Log Frame Matrix ZIMRE Park FTTH Project

Project Description Indicators Source of Verification Assumptions


Goal

To increase TelOne footprint in the fiber Incidence of customer loss due to a lack Customer request and connection
to the home space, particularly for areas of TelOne presence in ZIMRE Park records collected by TelOne Sales teams.
that do not have ICT services and reduced by 30% by 2017.
replacement for those with a bad copper
center.
Deliverables/ Objectives/
Outcomes

Improved quality of service and coverage Potential customers turned down due Monthly service quality and coverage There are no developments that could
for ZIMRE Park residents. unavailability of infrastructure reduced surveys conducted by Client Services. result in new stands by 2017.
to 0% (compared to levels in 2014)
The GPON service quality remains
unchanged
Outputs

1.1 Reduced volume of fecal waste 1.1 60% of household fecal waste is 1.1 Annual sample survey conducted by -Waste water treatment meets national
discharged into river disposed of via latrines or sewage municipality between 2009 and 2012. standards
1.2 Reduced volume of household refuse connections. 1.2 -fishing cooperatives meet obligations to
directly dumped into the river system 1.2 establish waste collection systems
Activities

1.1.1 Conduct baseline survey of 1.1.1 Baseline data (Knowledge Practice 1.1.1 6 month progress report -Municipal budgets for improvements to
households Coverage) for household waste 1.1.2 Extension team progress reports sewage systems remain unchanged.
1.1.2 Prepare and deliver public management exists 1.1.3 Approved project charter from the
awareness campaign 1.1.2 Schedule of visits of mobile teams Ministry of Public Works
1.1.3 Prepare engineering specifications completed Etc.
for latrines and expanded sewage 1.1.3 Engineering plans approved by
network. Ministry of Public Works
1.1.4 Etc. Etc.
1.2.1 Etc.