You are on page 1of 5

OVERVIEW PROSES FLOW DIAGRAM CPP DONGGI

Produced BSRU
Water System

Booster
Separation
Wellhead
System
Compressor AGRU
System

Condensate
System

Sales Gas To DSLNG

DPCU DHU

Fuel Gas System


Gas & Condensate Production Facility Block Diagram

INCINERATOR/TOX
TO ATM

BOOSTER SULFUR RECOVERY UNIT


COMPRESSOR BIOSULFUR CAKE

WASH TOWER BLEED TO IINJECTION


ACID GAS TREATMENT WELL
REMOVAL UNIT (PAQUES)
HP Gas LP Gas
DEW POINT
DEHYDRATION TO
LP Fuel Gas CONTROL
WELLS SEPARATION UNIT UNIT SALES GAS
*)
PIPELINE
30 INCH
Water Condensate HP Fuel Gas

FUEL GAS

CONDENSATE CONDENSATE 750-TK-1001


STABILIZATION SALES TO CPP
SENORO

PRODUCE WATER TO IINJECTION


TREATMENT WELL

2
OVERVIEW PRODUKSI & PENYALURAN GAS DARI CPP DONGGI & CPP MATINDOK

Donggi 9 Well Sumur Donggi


Prod. : 8 sumur (DNG-1/2/3/5/6/7/8/9)
Water Injc : 1 sumur DNG-4 Sumur Matindok
Prod. 7 sumur (MTD-2/3/4/5/6/7/8)
CPP
CPP DONGGI
DONGGI Water Injc : 1 sumur MLR-2ST

PLN

Minahaki Future
CPP
CPP MATINDOK
MATINDOK

PIPA 16” 37 KM
Well

PAU

300 m
Senoro
MATINDOK
ALLOCATION
DONGGI METERING
ALLOCATION
METERING USO SALES DSLNG
METERING

CPP
CPP SENORO
SENORO SENORO
17 KM
ALLOCATION
JOB P-MTS
METERING PIPA 30” 6.8 KM
TIP 1 TIP 2

Cendanapura

3
OVERVIEW PRODUKSI & PENYALURAN KONDENSAT DARI CPP DONGGI & CPP MATINDOK
Condensate Facilities
Condensate From
Matindok
CONDENSATE
SENORO CONDENSATE
TANK
STABILIZATION SENORO
AT MATINDOK CPP
3 x 1956 m3 SYSTEM CONDENSATE
( 3 x 12300 BBLS)

380-TK-1001
A/B/C

Condensate From Matindok


Donggi Condensate

Melaui CPP MATINDOK

PEP CONDENSATE TO
RECEIVING TANK LOADING
AT SENORO TANKER
1 x 682 m3
FI
(1 x 4300 BBLS)
METERING

750-TK-1001

PEP Condensate
Transfer Pump
2 x 8 m3/h
(2 x 1200 BPD)

8”

CPP SENORO
CONDENSATE STORAGE TANK C/D BAJO JETTY
CAP. 2 X 50,000 BBLS CONDENSATE STORAGE TANK E/F
CAP. 2 X 110,000 BBLS

4
OVERVIEW WELL CPP DONGGI

Cluster-4 (Injection Well DNG 4)

Cluster-2 (DNG 2, 8 & 9 )

CPP
DONGGI

Cluster-1 (DNG 1, 6 & 7)

Cluster-5 (DNG 5)

Cluster-3 (DNG 3)