OCT-29-2013
www.huawei.com
2º Step (UNET/CME/NASTAR):
• Frequency changes VAL90B07
• Frequency changes VAL90B08
• External 2G VAL90B07
• External 2G VAL90B08
• External 2G3G in VAL90R07
• External 2G3G in VAL90R08
3º Step (Netac):
• Legacy sites in the refarming
4º Step: (Netway)
• Change the frequencies in the repeaters affected
5º Step (CNA)
• AVE Ericsson
* 15 MHz
Firstly UNET, import Engineer Parameters from SmartRNO or from M2000 and GIS.
1º Define a polygon in 10 km from the last LTE site and HO statistics/geographical
situation.
2º Send to the customer for the acceptance and start to work in the frequency plan
.
3º Firstly, Create a Neighbor Planning in the UNET and after extract a Interference
Matrix from Nastar where the MRs are located. Later combine these two parts,
define the caracteristics of the refarming (release 10MHz or 15MHz) and launch
automatic allocation.
4º Last step and more important, it is necesary to check the frequency plan with HO
statistics, coBCCH-Distance… and try to solve the problems
Refarming Valencia (2 Step)
Once the frequency plan has done….
Extract template GCELLFrequency from CME
Update template data offline with the new frequency plan, main
parameters are:
GCELL (NCC / BCC); GCELLFREQ; GTRX; GTRXHOP; GTRXCHANHOP ...
In adittion, we need to update external 2G-2G/ 2G-3G in both BSCs/RNCs.
Synchronize again to
load the updated template
and see the inconsistencies
that appear.
Once everything is
loaded generate scripts
in the CME and
organized for loading in
scheduled work at night
Refarming Valencia (3 Step)
Legacy can be Nokia or Siemens, and use NETAC is used for apply the scripts for
change.
Refarming Valencia (4 Step)
-Change 50 repeaters, for this task depends on the software of the vendor
(Powerwave, Andrews..)
Netway
Refarming Valencia (5 Step)
- Ave Ericsson:
GSM_RADIO_GCELL_
ControllerName EXT2GCELLNAME Project
MAD60B05 V1405E1 AVE Ericsson
MAD60B05 V1406E1 AVE Ericsson
MAD60B05 V1407E1 AVE Ericsson
MAD60B05 V1408E1 AVE Ericsson
MAD60B05 V1409E1 AVE Ericsson
External 2G and 3G in the VDF RNCs/BSCs VDF with the rest of the OSP sites
Templates CME.
Examples:
RNC
BSC
Refarming Valencia (Optimization Phase)
Refarming 10MHz Valencia performed successfully
Degradation on expected thresholds:
* DCR 1800 deviation 20.74% (weekly W0/W-1 comparison)
* Dual DCR deviation 6.88% (weekly W0/W-1 comparison)
Refarming Valencia (Optimization Phase)
Degraded comparison day 29 October
with 22 October :
DCR DCS: 16.5%.
Comparison Monday 28 October before
refarming with 11 November
2G DCR: 6.54%.
Last week we have done in these top cells degradation the following actions:
• BCCH changed in 6 cells
• HSN changed in 5 cells
• Optimizing HR in the TOP cells.
• SDCCH HO allowed enabled.
Refarming Valencia (Acceptance Phase)
These are the kpis of the acceptance after the last changes and reach the
acceptance.
We reach this target with 9 sites with incompatibility configuration and
one site with the old frequencies (Metro site)
DCR 900 DCR DCS DCR agregado 2G DCR 3G DCR DUAL