EVALUACIN METALRGICA DE UN YACIMIENTO

FERNANDO ZEBALLOS
JACOBS PER S. A.
YACIMIENTO MINERAL

Prospeccin
Modelo de recursos

Exploracin

2
POR DNDE COMENZAR?

U P2O5
Cu Ag Au

Sn Zn Pb
Fe

Litologa Mineraloga Ensamble


Concentracin

Lixiviacin en tanque Alteraciones


Liberacin
Proceso SART Estado de oxidacin

Lixiviacin a presin Contaminantes


Subproductos
Lixiviacin cida / frrica Mineral refractario
Cianuracin en pila Ley del mineral
Chancado convencional Molienda SAG / FAG
3
RECURSOS Y RESERVAS

4
ETAPAS DEL PROYECTO

Metodologa Convencional Fases Front-End Load

Etapas de pre-implementacin
Estudio conceptual Fase 1 - Identificacin
Estudio de pre-factibilidad Fase 2 - Proyecto conceptual
Estudio de factibilidad Fase 3 - Proyecto bsico
Etapas de implementacin
Ingeniera bsica Fase 4 - Ejecucin
Ingeniera de detalle Fase 5 - Operacin
Construccin

5
INGENIERA DE PROCESOS EN UN PROYECTO

Item Conceptual PFS FS Basic Eng. Detailed Eng.

Process Engineering
Process Flow Sheets Assumed Preliminary Optimized Finalized Finalized

Bench Scale Tests If Available Recommended Essential Essential Complete


Pilot Plant Tests Not Needed Possibly Probably Essential Complete
Energy & Material Balance Not Essential Preliminary Optimized Finalized Complete
Preliminary P&IDs Not Needed Not Needed Recommended
P&IDs and Specifications Essential Complete
Design Criteria Required Essential Essential Complete
Utilities Engineering
Rough Utility requirements (steam, water balance, Preliminary Optimized Essential Complete
electricity, etc.)

Utilities, Heat Balance Preliminary Optimized Essential Complete

Utilities Process Flow Diagrams Preliminary Optimized Essential Complete

Plant & Infrastructure Sites


Plant Capacity Assumed Preliminary Optimized Finalized Finalized

Tailings Facility Conceptual Preliminary General Detailed Complete


Plant and Other Sites Assumed General Approximate Specific Finalized
Maps and Surveys None If Available Available Detailed Finalized
Soil & Foundation Tests None None Preliminary Final Finalized
Site Visit by Project Team Possibly Recommended Essential Essential Complete

6
COMPONENTES DE UN PROYECTO MINERO

Recursos minerales / Reservas de mena


Plan minero
Proceso de beneficio
Suministros principales: agua, energa y reactivos
Estudio de impacto social
Estudio de impacto ambiental
Estudio de cierre del proyecto
Permisos
Estudio tcnico - econmico del proyecto
Financiamiento
Construccin / Comisionamiento / Puesta en marcha

7
MUESTREO METALRGICO

Testigos de taladros de perforacin


Perfil del depsito mineral

Muestra de medio taladro HQ Muestras de rechazos (-10 #)


8
PRUEBAS METALRGICAS
(Chancado y Molienda)

OBJETIVOS DE LAS PRUEBAS DE CONMINUCIN:

Tipo de Chancado Molienda Molienda Consumo


Chancado
chancadora de pebbles de bolas SAG de acero

TIPOS DE PRUEBAS DE CONMINUCIN


TYPE OF STUDY

TYPE OF TEST SCOPING PFS FS Basic


Engineering
Comminution
Bond work index (rod and ball)
Bond abrasion index
SAG power index (SPI variability) ()
Bond work index (crushing) -
MacPherson autogenous grinding index -
Autogenous media competency (Advanced) 1 -
UCS / PLI ()
Fracture frequency ()
JK Tech drop weight test - ()
AG / SAG pilot plant - -
Final process design criteria - -
Note:
() As required

9
PRUEBAS METALRGICAS
(Concentracin y desaguado)
OBJETIVOS DE LAS PRUEBAS DE CONCENTRACIN:
Separacin
Flotacin Espesamiento Filtrado Gravimetra Medio denso
magntica

TYPE OF STUDY
TIPOS DE PRUEBAS DE CONCENTRACIN

TYPE OF TEST SCOPING PFS FS Basic


Engineering
Flotation
Preliminary reagents / pH
Rougher grind-grade-recovery
Regrind and cleaner flotation
Locked-cycle flotation testwork -
Ultra fine grinding - -
Optimization of major ore type (variability) -
Pilot plant (complex / difficult ores) - -
Final process design criteria - -
Dewatering
Concentrate thickening - ()
Concentrate filtration - ()
Tailing thickening - ()
Tailing filtration - () () ()
Final process design criteria - -
Heavy minerals
Gravity gold recovery - ()
Heavy liquid separation - -
Gravity / magnetic
Pilot plant - -
Final process design criteria - -
Note:
() As required
10
PRUEBAS METALRGICAS
(Hidrometalurgia)
OBJETIVOS DE LAS PRUEBAS HIDROMETALRGICAS:
Lixiviacin Carbn en Carbn en
Geotecnia Hidrologa
en pila lixiviacin pulpa

TYPE OF STUDY
TIPOS DE PRUEBAS HIDROMETALRGICAS

TYPE OF TEST SCOPING PFS FS Basic


Engineering
Leaching
Sequential analysis (Cu) test
Leaching diagnostics (Au) test () () () ()
Small diameter columns (variability)
Intermediate diameter columns -
Large diameter columns - -
Bottle roll (variability)
Batch agitation leaching (CIL/CIP)2 - ()
Semi-continuous (CIL/CIP)3 - -
Agitation design tests (rheology, suspension) - - -
Kappes test4
Load-percolation test4 ()
Load-permeability test4 - -
Soil water characteristic curve (SW CC) estimation 4 - ()
Trafficability tests 4 - ()
Triaxial tests4 - ()
Final process design criteria - -
Note:
() As required
2 As required for special situations; e.g, flotation concentrates, high clay content ores.

3 As required to determine carbon loading, adsorption kinetics, carbon fouling, etc.

4 Geotechnical heap leach testwork.

11
CARACTERSTICAS DE LAS MUESTRAS

TESTIGO DE TALADRO HQ:

DIMETRO DE LOS TUBOS DE PERFORACIN:


Size Hole (outside)
diameter, mm
AQ 48
BQ 60
NQ 75.7
HQ 96
PQ 122.6
CHD 76 75.7

CHD 101 101.3


CHD 134 134

CARACTERSTICAS DE LAS MUESTRAS METALRGICAS:


Testwork Size Weight per sample Comments
Bond work index (rod mill) -3.35 mm 10 Kg Ok
Bond work index (ball mill) -1/2" 15 Kg Ok
Bond abrasion index -3/4", +1/2" 1.6 Kg Ok
SAG power index (SPI variability) F100=-3/4" and F80=1/2" 2 Kg Ok
Crushing work index (CW I) -76, +51 mm 20 rock specimens Suggested core type is PQ.
UCS Ratio L/D > 2 -- --

12
OBJETIVOS DE LAS PRUEBAS METALRGICAS

Evaluar la recuperacin metalrgica del mineral.


Determinar el proceso de beneficiamiento.
Definir los parmetros de diseo o Criterios de Diseo de Procesos.
Generar informacin que complemente el modelo de bloques y
soporte el plan de mina.
Aportar informacin para la evaluacin econmica del yacimiento.

13
USO E INTERPRETACIN DE RESULTADOS

DISTRIBUCIN GEOESTADSTICA DE PARMETROS

Dureza del mineral


Geoestadstica Dureza estimada Error
+
Para cada bloque
Informacin geolgica

14
SIMULACIN DE PROCESOS

Seleccin de equipos
Dimensionamiento de equipos
Diseo de procesos

15
DIAGRAMA DE FLUJOS

Diagrama de flujos de un circuito de chancado primario


16
BALANCE DE MASA
(Balance en estado estacionario y dinmico)

Determina el ingreso, salida y acumulacin (inventario) de materiales.


Sirve como base para el dimensionamiento de equipos, tuberas,
servicios.
Genera las bases para la estimacin del CAPEX, OPEX y Anlisis
econmico.
Permite saber la demanda de agua y energa del proceso.

En algunos proyectos se hace necesario el balance de energa


inclusive.

17
DIAGRAMAS DE TUBERAS E
INSTRUMENTACIN (Final)

18
ARREGLO GENERAL DEL PROYECTO

SX y EW
Concentradora
Pila de ROM

Pila de lixiviacin

Depsito de estril y baja ley


Mina

19
COSTOS DE OPERACIN (OPEX)

BASES PARA LA ESTIMACIN DEL COSTO DE OPERACIN


Item Conceptual PFS FS Basic Eng. Detailed Eng.

Labour Rates Assumed Investigated Get Contracts Get Contracts Contracts


Labour Burdens Assumed Calculated Calculated Calculated (2*) Contracts

Power Costs Assumed Actual Actual Contract (2*) Contracts

Fuel Costs Assumed Verbal Quotes Letter Quotes Contract (2*) Contracts

Expendable Supplies Assumed Verbal Quotes Letter Quotes Contract (2*) Contracts

Reagents Assumed Verbal Quotes Letter Quotes Contract (2*) Contracts

Parts Assumed Verbal Quotes Letter Quotes Letter Quote Vendor Quotation

Economic Analysis

Discounted cash flow Manual Detailed Detailed Detailed Detailed

Taxation Data Generalized Detailed Detailed Detailed Detailed

Revenue Base Historical Current Letters of Indication Written Propsal Written Proposal

Use of Estimates Comparison / Rejection General Feasibility Budget Funding

(2*) Se debe solicitar contratos si el proyecto es a mediano plazo

20
CONMINUCIN
(Circuitos de chancado)

Dos etapas con opcin de circuito abierto/cerrado Tres etapas con opcin de circuito abierto/cerrado

Cuatro etapas con opcin de circuito abierto/cerrado

21
CONMINUCIN
(Molienda SAG)

CIRCUITO SAG CIRCUITO SAC

22
CONMINUCIN
(Double Stage Grinding)

CIRCUITO DSAG

Baja generacin de pebbles.


La funcin de la zaranda podra ser asumida por un trommel.

23
CONMINUCIN
(Semi-Autogenous-Ball Milling-Crushing)

Aumenta la capacidad de
tratamiento en la molienda.

CIRCUITO SABC-A

Incrementa la capacidad de
tratamiento en el SAG.
Mayor exigencia en la etapa de
chancado que el SABC-A, porque
se necesita menor granulometra
en el producto.
CIRCUITO SABC-B
24
PROCESOS METALRGICOS

Cobre:
Lixiviacin en pilas Vs concentracin por flotacin

Oro:
Lixiviacin en pilas Vs lixiviacin en tanques

25
MANEJO DE RELAVES

Convencional

Alta densidad

Pasta

Filtrado y apilado (dry stacking)

26