be
connected
Ratio of CT can be
selected to match
rating of circuit
ABB Group - 4 -
Sep 16, 2017
Protection in breaker and half system
ABB Group - 5 -
Sep 16, 2017
Protection in breaker and half system
Protection equipment associated with one and a half CB
system
ABB Group - 6 -
Sep 16, 2017
Protection in breaker and half system
Block diagram of trip and reclosing cooperation in breaker
and half system for a line transformer diameter
ABB Group - 7 -
Sep 16, 2017
Protection in breaker and half system
Autoreclosure
CB problems
Sep 16, 2017
Priority Unit
Group -A Group -B
Biased diff relay High imp diff relay
Back-Up relay (HV) Buchholz trip
Over fluxing relay Restricted E/F relay
Oil temp trip Back-Up relay (LV)
Pressure relief trip Overload relay
Delta wdg protection Wdg temp trip
OLTC trip
Oil level high/low
Neutral e/f relay
ABB Group - 19 -
Sep 16, 2017
Protection in breaker and half system
Trip logic Line CB
ABB Group - 20 -
Sep 16, 2017
Protection in breaker and half system
Trip logic Tie CB
ABB Group - 21 -
Sep 16, 2017
Protection in breaker and half system
Trip logic Transformer CB
ABB Group - 22 -
Sep 16, 2017
Protection in breaker and half system