December 31, 2018 | Slide 1 4CAE000159
Relion® 670 series version 2.0
We are leading the digital substation evolution

Highlights from 670 series version 2.0

Support of IEC 61850 Ed. 1 and Ed.2 in the


same product without firmware change
Cyber security support for compliance to
NERC CIP and IEC 62351-8
Higher transfer capacity in the power network
due to faster distance protection
Improved HMI with virtual keyboard, function
push buttons and three color LED indications
with alarm descriptions

© ABB
December 31, 2018 | Slide 2 4CAE000159
Relion® 670 series version 2.0
We are leading the digital substation evolution

Major features in 670 series version 2.0

 IEC 61850, Edition 2


 IEC60870-5-103 protocol
 Cyber security
 Improved HMI
 Improved mechanical design
 Improved fault locator
 Breaker monitoring
 Global base values
 Forcing
 Higher capability for 9-2LE applications

© ABB
December 31, 2018 | Slide 3 4CAE000159
Relion® 670 series version 2.0
We are leading the digital substation evolution

Protection functions

 Fast distance protection


 Frequency accumulative protection
 Fuse supervision, VDSPVC
 Rotor overload protection (49R)
 Stator overload protection (49S)
 Binary signal integrator, TIGAPC
 Gas medium supervision, SIMG
 Liquid medium supervision, SIML
 Limit counter function, TEIGAPC
 Multi-purpose filter, SMAIHPAC
 Underimpedance monitoring, ZGVPDIS
 Pole slip

© ABB
December 31, 2018 | Slide 4 4CAE000159
Presenter, date

What’s new?
Relion® 670 series version 2.1, IEC & ANSI
Improved line distance protection with enhanced
security & flexibility
© ABB
December 31, 2018 | Slide 5 4CAE000159
Relion® 670 series version 2.1
Built on the strong foundation laid by version 2.0

Features Product portfolio

Improvement of the fast line distance protection The released product portfolio includes
 Complemented by combined, easily settable  Seven products based on application:
characteristics of Quad/Mho
‒ REB, REC, RED, REG, REL, RES and RET
 Supporting remote parameterization enabling
 50 different product variants
adaptive line distance protection applications
‒ 37 configured
Enhanced security and integration by supporting
Central Account Management (CAM) in the IED which ‒ 13 customized
is harmonized across the SA system portfolio Hardware
Enhanced flexibility and thereby acceptance where  Same hardware as 670 version 2.0 + a new TRM
the user’s IEC 61850 communication models are variant 10I+2U as an option
abstractly mapped to the IED internal models Tools
Support PCM600 version 2.7 features like Central  PCM600 2.7 will be required
Account Management, Flexible Product Naming,
Forcing, 64bit native  Connectivity package 3.1 will be required

Improved line distance protection with enhanced security & flexibility

© ABB
December 31, 2018 | Slide 6 4CAE000159
Relion® 670 series version 2.1
What’s new?

Applications

High-speed distance Compare integer,


protection, INTCOMP
ZMFPDIS and ZMFCPDIS

Compare real, Running hour meter,


REALCOMP TEILGAPC

© ABB
December 31, 2018 | Slide 7 4CAE000159
Relion® 670 series version 2.1
What’s new?

Applications

High-speed distance protection, ZMFPDIS and ZMFCPDIS Running hour meter, TEILGAPC
 Combined Quad/Mho/Offset Mho characteristics  Accumulate the total running or
energized time of generator,
 Settable Quad/Mho operating characteristic per zone/fault loop type
PE/PP transformer, reactor and
provide this value locally on
 Tested according to IEC 60255-121, typical operate time for Mho now HMI or remotely via
15ms (prev. 25ms) communication
 Easier to set enables faster deployment. Graphical view in GPST in Compare integer, INTCOMP
PCM600
 Compares two integer
 Lower CT requirements variables, e.g., can be used to
 Continuous impedance measurement, ZMMXU check Tap-Changer position
‒ To HMI and remotely via communication Compare real, REALCOMP
 Some settings mapped to IEC 61850  Compares two real variables,
e.g., can be used to compare
current or voltage level

© ABB
December 31, 2018 | Slide 8 4CAE000159
Relion® 670 series version 2.1
What’s new?

System functions

Cyber security Flexible product naming Protection settings

Central Account Management Via IEC 61850 Via IEC 61850

Remote command Ready-made dataset Communication supported

To adjust VCTR/USet parameter For VCTR GOOSE Standard

© ABB
December 31, 2018 | Slide 9 4CAE000159
Relion® 670 series version 2.1
What’s new?

Cyber security

SDM600
CAM (Central Account Management) based
on IEC 62351-8 RBAC
 Centralized administration of users,
PCM600 SDM600 CAM
manage users for all IEDs centrally from package (.zip)

a single server using SDM600


 User credentials and roles are
created/stored in an online authentication
service server
‒ Authentication is done at the server
‒ Authorization check is done at the IED
‒ New PCM Tool component “Account
Management” is included in PCM600 2.7
 670 series version 2.1 fully supports
centralized user account management
and security logging

© ABB
December 31, 2018 | Slide 10 4CAE000159
Relion® 670 series version 2.1
What’s new?

Cyber security

SDM600
Certificate management
 In 670 version 2.0, self-signed certificates
were used to encrypt and secure
PCM600 SDM600 CAM
communication package (.zip)

 In 670 version 2.1 allows customers to


deploy certificates issued by a Certificate
Authority (CA)
 PCM600 is used to deploy/remove signed
certificates

© ABB
December 31, 2018 | Slide 11 4CAE000159
Relion® 670 series version 2.1
What’s new?

Flexible Product Naming (FPN)

 Enable the IEC 61850 client to see names of


logical nodes, parameters, attributes etc., as per its
own definition
 In principle one look-up table between IEC
61850 naming definitions end client naming
definitions
 FPN is a way to map the IED’s IEC 61850 data
model to a customer defined IEC 61850 data model
 FPN allows customer to use standardized,
predefined and IED-vendor independent templates
for building and maintaining substations
 FPN offers significant flexibility and efficiency in
substation engineering
 FPN is supported for both IEC 61850 Edition 1 and
Edition 2

© ABB
December 31, 2018 | Slide 12 4CAE000159
Relion® 670 series version 2.1
What’s new?

Protection settings via IEC 61850

 Facility to change certain settings remotely


using IEC 61850
 Dedicated enable/disable setting and
indication in ACT PDIS.Ang

 Functionality supported when in IEC


61850 Edition 2
 High-speed distance protection
PDIS.RisLod
 Change zone X&R reaches and load-
encroachment blinder area settings remotely
 Over-current protection
‒ Change current pickup remotely
‒ OC4PTOC, EF4PTOC, PHPIOC, EFPIOC

© ABB
December 31, 2018 | Slide 13 4CAE000159
Relion® 670 series version 2.1
What’s new?

Remote command to adjust


VCTR/USet parameter
 Possibility to change the transformer
voltage control regulation set-points using
IEC 61850
 Set freely VCTR target voltage from the
IEC 61850 client
 Dedicated enable/disable setting within
VCTR function itself to enable this feature
 Functionality supported when in IEC
61850 Edition 1 or Edition 2
 USet parameter not effected within IED
 A separate parameter used to store the IEC
61850 command value
 Faceplate for MicroSCADA prepared

© ABB
December 31, 2018 | Slide 14 4CAE000159
Relion® 670 series version 2.1
What’s new?

Ready-made dataset for VCTR GOOSE

 Ready-made dataset makes it easy for customers to manage horizontal GOOSE communication
required for parallel control of power transformers
 With a few clicks 10 binary and 6 analog signals are connected, including data value, time and
quality attributes
 Simplified engineering for parallel control of transformers

© ABB
December 31, 2018 | Slide 15 4CAE000159
Relion® 670 series version 2.1
What’s new?

Communication

IEC 60870-5-103 protocol


 Compliance and thereby interoperability
with VDEW standard for 103 commands
 Parametrized selective handling of events
‒ Events time-tagged with either relative or
absolute timestamp
‒ Events to be included as part of general
interrogation or not

© ABB
December 31, 2018 | Slide 16 4CAE000159
Relion® 670 series version 2.1
What’s new?

670 series general improvements

1. Increased number of disturbance recording channels


2. Forcing of binary inputs
3. Improved on-screen keyboard
4. Additional IEC 61850 attributes on certain logical nodes
5. Harmonized pre-configurations
6. PCM600 related

© ABB
December 31, 2018 | Slide 17 4CAE000159
Relion® 670 series version 2.1
What’s new?

Increased number of binary of disturbance


recording channels
REB
 Increased number of disturbance
recording channels from 96 to 352 in
order to capture all important information
for 24 bays
REC
 352 disturbance recording channels
available since 670 2.0
RED, REG, REL, RES and RET
 Increased disturbance recording
channels from 96 to 128

© ABB
December 31, 2018 | Slide 18 4CAE000159
Relion® 670 series version 2.1
What’s new?

Forcing of binary inputs

Time saving during testing and commissioning


 Support for forcing of BIM, BOM, IOM and SOM
 Can be performed from PCM600 and/or local HMI
 Forcing is possible only when the IED is in
testmode. Leaving testmode will go back to
unforced (live from process) values

© ABB
December 31, 2018 | Slide 19 4CAE000159
Relion® 670 series version 2.1
What’s new?

Improved on-screen keyboard

 A three-row pad where all the visual ASCII


characters are selectable
 The actual location is marked with a cursor
 Purpose: to facilitate the input of strings,
especially good for using better (e.g.
longer) passwords.

© ABB
December 31, 2018 | Slide 20 4CAE000159
Relion® 670 series version 2.1
What’s new?

Additional attributes available on IEC 61850

 Fault Locator LMBRFLO


 The fault impedance magnitude and
angle is now available on IEC 61850
 Enables fault location programs to
use the fault impedance magnitude
and angle for calculations
 Apparatus control SCSWI, SXCBR,
SXSWI
 New attributes available OpRcd
(operate received), OpOK (operate
OK)
 Improved testability for command
sequences

© ABB
December 31, 2018 | Slide 21 4CAE000159
Relion® 670 series version 2.1
What’s new?

Harmonized pre-configurations

 To facilitate faster deployment, familiarity


across the configurations, common look &
feel style guide
 Application block diagrams
 Application configurations including:
‒ variable naming
‒ graphic display layouts
‒ IO allocation
‒ disturbance record signal
allocation
‒ LED allocation

© ABB
December 31, 2018 | Slide 22 4CAE000159
Relion® 670 series version 2.1
What’s new?

PCM600 related

 IEDs appear based on application and not


on voltage level
 Once the new connectivity packages are
installed, the 670 series version 2.1 and
older versions if previously installed will
appear based on application

© ABB
December 31, 2018 | Slide 23 4CAE000159
Relion® 670 series version 2.1
What’s new?

PCM600 related

Control over configuration environment


 The IED serial number and firmware
version are displayed in PCM600 object
properties window
 This is read from the IED whenever the
user performs common read or partial
read from PCM600

 The PCM600 version and connectivity


package version is now displayed in the
IED LHMI
 This available on the IED after the user
performs common write or partial write
from PCM600

© ABB
December 31, 2018 | Slide 24 4CAE000159
Relion® 670 series version 2.1
What’s new?

PCM600 related

Bulk read/write of IEDs for faster and efficient


handling
 For a set of IEDs under bulk write, it is
possible to define whether to write “61850
configuration” or not.
 The same 61850 setting is used for all the
IEDs that are added for bulk write
operation.

© ABB
December 31, 2018 | Slide 25 4CAE000159
Relion® 670 series version 2.1
Key thinking – Best choice for protection and control with
enhanced security and flexibility

Our offering includes: Customer benefits are:


1 Flexible and powerful products for protection Can be configured for any application areas on protection and control
and control solutions Available as preconfigured and customized based on requirements
Supports process bus applications (support digital substations applications)
Flexibility – supports IEC 61850 Edition 1 and Edition 2 (without change of firmware)
2 Increase application with new functionality Easier settable thereby faster deployment
available in new 670 2.1 Improvement of the fast line distance protection. The existing fast line distance protection will be
(combined Quad/Mho high speed Line complemented by combined characteristics of Quad/Mho (trip times as low as 13ms). Higher transfer
Distance Protection) capacity due to faster fault clearance by distance protection.

3 Centralized Account Management (CAM) Enables easy deployment of users, access rights and certificates in the substation automation system.
Together with ABB’s System Data Manager SDM600, it brings a powerful integration of the IEDs thereby
increasing cyber security support for compliance to NERC CIP and IEC 62351-8.

4 Flexible product naming (FPN) Together with PCM600 enables flexible product naming by enabling the mapping of an IED-vendor
independent IEC 61850 model to that of the 670 series.
Easier deployment of the 670 series when utility defined IEC 61850 communication model is to be mapped to
that of the IED model.
5 Forcing of Binary Signals Increased usability
Time saving during testing and commissioning

6 Settings via IEC 61850 Remote parameterization of the IED. Opens up possibility for vendor independent setting tools. Enables
adaptivity of line distance protection

7 Remote controllable set point for voltage Increased flexibility and usability. Voltage regulation application from SCADA system. Advanced voltage
control control applications can control the voltage thereby increased power system stability

8 Large and user friendly HMI Increased usability, multifunctional capability – monitoring, control, event/alarm listing and LED status, quick
keys menu navigation or operation

© ABB
December 31, 2018 | Slide 26 4CAE000159
Relion® 670 series version 2.1
What’s new?

670 series evolution

From 2.0  2.1


 Upgrade, migrate application

From 1.x  2.1


 New IED, migrate application

© ABB
December 31, 2018 | Slide 27 4CAE000159
Relion® 670 series version 2.1
IEC 61850 Ed1 successfully tested at SVC center

© ABB
December 31, 2018 | Slide 28 4CAE000159
Relion® 670 series version 2.1
DNV-GL(KEMA) Conformance Test - IEC 61850 Ed2,
IEC 60870 -5-103 and DNP 3.0 conformance certificate

IEC 61850 Ed2 IEC 60870-5-103 DNP 3.0

© ABB
December 31, 2018 | Slide 29 4CAE000159
Relion® 670 series version 2.1
Type test report
All 7 products are successfully type tested internally

© ABB
December 31, 2018 | Slide 30 4CAE000159
Relion® 670 series version 2.1

What can you expect?

 Expect nothing less than the best


 Expect flexibility and performance
 Expect solutions perfectly tailored to your
needs
 Expect future-proof and flexible system
architectures
 Expect outstanding communication
capabilities
 Expect world-class quality
 Expect skilled specialists from the www.abb.com/protection-control
technology leader dedicated to fulfill your
expectations and needs

We are the power of one solution for protection and control

© ABB
December 31, 2018 | Slide 31 4CAE000159
© ABB
| Slide 32 4CAE000159

You might also like