CONTENTS
• Project Data

• Objectives

• Scope of work

• Output

• Literature Review
PROJECT DATA
Bridge type Railway Over Bridge
Total length of bridge 850 m
Length of ROB 74 m
Carriageway width 11 m
Overall width 12.08 m
Average thickness of deck slab 0.250 m
Height of crash barrier 0.9 m
Thickness of crash barrier 0.34 m
Number of longitudinal girders 4
Type and number of bearings POT PTFE ; 4
Thickness of wearing coat 0.065 m
Median width 0.58 m
Median thickness 0.365 m
Number of piles 4
OBJECTIVES
The following objectives shall be fulfilled at the end of the thesis work-

• Understand the behavior of the bridge.

• Analyze, design and detail the bridge elements with focus on substructure.

• Proper documentation of the data.

• Detailed drawings and calculation.


SCOPE OF WORK

• Selection of site and collection of site information such as soil profile, traffic
studies, seismic zone.
• Literature review of codes and relevant material.
• From the data collected, work out the preliminary dimensions of the bridge,
type of bridge, type of foundation, method of construction to be used.
• Preparation of plan and elevation of the structure and estimate the
approximate dimensions of the structure.
• Calculate loads and perform analysis.
• Design and detail the bridge substructure elements.
OUTPUT
The output shall incorporate the following-
• Analysis report for sub-structure and super structure.
• Design document for sub-structure.
• Detailed drawings of bridge elements.
LITERATURE REVIEW
Case Study referred
• Analysis and Design of ROB at Kumaranellur, India
Prof. Ancy Joseph, Lakshmi G. , Meera R. Krishna
The paper deals with design of ROB with carriage way width of 7.5 m and overall width 12m. Total length of the 2 lane
bridge is 312 m with spans of 33m. The bridge was designed as composite bridge with pre stressed I girder and RCC deck
slab. Piers of height 7 m and diameter 3 m were used. The grade of concrete for pre stressed girder was taken as M40 and
for steel as Fe 415.
Codes referred-
• IRC 5: 2015 General Features of Design
• IRC 6: 2016 Load and Load Combinations
• IRC 21: 2000 Cement Concrete-Plain and Reinforced
• IRC 78: 2000 Foundation
• IRC 112: 2014 Code of Practice for Concrete Road Bridges
• SP 105: 2015 Explanatory handbook to IRC 112
• IS 2911: 2010 Part 1- Concrete Piles section 1 and 2
Books referred-
• V.K. Raina Concrete Bridge- Analysis, Design and Economics
• Krishna Raju Design of bridge
THANK YOU