Broken Wires
Waviness
Bird cage
Wire Rope Defects
Loop deformation
Loose wires
Nodes
Wire Rope Defects
Thining of the rope
Kinks
Flat area
Survey of Removal of Wire Rope
• Broken wires
– 5% of the total no. of wires in the rope in 10Xd
– 5 broken wires between two adjacent strands
within a length of 10Xd
• 15% reduction in diameter
• Corrosion
• Damaged due to heat
• Rope deformation as shown
Lifting Tackles-mtc
• Mark strength wise for proper use
• Check each & every link of the chain.
• Check wire rope slings
– String(any cut)
– Rope deformations(bulging,twisting)
– Corrosion
• Check hook deformation & joint fittings
• Replace on condition basis
Lifting Tackles Photo
Nylon Items
• Nylon pulleys
– Edge damage
– Bearing damage
– Groove worn out
• Roller,Gliding plate
– Worn out
• Replace
SLI Items
• Main Hook Load Sensor
• Boom Angle Sensor
• Slew Angle Sensor
• Aux. Hook Load Sensor
• Display Board
• Micro Processor
Chips(X1 Card)
SLI Items
SLI System-mtc
• Do not bypass SLI system during operation.
• Protect cards from dusts
• Check functional test
• If any error found,call OEM representatives.
• OEM-M/S PAT, Germany
– M/S Mechanica, Pune.
– M/S Hytec Micro Measurement,Delhi
SLI-AMC
Suspension coil & disc spring
• Springs used in secondary suspension
– Coil
– Disc
• Change if required
• Suppliers
– M/S G.D. Spring,KKK for Coil Spring.
– M/S Gala Precision Technology Ltd,Thane for Disc
Service Engineer Group
• Function
– Attend the crane at division & check crane in
running condition.
– If any problem ocurrs, sort out it.
– Check records for maintaining the crane as per
RDSO mannual
• Staff-One engineer+ Four technicians.
POH & MLR
Schedule Time period Cumulative life
EXISTING 1st POH 8 yrs 8 yrs
MLR 6 yrs 14 yrs
2nd POH 6 yrs 20 yrs
Condemn 6 yrs 26 yrs