You are on page 1of 33

PANTAI 2 STP

~ Green Transformation

Prepared by: Hanis bt Kamis P-RM0009/17


Nur Anisah bt Muhammad Othman P-RM0008/17
• According to Indah Water Konsortium Sdn Bhd
(IWK) chairman Tan Sri Abu Zahar Ujang (pic),
Malaysians produce 5.1 million cubic metres of
sewage everyday – easily filling up 2,000
Olympic-sized swimming pools.
• Under the Eleventh Malaysia Plan (11MP), the
government aims to provide 80% of the
population (especially in main cities) with
connected sewerage services by 2020.
OLD PANTAI 2 STP

• Originally a very large aerated lagoon sewage


• PANTAI 2 STP Located at No 1, Jalan Kg. Pasir 1, treatment plant on the ground
59200 Panai Dalam, KUALA LUMPUR W.P
• Cover a population of 550,000 only
• Manage by INDAH WATER KONSORTIUM SDN. BHD. • Only have 1 function , as sewerage treatment
• Total built up built up area as STP over 17 hectares.
OLD PANTAI 2 STP
OLD PANTAI 2 STP

Old aeration ponds in


Process

New Development Process


OLD PANTAI 2 STP

Old Aerial view before new


development

Open Aerated Lagoon System make


the smell is unbearable to the
residents in surrounding area.
Reason for
upgrading : Taman Bukit Angkasa

- unable to cater bigger upcoming


development area within catchment
coverage PPR Kerinchi

- unbearable bad odour to surrounding


residential area due to open treatment
system since 3 decades
-Upgrading into latest treatment Kg.Dato’ Tatah
Taman Desa Kerinchi
system that have better system of
Pantai 1 STP
treating and neutralising the sewage ,
green technology system integrated
into the treatment plant with extra
benefit to the public in term of land
usage.
execute a transformation from “waste Taman Pantai Indah
to wealth” – as coined by Prime
Minister Datuk Seri Najib Tun Razak –
and adapt an innovative culture that
propels the waste industry into
becoming self-funding.
NEW PANTAI 2 STP
Accommodate the needs of 1.423 million people in the
Launched by Prime Minister Datuk Seri Najib Tun surrounding area ( increments of 873,000 from old P2 STP)
Razak on May 25th, 2017
Estimated to cater development & density around until 2035

• Upgraded and converted into a state of the art It might be hard to believe now but , one of the best
mechanized underground regional sewage treatment spots to hang out for recreation, for special occasion like
plant (RSTP) with public amenities above. wedding reception , for sport activities might just be a
sewerage treatment plant
During Construction,
major earthworks were
carried out to create a
large, 16-metre deep
excavation which will
accommodate the new
underground sewage
treatment facility.
OLD PANTAI 2 STP
• before this construction phase can
begin, pond desludging work has to
be carried out.

• Geotube desludging technique has


been identified as the ideal method,
combining speed with reduced
odour emission. This is the first time
the innovative desludging method is
being used in Malaysia.

• Geotube’s 57m for Pantai 2 STP,


Pantai Dalam, Kuala Lumpur ( 6
unit)

How It Works?
Step 1 - Filling
Sludge is pumped into the Geotube container with
environmentally safe polymer that binds solid together
Step 2 - Dewatering
Clear effluent water is drained out from the Geotube
container, capturing over 99% solids
Clear filtrate can be collected and recirculated through the
system
Step 3 - Consolidation
Solids remaining in the container can be deposited at a
landfill or land-applied when appropriate
Advantages : Simple mechanism, Low cost, Available in variety
of sizes
Volume reduction as high as 90% with high solid levels,
BOD reduction up to 90%, Designed to fit in a roll-off box for
ease of transportation.
How It Works?
Step 1 - Filling
Geotube
Sludge is pumped into the Geotube container with environmentally safe polymer that binds
solid together
Step 2 - Dewatering
Clear effluent water is drained out from the Geotube container, capturing over 99% solids
Clear filtrate can be collected and recirculated through the system
Step 3 - Consolidation
Solids remaining in the container can be deposited at a landfill or land-applied when
appropriate

Advantages : Simple mechanism, Low cost, Available in variety of sizes


Volume reduction as high as 90% with high solid levels,
BOD reduction up to 90%, Designed to fit in a roll-off box for ease of transportation.
NEW PANTAI 2 STP

Pantai STP provides sewage


treatment services for Pantai
catchment areas covering 6,700
hectares.

The catchment areas include


Bandar Baru Sentul, Sentul
Raya, part of Kuala Lumpur city
commercial centers, Bangsar,
Bukit Kiara recreational area,
part of Old Klang Road, and
Petaling Jaya.
NEW PANTAI 2 STP

Upgraded and converted into a state of the art mechanized underground regional
sewage treatment plant (RSTP) with public amenities above.
One such technology – adapted from China –Considered the largest within
the Asia-Pacific region, that facility challenges all perceptions that sewage
treatment plants are unhygienic and smelly
PANTAI 2 STP CROSS SECTION
• The wastewater treatment system that being used in Pantai 2 STP is Advance Anaerobic-Anoxic-Oxic
(Advance AAO) process.
Also known as Advance A2O System.

• This process will eliminate phosphorus and nitrogen from the wastewater, before the treated wastewater
or known as effluent were discharge to Klang River.

• This elimination of phosphorus and nitrogen will prevent from water weed to grow rapdly which may
cuase problems to other aquatic life.

Advance Anaerobic-Anoxic-Oxic (Advance A2O)

Treated
UV
Effluent
Disinfection
(Standard A)

Waste Activated Sludge (WAS)

Biogas
Dispose Site
Fertilizer
Advance Anaerobic-Anoxic-Oxic (Advance A2O)

UV Disinfektan
Biogas Holder
4 nos. of Anaerobic Digester
hold biogas production of 9,600 m3/day
Open to public on 14 Oktober
2017 from 8 am to 8pm
• Geotube’s 57m
for Pantai 2
STP, Pantai
Dalam, Kuala
Lumpur :
• Geotube 6 unit
STP 2 current issue:
• The Auditor -General’s Report released this
week
REFERENCES:
• http://loyalgroup.com.my/

You might also like