Professional Documents
Culture Documents
Object
• In case of Transient failures to bring back the isolated
subsystem to service, normally Loco Pilots switch OFF/ON
Control Electronics through BL key. With this procedure
there is loss of punctuality due to discharge/recharge of BP
pressure in the whole train/rake formation.
• To avoid such cases, provision of “MCE Reset/VCU Reset”
Push button switch (161) to de-energise 218 (Contactor for
Control electronics) has been done in SB1 panel./D panel
of both cabs .
Reset switches provision
LGD Locos Reset switch available RPM locos Reset switch provided in
in SB1 panel D panel of Both cabs
Instructions for Resetting VCU through VCU Reset Switch
• VCU Reset Switch can be used only for transient fault. If the fault is
permanent, then first isolate the subsystem through MCB or Cut-Out
Switch and then VCU Reset Switch operation should be done.
Provision of ECPSW (Emergency Compressor
Switch)
Provision of ECPSW (Emergency Compressor
Switch)
• Whenever HBB2 Processor fails, compressors do
not work in “Äuto mode”.
• In this case, LP has to operate BLCP to MAN
position (spring loaded) every time.
• To avoid this, a rotating switch ECPSW
(Emergency Compressor Switch) is provided in
SB1 panel.
Thanks