Floods are one of the most common hazards in
Albay and it kills millions of people as what typhoon
Reming did to Albayanos in 2006. The European
Union (EU) Floods Directive defines flood as a
covering by water of land not normally covered by
water. Flooding may occur as an overflow of water
from water bodies, such as a river or lake, in which
the water overtops or breaks levees, resulting in
some of that water escaping its usual boundaries.
Floods can also occur in rivers when the flow rate
exceeds the capacity of the river channel,
particularly at bends or meanders in the waterway.
Floods often cause loss of lives, damage to buildings and other
structures especially when they are in the natural flood plains
of rivers like that in Taysan Resettlement Legazpi City.
Residents in this place have traditionally lived and worked by
the Panal River because the land is flat, fertile and because it
provides easy travel and access to commerce and industry. But
during heavy rains or when the place is visited by typhoons
Panal River overflows and causes flooding along Taysan
Resettlement area. It has been one of the most devastating
natural disasters that the residents have been experiencing for
the past decades. Floods not only damaged property and
endanger lives of humans and animals, but have other effects
as well. Rapid runoff causes soil erosion as well as sediment
deposition problems downstream. Spawning grounds for fish
and other wildlife habitat are often destroyed. Floods also
interfere with drainage and economic use of lands.
Floods can be overcome by building structures such as
constructing new drainage facilities to help tackle the
flooding problem. Another structure that helps prevent
floods is the so slope protection structures. Slope
protection structures help to stabilize the slope and can last
a lifetime in protecting surrounding properties from
damage and people from injury if they are maintained in a
good and functional condition at all times. The data needed
to be able to construct a Slope Protection structure includes
the actual elevation and cross section of the river. After the
collection of the required data and the topography of the
place, it is all set to construct a Slope Protection Structure.
The primary aim of the proposal is to prepare a
topographic map for the Panal River along Taysan
Resettlement, Legazpi City section as preliminary data
for the design of a slope protection construction. It also
includes the following objectives:
1. To know the actual cross-section of the river per
station
2. To know the elevation of cross-section per
station?
3. To plot the center line profile of the river
4. To determine the areas prone to floods and
erosions
5. To help the community against flood and other
flood-related damages
This project focuses on the survey of
topography of the Panal River 800 meter long
along Taysan Resettlement, Legazpi City. The
project is not to construct a slope protection
structure but to collect the preliminary data
needed in constructing slope protection
structure in that particular place. This
includes the actual elevation of the river and
its cross section. The scope will be within the
periphery of the study.
Table 1. Work Plan, Equipment and Personnel
ACTIVITIES EQUIPMENTS MAN(QUALIFICATION)
Week 1 Preliminary preparation N/A -Contract Executive
-Gathering Data -Survey Project Manager
-Site Inspection
Week 2 Field Work (Topographic Survey) -Total Station -Survey Party Chief
-Automatic Level -Survey Instrument man
-Stadia Rod & Steel Tape -Survey Technician
-Prism -Rodman

Computation of Data -Computer -Survey Party Chief


-Field Notebook - Survey Instrument Man
Plotting and Mapping AutoCAD -CAD Supervisor
A4 Bond Paper -CAD Technician
Week 3 Technical Report Writing -Contract Executive
-Survey Project Manager
Table 2. Personnels Duties and Qualifications

PERSONNEL QUALIFICATION DUTIES AND RESPONSIBILITIES

Contract Degree qualified in a relevant Monitoring the contractors progress and


Executive subject such as Quantity performance to ensure goods and services
Surveying or Civil Engineering conform to the contract requirements.
Working experience in civil Authorizing payments consistent with the
engineering construction, contract terms.
preferably with some Exercising state remedies, as appropriate,
consultancy or project where a contractors performance is
management background deficient.
experience.
Survey Party Experienced with boundary Performs first line supervisory and
Chief survey, topographic survey and advanced journey level survey work
construction staking. involved in directing and performing
Ability to perform physical labor preliminary topographic and construction
and physically maneuver around field engineering surveys.
construction sites Reads construction maps to create a
Strong organizational skills with physical survey of the area being
attention to detail and accuracy. examined Computes survey data
PERSONNEL QUALIFICATION DUTIES AND RESPONSIBILITIES

Survey Requires the knowledge of Secondary supervisor on a survey party.


Instrument survey field techniques, Operate angular, electronic distance
Operator/ survey language, measuring, levelling and GPS
instrument conventional equipment, instruments in field survey operations.
man and other electronic Maintain and check the survey
surveying equipment & instruments to ensure proper operating
accessories and some condition and accuracy.
supervisory techniques. Assist the Party Chief in the
Perform manual labor and computation of survey data and the
safely and efficiently review of project data prior to the
operate and use associated beginning of field surveys.
tools and equipment.
Rodman Ability to (1) follow Perform job duties as assigned by the
directions from supervisor, crew Party Chief
(2) to work continually Assist members of the assigned survey
outside in all types of crew with various job duties
weather conditions Responsible for packing needed survey
Will be carrying survey equipment and supplies in trucks for
equipment to the job sites daily work assignments
on a daily basis; equipment
can weigh up to 35 lbs.
PERSONNEL QUALIFICATION DUTIES AND RESPONSIBILITIES

Survey He/she must have a working Adjust and operate surveying


Technician/ knowledge of surveying instruments
Researcher equipment along with an Run rods for benches and cross-section
understanding of advanced elevations.
survey technologies. Position and hold the vertical rods, or
He/she have strong computer targets, that theodolite operators use
skills, including CAD drafting and for sighting in order to measure angles,
design and word processing. distances, and elevations.
CAD Must be a graduate of a CAD Production and supervision of
Supervisor program from a recognized Survey/Geomatics drawings sets.
institution, diploma or degree
program
Must be competent in the use of
the latest versions of AutoCAD
and must maintain a strong
technological base
CAD High degree of proficiency using Prepare maps and drawings from survey
Technician AutoCAD drafting software field data
Experience preparing TINs, Make adjustments to field calculations
surface models, and contours Generate quantities of various materials
and survey related drawings from surface models
Education and training with Adhere to drafting standards
emphasis on drafting, mapping Make sure all work is backed up and
Table 3. Cost and Fee Estimate

TASK ACTIVITY QTY RATE LABOR


PRELIMINARY Data gathering and
PREPARATION Site Inspection
Contract 5 hours 4 500 22 500
Executive
Survey Project 8 hours 3 200 25 600
Manager
TASK ACTIVITY QTY RATE LABOR
TOPOGRAPHIC Preliminary Preparation
SURVEY Survey Party Chief 5 hours 2 500 12 500

Survey Tech 4 hours 800 3 200

Site Survey
Survey Party Chief 48 hrs (8 hours for 6 2 500 120 000
days)

Survey Instrument man 48 hrs (8 hours for 6 900 43 200


days)

Rodmen 48 hrs (8 hours for 6 850 40 800


days)
Survey Tech 36 hrs (6 hours for 6 800 28 800
days)
TASK ACTIVITY QTY RATE LABOR

Computation Survey Party Chief 5 hours 2 500 12 500


of Data Survey Instrument Man 5 hours 900 4 500

Plotting and CAD Supervisor 8 hours 750 6000


Mapping CAD Technician 8 hours 700 5 600

A4 bond Paper 12 sheets 400 4 800

Technical Contract Executive 24 hours (8 hours 4 500 108 000


Report for 3 days)
Writing
Survey Project Manager 24 hours (8 hours 3 200 76 800
for 3 days)

Survey Party Chief 24 hours (8 hours 2 500 60 000


for 3 days)

Sub-total Php 574, 800


TASK ACTIVITY QTY RATE LABOR
Others Snacks 30 (twice for 15 20 4 800
days) for 8
persons
Lunch 15 days (8 50 6 000
persons)

Sub-total Php 10, 800


NET EXPENSES Php 585, 600
10 % contingency fund Php 58, 560
TOTAL EXPENSES Php 644, 160
Based from the study, it was concluded that in order to prepare a
topographic map of a river the researcher must collect preliminary
data needed in constructing a slope protection structure in that
particular place. First, know the actual cross section of the river
together with the elevation of cross section at every station. And also
it is needed to determine the centerline profile of the river and with
that we will be able to identify the areas that are prone to floods.
Gathered data must be analyzed and interpreted. Cost of the project
must be given importance.
It was concluded that before conducting a survey of a river in a
particular area, one must consider the place, its demographic profile
and history on floods. The effect of the project to residences, to the
municipality and to the environment in general must also be given
importance.
Lastly, it was concluded that the proposed topographic survey of the
river will be advantageous to the community in protecting lives and
properties. The project will also give the proper data for designing a
slope protection structure.