Security Level: Internal

Single Site Verification

Alex

www.huawei.com

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential


Agenda
• Introduction
• SSV Audit
• SSV DT Test
• SSV Report
• SSV Trouble shooting
Introduction
 Single Site On-Air Mode

Cluster Accept
Project Nomin Detail Project
SSV Optimi ance
Start al Plan Plan End
zation Report

 Cluster On-Air Mode

70% 90%
Accept
Project Nomin Detail Cluster Cluster Project
ance
Start al Plan Plan Optimi Optimi End
Report
zation zation

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 3


Work flow
Start

SSV is to solve
Tuning
SITE Audit
Implementation
• Basic Functions
Y • Coverage
SSV DT Approved
• Rx Quality
N
• Interference
SSV Report and Analysis Tuning Proposal
• Abnormal Events

Y
Problem Found SSV Problem Record

SSV Report

End

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 4


SSV Tools

• M2000
• LMT&MML
• Probe & Assistant
• TEMS & MapInfo
• NASTAR
• U-Net

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 5


Agenda
• Introduction
• SSV Audit
• SSV DT Test
• SSV Report
• SSV Trouble shooting
SSV Audit
• From BSS Part
 Single Site Test Record from BSS engineer
 Site Activated
 All Cell/TRX/Channels Un-locked
 Idle Timeslot Test is closed
 No Alarm may influence SSV Test

• From Data Configuration


 Engineer Parameter Audit
 Neighbor Setting Audit
 Optimization Parameter Audit

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 7


Agenda
• Introduction
• SSV Audit
• SSV DT Test
• SSV Report
• SSV Trouble shooting
SSV DT Overview
• Establish DT Methodology
 Tool Setup: Tool, Digital Map, FTP Server, APN, SIM
 Test Method: Idle, Long Call, Short Call, PS
 Special requirement: Locking BCCH or not.
 DT Route Planning
 SSV Report Template

• Carry out SSV DT


 Before DT Test
 During DT Test
 After DT Test

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 9


SSV DT Methodology(0)
• Special Requirement
 Indoor Test or Outdoor Test
 Locking BCCH or not
 Forbid HO or not
 …

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 10


SSV DT Methodology(1)
• Test Method
 Idle
 RxLev Full on BCCH, Cell
Reselection, Cell Identity
 Long Call
 RxLev, RxQual, TA on dedicated
mode
 Retainability(Call drop, Handover)
 Short Call
 RxLev, RxQual, TA on dedicated
mode
 Accessibility(CSSR, Call Drop,
Handover)
 PS
 GPRS/EDGE function
 Throughput of APP Layer

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 11


SSV DT Methodology(2)
• SSV DT Route
 Principles for Test route for SSV be defined together with
customer
 The test routes should cover all sectors of each sites, main road
and important areas
A1

A
C1
B1 A2

C2
A3 B2

C
B
C3
B3

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 12


SSV DT Methodology(3)
• A proposed DT Route Definition Principle

Suburban/Highway Site Urban Site:

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 13


SSV DT Methodology(4)
• PS Test
 The setting of Mobile: APN
 SIM card information
 Selecting Test Item according to Customer Requirement
 Attach/Detach
 PDP
 WAP/ HTTP
 FTP
 MMS
 FTP Server
 Download/ Upload file size
 CQT: DL ≥ 500 KB / UL: 100KB
 DT: DL 100KB / UL: 20KB

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 14


Carry out SSV DT
• Before DT Test
 Driver test system connection
 Positions of the Test MS and Antenna
 Import: digital map, engineering table and test route
 GPS plot.
 Communicate with driver: driving route and speed.
 The log-files should not be too long, preferably less than 20 minute.
 The log-files should be named properly.
• During DT test
 Monitor the DT real results: Call setup, HO, Call drop, RxLev, RxQual, C/I
 Analyze as much as possible. Ask driver to stop when abnormal
 Pay attention to: bad quality, possible interfering sites, and topography and
site locations
 Correct small problems discovered immediately
• After DT Test
 DT log files and DT problem records.

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 15


Agenda
• Introduction
• SSV Audit
• SSV DT Test
• SSV Report
• SSV Trouble shooting
SSV Report
• SSV report template

 What is the usage for CI plot?


 What is the usage for BCCH plot?
 What is the usage for RxLev plot?
 What is the uasge for RxQual plot?

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 17


Agenda
• Introduction
• SSV Audit
• SSV DT Test
• SSV Report
• SSV Trouble shooting
SSV Trouble Shooting

• Basic Verification
• RxLev Verification
• RxQual Verification
• Event: CSSR, Handover, Call Drop
• GRPS/EDGE

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 19


Basic Verification

• To check basic parameters: LAC,CI,BCCH, BSIC, MA, MAIO


• To check downlink coverage

Reverse
connection of the
BCCH Tx

Normal cell

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 20


RxLev Verification

• Check whether the receive level of the BCCH and TCH are
greater than the predefined threshold and are stable.

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 21


RxQual Verification

RxQuality 0 1 2 3 4 5 6 7
Non-FH Good Good Good Good Fair Fair Poor Poor
FH Good Good Good Good Good Fair Poor Poor

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 22


Event-Access Failure

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 23


Event-Call Drop

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 24


Event- Handover

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 25


Thank you