PLANNING ASPECTS:
400kV
TG Beam at 15 m with peak 23m
TSP Beam at 23m with peak 30 m
G5 Beam at 15m (Twin Moose)
GSP Beam at 23m
220kV
TA Beam at 11m
TB Beam at 11m & 17.5m
TC Beam at 11m & 17.5m with peak 22m
G1 Beam at 11m (Single Moose)
G2 Beam at 11m (Twin Moose)
G3 Beam at 17.5m (Single Moose)
Typical dimensions between
equipments
400 kV 220 kV 132 kV 66 kV
CB&ISO 10.5 m 6.5 m 3.75m 3m
ISO&CT 7m 4m 2.5 m 2m
CB&CT 7m 3m+road+5 m 2.5 m 2m
Placement of
AC driven main pump
DG driven stand-by pump
Jockey Pump
Air Vessels
AC Distribution Board cum pump control panels
Fire Water Tank
Miscellaneous
Placement of
LT Station (ACDB, DCDB, Battery Bank &
Battery Chargers)
Diesel Generator Set with AMF Panel
Security hut
Office Buildings
Other residential buildings
LAYOUT OF COLONY & SUBSTATION COMPLEX