About Maha Metro
The approval for the Pune Metro Rail Project was granted by the Union
Cabinet and duly notified by MoUD, Govt. of India vide letter No. K-
14011/11/2015/MRTS-IV dated 07/12/2016 and also by Govt. of Maharashtra
vide GR No. PMR 3316/CR-132/UD-7 dated 23/12/2016.
Total 30 31.25
List of stations
North- South Corridors East-West
Corridors
S. No. Station Name Remarks S. No. Station Name Remarks
1 PCMC Elevated
Vanaaz (Depot) Elevated
1
2 Tukaram Nagar Elevated
2 Aanad Nagar Elevated
3 Bhosari (Nasik Phata) Elevated 3 Ideal Colony Elevated
4 Kaserwadi Elevated 4 Nal Stop Elevated
5 Fugewadi Elevated 5 Garware Elevated
6 Dapodi Elevated 6 Deccan Gymkhana Elevated
7 Bopodi Elevated 7 Sambhaji Park Elevated
8 Khadki Elevated 8 PMC Elevated
9 Rangehills (Depot) Elevated Civil Court (Interchange
9 Elevated
Station)
10 Shivaji Nagar Underground
10 Mangalwar Peth Elevated
Civil Court (Interchange 11 Pune Railway Station Elevated
11 Station)
Underground
12 Ruby Hall Elevated
12 Budhwar Peth Underground 13 Bund Garden Elevated
14 Yerwada Elevated
13 Mandai Underground
15 Kalyani Nagar Elevated
14 Swargate Underground 16 Ramwadi Elevated 7
Project Sanction Details
Total Project Completion Cost Rs. 11,420 Crs
Approval of Govt. of India (GoI) 7th Dec, 2016
Approval of Govt. of Maharashtra (GoM) 8th Dec, 2016
COST BREAKUP:
TOTAL ESTIMATED COMPLETION COST (with central taxes):
Corridor I Rs.7,071 Crores
Corridor II Rs.3,629 Crores
Total Rs.10,700 Crores*
*Excluding State Tax & Interest During Construction
(IDC)
FINANCIAL INDICES:
i. FIRR: (Cost with central taxes) 13.60%
The proposed viaduct structure for Pune Metro is Pre-cast segmental box girder, carrying two
tracks supported on single pier located on the median of the road.
Road clearance of 5.5 m is ensured below the viaduct structure.
The foundation shall be mainly Open foundation while pile foundation would be done at certain
locations.
The superstructure shall be pre-cast segmental construction which will cause minimal
inconvenience to vehicular moment during the execution stage.
Underground section
6 SD for Land including R&R cost and State Taxes from ULB. 1210.8*
TOTAL 11281.0
Interest During Construction (IDC), to be borne by GOM/Urban Local
7 139.0
Bodies (ULB)
GRAND TOTAL 11420.0
*932 crores is land cost, 581 crores is State taxes
PROGRESS OF WORK SINCE INCEPTION
4. Setting up Office • One office measuring 500 sqm. has been taken on lease from PCMC.
• Second office 200 sqm. has also been taken on lease from Ghole Road Museum.
5. Utility Mapping • The Mapping of existing utilities (Electricity, Water pipe, Cable, Telecom etc.) has started in Consultation with
State Govt. officials.
PROJECT STATUS - Land
Sr. No Purpose of Land Location Status
1 For Interchange Station and Multi Shivaji Nagar- Food Grain Godown Proposal submitted to GOM on 12-6-2017 for advance
Modal-Integration possession
2 For Depot *Shivaji Nagar- Agriculture College Proposal submitted to GOM on 12-6-2017 for advance
(Corridor no.1) possession
*Vanaz Depot (Corridor no. 2) Request letter sent to PMC Commissioner for
advance possession
3 Land for Running Sections Khirkee- Range Hills Proposal ready for submission to Defence
Authorities
4 Land for Property Development *Balewadi Proposal submitted to GOM on 19-6-2017 for advance
possession
5 Land for Afforestation Panchgav Parvati Permission Letter for plantation received
7 Station and Multimodal integration Swargate Request letters sent to Municipal Commissioner
PMC
Advanced possession requested.
8 Station and Multimodal integration Shivaji Nagar Bus Depot Request letter sent to MD-MSRTC
State Government has already conveyed its consent for handing over ~88% of total Government Land
Project work Photos
Rock Samples
obtained from
Geotechnical
survey
Geotechnical Survey
across the Alignment
Project work Photos-Barricading at Nasik Phata
Project work Photos-Barricading at Nasik Phata
Project work Photos-excavation at Nasik Phata
Project Work -First Pillar of Metro
Project work Photos-Site Visit & Inspection
Near St. Tukaram Metro Station
Project work Photos-Site Visit & Inspection
Mula Mutha river bed alignment
Project work Photos-Site Visit & Inspection
civil court interchange station
Project work Photos-World Environment Day
Akurdi Tree Plantation : Metro Eco-Park
Project work Photos-Plantation Drive
Pachgaon Parvati Tree Plantation : Metro Van Vihar (Bio-Diversity Park)
Unique features of Pune
Metro Rail Project
First and Last Mile Connectivity
A service which helps transfer passengers to the nearest Transit point which facilitates them for an onward journey is called a Feeder System
Green building
techniques, bio-
digester
technology
Rain water
Reduction in harvesting, water
carbon recycling plant at
footprints. station & depots
Illustrative Station design -
Pune Metro Rail Project
World Class Metro Station Development
Best architectural firms from across the globe shall be selected through global
competitive bidding.
The stations will have distinctive architecture reflecting Pune’s rich history and cultural
heritage of Maratha Rulers, Forts, Writers & Poets.
The stations will be carefully designed to take care of universal access and needs of not
just the differently abled but also pregnant women and elderly.
Open spaces around the stations will be beautifully landscaped keeping in view the
traditional green ethos of the city.
Illustrative metro station
River Side Development
River Side Development
River Side Development
CIVIL COURT INTERCHANGE STATION (GODOWN)
(Illustration showing Passenger amenities)
SOCIAL STATIONS & WEBSITE
WEBFALLS AT SOCIAL STATIONS
Where are we now,
1,30,208 2,689
500 4,110
Friends of Metro Views
METRO SAMVAAD – AN INFO SERIES
GLIMPSE OF FIRST METRO SAMVAAD
THANK YOU