You are on page 1of 32

JERAM SANITARY LANDFILL, KUALA

SELANGOR
(JSL)
SITE LOCATION

SITE
LOCATION
BACKGROUND

Air Hitam Sanitary Landfill was instructed to


be closed by 31st December 2006.

The cabinet has approved 2 sanitary landfill


sites in the State of Selangor.

The state government of Selangor has


identified all potential state owned land for
the landfill but none is suitable.

The decision to used private land for


sanitary landfill was decided.
BACKGROUND
~ cont.

Majlis Mesyuarat Kerajaan Negeri Selangor


(MMKN Ke 21/2006 ) has approved the
contruction of Jeram Sanitary Landfill (JSL) in
Jeram, Kuala Selangor.

The selection basis :


- Not in the water catchment area
- Far from residential area
- Below water intake point

JSL commenced operation on 1st January


2007.
SITE INFO

LOCATION : LOT 1595, 2958, 2959


JERAM, KUALA
SELANGOR
TOTAL AREA : 160 acre
TYPE OF SOIL : MARINE CLAY
CURRENT LAND USE : AGRICULTURE
TOPOGRAPHY : FLAT
NEAREST RESIDENTIAL : 3.8 km
AREA
NEAREST RIVER : SEMBILANG RIVER
DISTANCE FROM THE SEA: 8 km
SITE INFO

DESIGN CAPACITY : 1250 TONNE/DAY


CURRENT DAILY CAPACITY : 2100 TONNE/DAY
LANDFILL TYPE : LEVEL 4
LIFESPAN : 16 YRS
TOTAL AIR SPACE : 8 MILLION CU.M
TOTAL PHASE :6
CELL DEPTH : 3 m (base RL + 1 m)
HIGHEST PEAK : RL + 39 m
LINER TYPE : 2.00 mm HDPE/GCL
CONCESSION

CONSESION : 25 YRS FULLY PRIVATIZED

LOCAL COUNCIL INVOLVED: MDKS, MPSJ, MPK, MBPJ,


MBSA and MPAJ

TIPPING FEE : RM36.00/TONNE


OPERATION

Operation hour:
Monday Saturday : 7:00am - 9:00pm
Sunday : 8:00am - 4:00pm
Public holiday : 8.00am 7.00pm
All incoming trucks will be registered in the
weighbridge system.
Checking and weighing of incoming and outgoing
trucks.
Acceptable waste stream:
- domestic waste
- bulky waste and garden waste
- commercial waste
- construction demolition waste
WASTE STREAM FROM COUNCIL AND PRIVATE
WASTE COLLECTOR

COUNCIL/PRIVATE DAILY CAPACITY


(TON/DAY)
MBPJ 329
MBSA 480
MPSJ 393
MDKS 62
MPAJ 159
MPK 518
PRIVATE 199
TOTAL 2140
OPERATION

Machineries used at the landfill:-

- Track type bulldozer : 5 units


- Excavator : 4 units
- Dump truck : 4 units
- Landfill compactor : 2 units

The garbage truck will be directed to the tipping


platform as directed by the traffic controller.

Waste is pushed and compacted in the layer of


300mm - 500mm.
OPERATION
(Soil Daily Cover)

Soil cover was done on a daily basis.

To control the surface run-off and run on, leachate


generation, odor problem, uncontrolled gas
migration, lateral leachate and etc.

Type of soil : Marine clay

Thickness :150 - 500mm


OPERATION
(Alternative daily cover)

ADC was done on a daily basis.

To reduce odor problem, erosion, leachate


generation, increased aesthetic view and etc.

Type of material : PPW Woven Geotextile

15,000 30,000 sq.m


OPERATION
(Leachate Treatment Plant)

Equipped with collection system from landfill cell.

Used Sequential Batch Treatment (SBR) for


biological treatment.

Consist of 5 aerated lagoon and 2 retention pond.


Finally, the leachate will be treated at Advance and
Polishing Treatment equipped with mixing tank,
Disolved Air Floatation unit, sand filter and
activated carbon filter.
OPERATION
(Leachate Treatment Plant) ~ cont.

Daily average capacity : 450 m3

18 parameters to be complied as stated in the EIA.

Treated leachate released to Sembilang River


OPERATION
(Environmental Monitoring)

Leachate Treatment Plant - Weekly

Surface water sampling - Monthly

Grounwater sampling - Monthly

Ambient Air sampling - Quaterly

Noise monitoring - Every 6 months

Type of waste - Daily


OPERATION
(Landfill Gas Management)

Methane gas produced from decomposition of


waste will be extracted from the landfill through
vertical gas well.

Methane gas will be sent to the flaring unit and


flared to reduce gas accumulation and odor
problem.

The quantity and quality of the gases will be


recorded for future power generation from landfill
gas.
Landfill Gas Management
GAS WELLS GAS WELLS DRILLING COMPACTION OF WASTE RECEIVING OF WASTE

INSTALLATION OF GAS WELL


HEAD 1 Perimeter Fencing 9 Restored Surface
TNB SUBSTATION
2 Surface Run-off Drainage 10 Leachate Pumping Sump

3 Groundwater Monitoring 11 Perimeter Drainage System

4 Lining System 12 Leachate Treatment Plant (LTP)

5 Leachate Collection 13 Landfill Gas Power Generation


System Plant
6 Leachate Drainage Pipe 14 Operation Office

7 Gas Well for Landfill Gas 15 Weighing Bridge

8 Capping 16 Screening Tree

GAS WELLS SYSTEM ENGINES

LANDFILL GAS MEASUREMENT GAS PIPING SYSTEM GAS DELIVERY UNIT (GDU)
CLOSURE

Closure and post closure works:

- Capping and landscaping works

- Post Closure Maintenance- Leachate


treatment, grounwater monitoring, surface
water monitoring, landfill settlement.

- Landfill Gas Management (Energy + CDM)


LANDFILL CLOSURE
Capping

Soil cover (300mm) Landfill Gas Wells

Liner Clay Layer (1000mm)

Top Soil (200-400)mm Grass or Vegitative Cover

Drainage System
SEKIAN, TERIMA KASIH