CADP Workshop 2: CAP Analysis 1
CAP Analysis Template
Proposed Inputs/ Agencies Responsible
Current/ Existing Issues and
Component Activities/
Status Constraints

Others
DENR
Interventions

LGUs
DILG
DAR
DA
Physical FMR Difficulty in Rehabilitation/ X X X X-
Characteristic Poor condition the transport Concreting of DS
s and of farm to of the major FMR W
market roads commodities D
Infrastructure
Calinog –
(ex. FMR, irrigation, 1. Guiso-
post-harvest facility Canabajan-
, etc.)
Malag-it
2. Lampaya
(Sitio Banay-
Banay)
3. Cabagiao –
Malapawe-San
Nicolas
4. San Nicolas,
Ulayan

CADP Workshop 2: CAP Analysis 2


CAP Analysis Template
Agencies Responsible
Proposed Inputs/
Current/ Existing Issues and
Component Activities/
Status Constraints
Interventions

Others
DENR

LGUs
DILG
DAR
DA
Physical FMR Difficulty in the Rehabilitation/C X X X X-
Characteristics Poor condition of transport of the oncreting of FMR DS
and farm to market major WD
roads Calinog – commodities
Infrastructure
5. Libot-
(ex. FMR, irrigation, Impalidan-Owak
post-harvest facility , 6. Brgy. Cabugao
etc.) – Impalidan
7. Baje San Julian
– Balaticon-
Nalbugan-
Malitbog Centro
8. Maspasan
9. Datagan-
Agcalaga-
Garangan-
Masaroy

CADP Workshop 2: CAP Analysis 3


CAP Analysis Template
Agencies Responsible
Proposed Inputs/
Current/ Existing Issues and
Component Activities/
Status Constraints
Interventions

Others
DENR

LGUs
DILG
DAR
DA
Physical FMR Difficulty in the Rehabilitation/C X X X X–
Characteristics Poor condition of transport of the oncreting of FMR DS
and farm to market major WD
roads Calinog – commodities ,NI
Infrastructure
10. Tibiao A
(ex. FMR, irrigation, 11. Badlan -
post-harvest facility , Datagan
etc.) 12. Carvasana-
Toyungan
13. Dalid-Jamin-
ay
14.Malaguinabot-
Tahing

CADP Workshop 2: CAP Analysis 4


CAP Analysis Template
Agencies Responsible
Proposed Inputs/
Current/ Existing Issues and
Component Activities/
Status Constraints

Others
DENR

LGUs
DILG
DAR
Interventions

DA
Physical Irrigation Low Construction/ X X X–
Characteristic Absence of productivity Establishment NI
s and Irrigation Facility of Irrigation A
– Facilities
Infrastructure
1. Various
(ex. FMR, irrigation, Barangays
post-harvest facility (Alibunan –
, etc.)
Cabugao,
Barrio Calinog-
Canbajan,
Dalid – Jamin-
ay, Toyungan-
Carvasana)

CADP Workshop 2: CAP Analysis 5


CAP Analysis Template
Agencies Responsible
Proposed Inputs/
Current/ Existing Issues and
Component Activities/
Status Constraints

Others
DENR
Interventions

LGUs
DILG
DAR
DA
Physical Post Harvest Low Purchase/Acq X X Fa
Characteristics Facilities Productivity uisition of s
and 1. Various Agricultural
Barangays Machineries
Infrastructure
(ex. FMR, irrigation, Slaughterhous
post-harvest facility , e
etc.)
1. Non- Lack of Purchase of X X
Operational Equipment Equipment N
2. Unfinished Design did Rehabilitation/ MI
Building not met the Improvement/ S
standard of Redesigning
NMIS the Slaughter-
house

CADP Workshop 2: CAP Analysis 6


CAP Analysis Template
Agencies Responsible
Proposed Inputs/
Current/ Existing Issues and
Component Activities/
Status Constraints

Others
DENR
Interventions

LGUs
DILG
DAR
DA
Physical Unfinished DAR Difficulty in Completion/ X X DP
Characteristics ADB ARCP- the Construction of W
and Bridge transportation Bridge H
of major
Infrastructure
Toyungan commodities
(ex. FMR, irrigation,
post-harvest facility ,
etc.)

CADP Workshop 2: CAP Analysis 7


CAP Analysis Template
Agencies
Proposed Inputs/ Responsible
Current/ Issues and
Component Activities/

Others
Existing Status Constraints

DENR

LGUs
DILG
DAR
Interventions

DA
Environment Ecotourism Illegal Cutting of Institutionalization X X
protection & Areas Trees of MENRO Office
(Caratagan,
ecosystem Presence of Reforestation
Hilwan, Aglonok,
management Kaingin Activities Program/Projects X X
Cahigon,
Activities Guinbonyugan, Poor condition Rehabilitation/Impr
(ex. ecotourism, soil Binolusan, of access roads ovement of Access
and water Marandig, Roads
conservation Absence of
Supanga,
measures, NGP, Trails, Pathways Establishment of
Manaripay,
agri-tourism, fish leading to eco- trails, Pathways
sanctuaries,
Tigbayog) X X D
tourism areas
declared PAs, OT
tenurial
instruments, etc.)

CADP Workshop 2: CAP Analysis 8


CAP Analysis Template
Agencies
Proposed Inputs/ Responsible
Current/ Issues and
Component Activities/

Others
Existing Status Constraints

DENR

LGUs
DILG
DAR
Interventions

DA
Environment Collective CLOA Survey Issues Filling of Petition for X
protection & qualified FBs in
(Inclusion of FBs
regional Office
ecosystem not in CLOA but
management have actual
Activities area of tillage)

(ex. ecotourism, soil


and water
conservation
measures, NGP,
agri-tourism, fish
sanctuaries,
declared PAs,
tenurial
instruments, etc.)

CADP Workshop 2: CAP Analysis 9


CAP Analysis Template
Agencies
Proposed
Current/ Issues and Inputs/ Responsible
Component
Existing Status Constraints Activities/

Others
DENR

LGUs
DILG
DAR
DA
Interventions

Investment Rice - existing Low Provision of X X


requirements VCA productivity tractors, harvesters
and planters
based on
value-chain
and market
study

-market
information
system,
processing and
value adding
facilities/
technologies

CADP Workshop 2: CAP Analysis 10


CAP Analysis Template
Agencies
Proposed
Current/ Issues and Inputs/ Responsible
Component
Existing Status Constraints Activities/

Others
DENR

LGUs
DILG
DAR
DA
Interventions

Investment Existing Non Rehabilitation/Re- NM X


requirements slaughter house Compliance to designing of IS
standards Slaughterhouse
based on
value-chain No Equipment Purchase of
and market Equipment
study

-market
information
system,
processing and
value adding
facilities/
technologies

CADP Workshop 2: CAP Analysis 11


CAP Analysis Template
Proposed Agencies
Current/ Issues and Inputs/ Responsible
Component

Others
Existing Status Constraints Activities/

DENR

LGUs
DILG
DAR
DA
Interventions

Socio- Potable water No water Installation of X X LW


economic distribution water UA
pipeline in distribution
Ex. all basic N
distant pipeline
socio- W
economic
barangays
RB
services Absence of
Electricity Expansion/Const X D
electric Power
ruction of Power OE
supply in
lines ,
Mountain
ILE
Barangays Establishment of
C
Solar Power
O

CADP Workshop 2: CAP Analysis 12


CAP Analysis Template
Proposed Agencies Responsible
Current/
Issues and Inputs/
Component Existing

Others
Constraints Activities/

DENR

LGUs
DILG
DAR
Status

DA
Interventions
Institutional Product Lack of Organization of X FAs
Development processing organized farmers
facilities farmers association to
- Rural based association to manage the
organizations manage the processing
rice processing facilities
- LGU facilities
Capacitate the
- Local Inability of FAs to manage
alliances existing FAs to and market the
ATI
manage and processing
market the rice facilities
processing
Facilitate the
facilities
availment of
AC
Lack of capital PLEA
PC
for FAs
CADP Workshop 2: CAP Analysis 13