WBS of the civil works

OF
Simhadri Thermal Power Plant of NTPC Ltd

Prepared By-
Rupesh Sharma
Mokshit Shah
Gautam Kumar Mandal
Partha Pratim Chakravarti
Karthikeyan
MBA CPM GROUP-1 Sub Group- 1
MBA Construction Project Management
CONTENTS
INTRODUCTION TO COAL BASED THERMAL POWER PLANT
LOCATION OF THE PLANT
DIFFERENT SEGMENTS/WORKPACKAGES/OF COAL POWER PLANT
DETAILS OF SEGMENTS/WORKPACKAGES/OF COAL POWER PLANT
WORKING OF POWER PLANT (VIDEO)
WBS
About the Project
 Project : Simhadri Thermal Power
 Located in Vishakhapatnam District, Andhrapradesh
 “One of the Maharatna Power Generation Utilities”
 2 units of 500 MW for Andhrapradesh State Electrical Power Distribution
 2 units of 500 MW for other Neighbourhood State Electrical Power Distribution
Area of the Project : 3000Acre
Description Planned Actual

Project Cost Rs. 41 Billion Rs. 37 Billion

Generation Cost Rs. 2.11 /KWh Rs. 1.36 /KWh


A coal based thermal power plant consists of large number of integrated plants/systems and
equipment having mechanical, electrical, instrumentation & control and civil components. The plant
systems and equipment can be broadly classified into following two categories

 Main Plant comprising of steam generator, steam turbine and generator along
with their associated auxiliaries.
 Balance of Plants (BOP) system which includes major components of
 coal handling plant,
 ash handling plant,
 fuel oil handling
 unloading system,
 water treatment system,
 circulating water system fire protection, detection & alarm system.

Requirement of Main Plant system can be standardized and are not site specific except for coal quality
and cooling water temperature which are fairly uniform for indigenous coal and Indian ambient
conditions.
BAY OF BENGAL
Fuel oil handling Water treatment
Coal handling plant Ash handling plant
System plant

circulating water Fire protection, Electrical and C&I


Civil Works
system detection &alarm system System

Each section covers the technical description of the plant systems and their various alternatives, design criteria/
guidelines for selection of plant system & equipment, broad technical details, and applicable codes & standards.
The coal handling plant (CHP) in a thermal power station covers unloading of coal, its crushing,
storage and filling of boiler bunkers.

CIVIL WORK
• Overground transfer points and Crusher
House \Electrical & control buildings listed
SYSTEM DESCRIPTION below:
• Coal unloading system • Main Switch gear cum central control room
• Track hopper building near crusher house
unloading system • tippler/track hopper complex
• Wagon tippler • Office complex for O&M staff and storage
unloading system rooms near main control room
• Coal crushing Below and above ground level which include
• Coal Stacking & • basements, equipment foundations
Reclaiming at Stockyard Coal Handling Plant including vibration isolation systems,
• Dust Control System grounding,
and Ventilation system • slabs, beams, columns, footings, rafts, walls,
steel frames, brick walls, stairs, trenches,
pits, access roads, culverts, conveyer
CODES AND STANDARDS galleries, trestles, penthouses, underground
• IS:226 : Structural Steel (Standard Quality) tunnels, crusher house, transfer towers,
• IS:2062 Steel for General Structural Purposes Specification buildings for switchgear and control room &
drainage
In a coal based thermal power plant, huge amount of ash is generated which has to be disposed off
continuously. The ash handling system covers evacuation of ash and disposal in wet, semi wet and dry form.

CIVIL WORK
1. Combined ash slurry pump house along
with related sumps.
SYSTEM DESCRIPTION
2. Ash water pump house along with related
• Bottom Ash (BA) System
sumps.
• Fly Ash System (ESP, Air
3. Air compressor house
preheater)
The work shall involve
• Ash Water System
• earthwork in excavation, extensive de-
• Ash Disposal System
watering,
Dry disposal
• shoring and strutting, sheet piling,
Wet disposal
• back filling around completed structures
• Ash Handling System
and plinth protection,
Operation
Ash slurry pump house
Ash Handling Plant • piling, concreting including reinforcement
• form work, brick work, fabrication and
Ash Water Pump House
erection of structural / miscellaneous
• Economiser and Air Pre-
steel works.
heater Ash Handling System
CODES AND STANDARDS
• BS-1571 (Part I&II). Acceptance test for positive
displacement compressors and
• IS 277 Specification for Galvanized Steel Sheet
The fuel oil handling and storage system in a thermal power station covers unloading of
the fuel oil, its storage and transfer to the day oil tanks.

CIVIL WORK
Buildings to be provided shall include the
following
• Fuel Oil Pump House
• Fuel Oil Tanks and dykes around it
SYSTEM DESCRIPTION
• Paving required in the FO area
• Fuel oil unloading system
• Access roads to all buildings of Fuel oil.
• Fuel oil storage and
The work shall involve
transfer to day tanks
• Earthwork in excavation, extensive de-
• LDO storage and transfer
watering, shoring and strutting, sheet
to day tanks
piling, back filling around completed
• Steam and Condensate
structures and plinth protection,
system
• Drain oil system Fuel Oil Handling System • Concreting including reinforcement and
form work, brick work, fabrication and
erection of structural / miscellaneous
• Anchor bolts, R. C. C. trenches with
CODES AND STANDARDS covers, laying and testing of water
• API 620 Recommended rules for design and construction pipes, sanitation, water supply,
• API 600 Code for design & construction of gate valve drainage, damp proofing, water
proofing
Water is required for condenser cooling, ash disposal, heat cycle make up, equipment cooling, service water, potable
applications and other miscellaneous applications. Raw water available from river, canal etc. is required to be treated to
suit the particular application. Various types of treated water uses are:
a) Clarified water as cooling tower make-up and service water
b) De-mineralised water for heat cycle make-up, equipment cooling system makeup,
condensate polishing plant regeneration etc.
c) Filtered & disinfected water for potable water requirement.

CIVIL WORK
Buildings facilities to be provided shall
include
• raw water reservoir & pump house,
SYSTEM DESCRIPTION aerator, stilling chamber, inlet/outlet
• Raw Water Reservoir and Pump House channels, clarifiers, chemical house,
• Pre-Treatment (PT) Plant • sludge pump house, clarified water
• Filtration System storage tank and pump house
• Chlorination System • DM plant building, degassed water
• DM Plant Water Treatment Plant storage tanks, DM water pump
• Waste Water Treatment System house, neutralizing pit, potable water
tanks, service water tanks
• Chlorination plant building, waste
CODES AND STANDARDS water treatment plant, centrifuge
• IS : 458 - Concrete pipes (with and without reinforcement). house etc.
• IS : 783 - Code of practice for laying RCC pipes.
Circulating water system is provided for supplying water to the condenser for condensing the LP turbine
exhaust steam. It is also used for secondary cooling of boiler and turbine auxiliaries.

CIVIL WORK
Buildings to be provided shall include
• CW pump house & MCC room
• CW forebay & channels
• Cooling towers
SYSTEM DESCRIPTION • CW treatment plant
• Circulating Water Pumps • Chlorination plant including ton
• Cooling Towers
• CW Make- up and Treatment
container storage
System The work shall involve
• Sea Water Cooling • Earthwork in excavation, de-
watering, shoring and strutting,
plinth protection, area paving, piling,
Circulating Water System • RCC work, brick work, fabrication and
erection of structural steel
• Finishes such as plastering, painting,
CODES AND STANDARDS flooring, acid/alkali proof lining.
• IS : 822 - Code of procedure for inspection of welds. • RCC trenches with covers, laying and
• IS : 783 - Code of practice for laying RCC pipes testing of water pipes, sanitation,
• IS: 804 Rectangular pressed steel tanks water supply, drainage, damp
proofing, water proofing
The fire protection, detection and alarm system is provided for thermal power station to protect the plant against fire
damage to avoid loss of life and property. Fire detection system is provided to detect fire in its incipient stage and to
actuate the fire protection system to extinguish fire. Alarm system gives warning in case of fire to prompt fire fighting
staff and other operation personnel to take necessary action. In addition to fixed automatic system, portable and mobile
systems are also provided for fire extinguishing.

CIVIL WORK
• Hydrant system
• Automatic high velocity water
SYSTEM DESCRIPTION (HVW) & medium velocity water
• Fire detection and alarm system (MVW) spray system
• Fire station & other facilities • Automatic fixed foam system for
• Sirens fuel oil storage tanks
• Fire water storage tank • Automatic inert gas system
• Fire Station & Control room • Portable and mobile fire
extinguishers
Fire Protection, Detection & The work shall involve
Alarm System • Earthwork in excavation, RCC
work, brick work, fabrication and
CODES AND STANDARDS erection of structural steel pipes,
• IS : 694 PVC Insulated Cable for working voltages upto and • Painting, flooring, RCC trenches
including 1100V with covers, laying and testing of
• IS : 13947 Specification for low voltage switch gear and water pipes, drainage, water
control gear proofing
The Electrical And Control & Instrumentation System in a thermal power station to Enhance Availability , Flexibility and
Profitability of power generation over the entire life cycle with optimum possible O&M cost , it helps to control plant with
precession

CIVIL WORK
Buildings to be provided shall include
SYSTEM DESCRIPTION • Transformer room
• Motor room
• Transformers
• Erection of electrical transmission
• Motors
tower
• Switchgears and Non Segregated
• Busduct room
Busduct
The work shall involve
• DC System
• Earthwork in excavation, de-
• Power and Control cables and Laying
Electrical And Control & watering, plinth protection, area
& Termination
• Earthing and Lightning Protection Instrumentation System paving, RCC work, brick work,
fabrication and erection of structural
system
steel,
• Finishes such as plastering, painting,
flooring, acid/alkali proof lining, RCC
CODES AND STANDARDS trenches with covers, laying ,damp
IS : 694 PVC Insulated Cable for working voltages upto and proofing, water proofing
including 1100V
IEC-60298 High voltage metal enclosed switchgear and
control gear.
IT involves Construction of Foundation Structures, Cable Trench & Infra structure Development necessary for the project,
Duct Bank ,Pipe Laying ,Drainage and Sewage Works and

CIVIL WORK
Underground Structures
• Foundations for Building
• Pile Foundations (only RCC piles)
SYSTEM DESCRIPTION
• Foundation for rotating Equipment
• Site Grading and Leveling
• RCC water retaining structures like
• Roads
storage tanks.
• Storm Water Runoff Drainage
• Substructures of Pump Houses,
• Drains and Plumbing
channels/tanks and other
• Concrete/Steel Structural
underground structures
Design
• containing liquid
• O&M office
• Liquid Retaining/Conveying
Structures
Civil Works (General) Overground Structures
• Earthwork in excavation, RCC work,
CODES AND STANDARDS brick work, fabrication and erection
• Different Bureau of Indian standards codes (IS) of structural steel pipes,
• Special publications (SP) • Painting, flooring, RCC trenches with
• Indian Road Congress standards (IRC) covers, laying and testing of water
• National Building Codes (NBC) pipes, drainage, water proofing
Simhadri Power
Plant

Pre-construction Construction Project Closer

Submission of As
Prerequisites Site Mobilization Sub Structure Super Structure MEP Work Electric work
Built Drags.

Installation & Fabrication and


Construction Infrastructure Testing &
Excavation RCC & Civil Work Commissioning Erection of Electrical
Methodology development Commission of plant
Mech. Devices Towers

Fabrication and
Procurement Location of Installation of Documents Archived
Foundation Steel Fabrication Installation of Piping
Strategies Temporary Facilities Electrical Cables Preparation
System

Installation and Installation and Installation of Step


Geotechnical Project Completion
Commissioning of Commissioning of up Transformers &
Investigation Certificate
Fire Fighting System Fire Fighting System Turbine Generator

Lightening and
General Layout Plan Automation System Earthling protection Project Handover
system

Automation System
MBA Construction Project Management

You might also like