Rotary Table Elevation = 482’ Ground Elevation = 462’

4 1/2” SINGLE X-MAS TREE RTE to tubing spool = 20’

21' Btm. Tubing Hanger 11" 3M x 4-1/2" EUE [Rerun]


52’ Btm Landing Joint 4 1/2" EUE [Rerun]
54’ X-over 2 7/8" EUE Pin x 4 1/2" EUE Box [New]
WELL HEAD AND X-MAS
TREE ASSEMBLY
71’ 20”, 94 #ft. K-55 BTX
WELL HEAD & X-MAS
TREE
13- 3/8" X 9- 5/8" X 4-1/2"

A- 13 -3/8" X 13-5/8" CSG


HEAD
B- 13- 5/8" X 11" 3M
TUBING HEAD FIP
C- 11" 3M X 4-1/16" 3M X- 805’ 13-3/8”, 61 PPF K55 BTC R3 [ 20Jts.]
MAS TREE FIP
FLOWLINE : 4" SCHEDULE
4

Hanger 11*3M x 4 1/2” EUE

61 KIPS
WEIGHT STRING: UP/DOWN
WEIGHT ESP
ASSEMBLY 10 KIPS
WEIGHT BLOCK 7 KIPS 5600’ Top of Cement

Guards cables 12
Bands on Guardacables 35
Adittionals Bands 3
Total Bands 38
7120’ Btm [228 Jts] Tubing Joints 2-7/8" EUE Pin x Box [Inspected]
Mid Joint 2-7/8” Round 228
7120’ Btm Discharge Serie 400 FH 2 7/8" EUE, Corrosion Resistant [New]
Overcoupling 2-7/8” Round 227 7120’ Top ESP Upper Pump 43 STG WD 1000 MF AR1:1 CMP UHSS [New]
Mid Joint 2-7/8” Round 2 7128’ Top ESP Middle Pump 105 STG WD 1000 MF AR1:1 CMP UHSS [New]
Protectors Tipo Patín 5 7146’ Top ESP Lower Pump 105 STG WD 1000 MF AR1:1 CMP UHSS [New]
7163’ Top ESP Intake 400 UHSS 70 TYPE [New]
7164’ Top ESP Upper Seal PS-LsBpB-HL, AFLAS ELASTOMER, UHSS [New]
7173’ Top ESP Lower Seal S-BpBsL-HL, AFLAS ELASTOMER, UHSS [New]
7181’ Top ESP Motor 120 HP / 1295 VOL / 59 AMP [New]

7213’ Btm Centralizer [New]

[September 12th, 2018]


4 ½ “ TCP Connex 3323 ConneX EC2-
33A2322-RC to 12 SPF
Carbonera

7312’ - 7332’ C5c

7406’ Top of cement [September 09, 2018]


7409’ Top of Bridge plug [September 09, 2018]
Carbonera
Lower

7420’ - 7425’ M1A1


7425’ - 7438’ M1A1

NOTE: 1 Band Left in hole (October 05, 2004)


TOTAL NET: 13’
GUN:
SPF:
4-1/2 TCP
12 [34B HJIIRDX]
CHARGE: 156
~ 7610’ Top of Sand Fill, Finder 8 ¼” (September 7, 2009) Colregistros
7614’ Top of Sand Fill (September 29, 2004) By Colregistros
7729’ Top of Cement [PBTD] CBL-CCL [ November 14, 1998 ]
7742’ Float Collar

7833’ 9 5/8”, N-80, 47 #/ft. R3 BTC [171 Jts.]


7835’ Total measured depth [12 ¼ ” ]

TENTH INSTALLATION
DATE OF INITIAL COMPLETION: PREPARED & DRAW: APPROVED:
Occidental MECHANICAL CONDITION SHEET NOVEMBER 16, 1998 ELVIA ROSA DIAZ O. LA YUCA 83
de Colombia, Inc. Last Update: September 25th, 2018 DATE OF LAST JOB: REVISED:
September 15th, 2018