COMPULSORY QUESTION

Right + 10
A
1. The theoritical flow capacity of gas wells if the bottomhole pressure could be reduced to atmospheric
pressure is called ? Absolute Open Flow Potential
2. The engineering plan for constructing the wellbore is called ? Drilling program
3. Behavior observed when a well reaches stabilized roduction from a limited drainage volume is called ?
Pseudosteady state
4. A component of a production logging tool that carries a radioactive solution that can be selectively released
into a flow stream is? Radioactive tracer
5. Mention five of six assumptions for the Darcy equation :
• The flow is laminar
• The fluid is homogeneous, saturated 100% by only one type of fluid
• No reaction occurs between the fluid with the rock
• The condition of steady state flow
• Incompressible fluid
• Isothermal
B
1. Use to plug large openings in the formations, to prevent the loss of whole drilling fluid. what is the name
of this additives ? LCM (Lost Circulation Materials)
2. What is purpose of Ultrasonic Cement Analyzer? Measuring Compressive Strength
3. What is the function of Marsh Funnel at Mud Laboratory? To measure mud viscosity
4. A chemical additive use to speed up the normal rate of reaction between cement and water which also
shorter the thickening time of the cement. What is the name of this additive? Accelerators
5. Mention Five types of Identifying Physical Properties of Minerals :
Crystal form ,Color, Streak, Luster, Cleavage, Fracture, Hardness, Tenacity, Specific gravity , Taste,
Magnetism, Reaction with acid, Striations
Toss-up and Bonus question
Toss-up :
Right +10, wrong -10
Bonus :
Right +20
1. A safety valve installed in the upper wellbore to provide emergency closure of the producing conduits in
the event of an emergency is ? Subsurface Safety Valve
2. A hypothetical / artificial flow velocity calculated as if the given phase or fluid were the only one flowing or
present in a given cross sectional area is called ? Superficial velocity
BONUS QUESTION
Mention 3 sand control techniques !
Plastic consolidation, resin coated gravel, slotted liners or screens, gravel packing, frac pack, rate exclusion,
maintanance and workover, selective completion practices, high energy resin placement

3. A semi-solid mixture of hydrocarbons with carbon numbers mainly higher than 25 is? Petrolatum or
Petroleum Jelly
4. An indicator for the interchangeability of fuel gases such as natural gas, liquefied petroleum gas (LPG), and
town gas and is frequently defined in the specifications of gas supply and transport utilities is ? Wobbe
Number
BONUS QUESTION
The distance from mean water level to the bottom of the hull of jackup rigs while the unit is jacked up in the
operating condition is called ? Air gap
5. A shallow drilling method, about 20 meters deep from the seabed to weaken the seabed in order to allow the jack up rig’s legs to
penetrate deeper is called ? Swiss cheese drilling
6. The liquid hydrocarbons are colorless and highly flammable. It is obtained by fractional distillation of petroleum at 150 ° C and 275
° C. carbon chains from C12 to C15. What is the name of the fluid ? coal oil/ kerosene/ kerosine/ paraffin/ paraffin oil / Turbosina
BONUS QUESTION
If the reservoir is known OOIP (Original Oil In Place), Np (Oil Production Cumulative) and RF (Recovery Factor). So how do you
determine the RR (Remaining Reserve)?
RR = Reserve – Np
RR = (OOIP x RF) – Np

7. The area in which and physical conditions under which sediments are deposited, including sediment source ; depositional
processes such as deposition by wind, water or ice; and location and climate, such as desert, swamp or river is definition of
depositional environment
8. Estimate Reynolds Number, if known
γg (Specific gravity gas) = 0.75
Qsc (Rate) = 4 MMscfd
μ= 0.012 cp
Diameter of Pipe = 2 in
C (constant Variable in Field Unit) = 20011
Answer : 2501375
BONUS QUESTION
The interfacial tension is measured at 50 dynes/cm. Further reservoir engineering analysis indicated that the reservoir
is better described at a porosity value of 16% and an absolute permeability of 120 md. Water saturation 0.6. Capillary
Pressure 0.75 psi
Answer : 0.052

9. A device fitted with a hinged collar and bow springs to keep the casing or liner in the center of the wellbore to
help ensure efficient placement of a cement sheath around the casing string is the fuction of Centralizer on
Cementing Job
10. What is the name of this BOP section? from bottom to top!
• Annular Preventer
• Blind Ram
• Drilling Spool
• Pipe Ram
• Tubing Head
BONUS QUESTION
What is the type of gas liberation shown in number 1 ? Differential liberation