STUDY AREA

Pangsa Perindu Blok A,


Butterworth.
LEARNING OUTCOMES
At the end of this lesson, we are able to:
i. Determination of boundary mark and datum.
ii. Compute third mark between PO and observation.
iii. Perform daily check and DFT.
iv. Perform solar observataion.
v. Determination of height of each storey and measurement of the dimension of the unit.
Datum to Start Survey vs Datum Cadastral
Datum Cadastral Datum to Start Survey
i. NDCDB point. If there is no boundary mark are found or not
able to stand on the boundary mark.
i. Assumed bearing.
Solar Obs, Daily Check and DFT
Differential Field Test (DFT)
Daily Check i. Carried out at the start of every new survey job.
i. Carried out at the start of everyday job. ii. If the DFT exceed the limit 0.010m, the total station
ii. It can be done by re-measuring the distance of the last need calibration.
surveyed line on the previous day. iii. Procedure:

Solar Observation
i. It is carried out in the early morning and late evening.
ii. 2 sets of observation with grid bearing differ by not
more than 10.
iii. Distance between observation station to RO should
not less than 30m
Computation of Third Mark
New

PO

New

PO

Diff Pk2: Diff BKL4:


4161.491mE - 4161.493mE = -0.002mE 4175.309mE - 4175.315mE = -0.006mE
447.578mS - 447.578mS = 0.000mS 501.418mS - 501.439mS = -0.021mS

Radial = -0.002m Radial = 0.022m


Internal Angle
Pk3 - Pk2 Internal Angle

Pk3 (PO)
Pk2 276 53 12 (PO)
276 53 12 - 168 26 51 = 108 26 21
(NEW)
276 53 08

(NEW)
Pk3 -BKL4 276 53 08 - 168 26 56 = 108 26 12

(PO)
168 26 51
Diff Internal angle:
(NEW) 108 26 21-108 26 12= 00 00 09
168 26 56
Result:
BKL4 09 < Tolerance from KPUP, 10.
The different internal angle are acceptable.
Methodology of Strata Survey

Solar
Reconnaissance Proved Datum DFT Traverse
Observation

Determine Area Dimension


Calculate SIFUS Offset Building
of parcel Parcel
Traverse

Linear Misclose: 1:29 000

Angular Misclosure: 58
Detailing
Raw data from TS:
Survey to Determine the Heights of Each Storey
Survey to determine the heights of each storey:

i. Survey to determine the heights of each storey is to be


carried out and recorded to the nearest 0.01m.
ii. To measure the level of each floor, the instrument is
called Distometer through the stairs of the building.
Share Unit
Determining share unit:
The calculation of share unit is based on type of parcel, area of overall floor parcel and accessory parcel if
available.

Calculation of share unit:


A x F1 x F2 + sum of (BxF3)

where A=Area, B=Accessory Parcel

F2

F1
Jadual Strata
CONCLUSION

In conclusion, all survey works are follow the tolerance


needed.