PROJECT GLOBE INTEGRA

Cluster –Case studies-2G

Pre and Post drive analysis


GLOBE NPI
INTEGRA
NCR AREA
– OVERALL
QC SOUTH
SUGGESTION
CLUSTER_005
SUMMARY
– TEST METHODOLOGY

SUGGESTION SUMMARY:

Index Case Issue Type

1.1
Poor Rx Quality
1.2
1
1.3
Poor Rx Level
1.4

2.1

2.2 2 Handover Failure

2.3

3.1 3 Call Setup fail

4.1 4 Call Drop


GLOBE NPI
INTEGRA
NCR AREA
– OVERALL
QC SOUTH
SUGGESTION
CLUSTER_005
SUMMARY
– TEST METHODOLOGY

CASE EVENTS ROOT CAUSE


BUILDING BLOCKAGE
ELEVATION
1 POOR COVERAGE INTER SITE DISTANCE HIGH
OOVERSHOOTING/OVERLAPPING
SWAP
TCH FREQ CLASH
BCCH FREQ CLASH
NBR NOT DEFINED
INTERFERENCE
NO DOMINANT CELL
2 POOR QUALITY SITES ALARM
POOR QUALITY
TCH INTERFERENCE HIGH
NBR NOT DEFINED
CELL BREATHING
3 HO FAILURE/CALL DROP CO-BSIC
LOW S/G STRENGTH
CM SERVICE REJECT
4 CS FAILURE UE ISSSUE
ANALYSIS –WORK FLOW
2G ANALYSIS

COVERAGE POOR QUALITY EVENTS

HO FAILURE CALL DROP CS FAILURE


IF GOOD OR GOOD IF GOOD OR GOOD
BAD? BAD?
BAD
NO IF YES OR NO? NO
BUILDING BLOCKAGE IF YES OR NO?
ELEVATION
INTER SITE DISTANCE HIGH
BAD
YES YES
OVERSHOOTING/OVERLAPPING
SWAP POOR QUALITY LOW S/G STRENGTH
TCH FREQ CLASH TCH INTERFERENCE CM SERVICE REJECT
BCCH FREQ CLASH HIGH UE ISSSUE
NBR NOT DEFINED NBR NOT DEFINED
INTERFERENCE CELL BREATHING
NO DOMINANT CELL CO-BSIC
SITES ALARM

NO ANALYSIS
PROJECT GLOBE INTEGRA
Case study-1

Pre & Post DT analysis-Quality and Coverage


1.1 GLOBE INTEGRA – RX QUALITY :

PRE RX QUALITY PLOT : POST RX QUALITY PLOT :

MAINTAINED

Area Name Cell Name KPI Name Pre (10 to 16 May 17) Post (23 to 29 May 17) DT Status OSS Status
SIGAW-2 NPI_2G CSFR% 0.94 0.96 Maintaining
SIGAW-2 NPI_2G DCR% 0.33 0.35 Maintaining
SIGAW-2 NPI_2G AVE_UL_VQI% 391.99 388.40 Maintaining
SIGAW-2 NPI_2G TCH Traffic 13.04 13.44 Maintaining
Area 1 Maintained
SIGAW-2 NPI_2G HOSR% 99.10 98.92 Maintaining
SIGAW-2 NPI_2G SDROP% 0.46 0.55 Maintaining
SIGAW-2 NPI_2G FR_DownLink_QUAL_0-4 92.28 91.12 Maintaining
SIGAW-2 NPI_2G FR_Uplink_QUAL_0-4 97.39 96.48 Maintaining
TEST SERVING
EVENT ROOT CAUSE SOLUTION/s STATUS
METHOD CELL/S
Present Status: No changes in Drive Test KPIs and most of the OSS KPIs are maintaining.
With Permanent Solution - SIGAW (OWO)
Status: TRFS Target (June 2017)
Parameter modification implemented by NOC

Approved by GT RPI. Issued FT: 1479496------- for NOC implementation on 19th May 2017
TCH Frequency
Poor Rx
2G Locked SIGAW-2 Clash & Sent request for parameter modification for GT RPI counterpart’s approval Pending
Quality
Overshooting
Pre-DT Analysis: Poor Quality issue observed in issue area due to TCH Frequency clash between SIGAW-2 & HOWMART-2
and also SIGAW-2 is not serving dominantly, As per Drive Team confirmation there was a building block in SIGAW-2 serving
area.
Recommendation:
• SIGAW-2 to TCH Frequency to be changed from (14,16,18,78) to (11,16,78,124).
• Physical optimization pending in cells BAGONGBARX-2, BAESAEXTX-2, BONIFACIO-1
1.2 GLOBE INTEGRA – RX QUALITY :

PRE RX QUALITY PLOT : POST RX QUALITY PLOT :

MAINTAINED

Area Name Cell Name KPI Name Pre (10 to 16 May 17) Post (23 to 29 May 17) DT Status OSS Status
HOWMART-1 NPI_2G CSFR% 1.14 1.33 Maintaining
HOWMART-1 NPI_2G DCR% 1.12 0.71 Improved
HOWMART-1 NPI_2G AVE_UL_VQI% 377.73 381.42 Maintaining
HOWMART-1 NPI_2G TCH Traffic 4.66 4.45 Maintaining
Area 2A Maintained
HOWMART-1 NPI_2G HOSR% 95.00 96.61 Improved
HOWMART-1 NPI_2G SDROP% 1.30 1.52 Maintaining
HOWMART-1 NPI_2G FR_DownLink_QUAL_0-4 89.52 90.64 Improved
HOWMART-1 NPI_2G FR_Uplink_QUAL_0-4 89.84 89.82 Maintaining
TEST SERVING
EVENT ROOT CAUSE SOLUTION/s STATUS
METHOD CELL/S
Present Status: Slight improvement observed in Quality KPI during Drive Test
1.2% improvement observed in DL Quality.
Parameter modification implemented by NOC

Approved by GT RPI. Issued FT: 1479496------ for NOC implementation on 20th May 2017

Poor Rx TCH Frequency


2G Locked HOWMART-1 Sent request for parameter modification for GT RPI counterpart’s approval Improved
Quality Clash

Pre-DT Analysis: Poor Quality issue observed in issue area due to TCH Frequency clash between HOWMART-1&
CONGRE SAV-1. Even though the cells HOWMART-1 & CONGRE SAV-1 is not serving in issue area, Its coming NBR
list with good signal strength in issue area.
Recommendation:
• HOWMART-1 TCH Frequency to be changed from (8,75,77,80) to (8,123,77,80)
1.3 GLOBE INTEGRA
GLOBE – RXAREA
NPI NCR LEVEL
QCDEDICATED MODE : – GSM RESULT
SOUTH CLUSTER_005

PRE RX LEVEL ANALYSIS : POST RX LEVEL ANALYSIS :

TEST SERVING ROOT STAT


EVENT SOLUTION/s
METHOD CELL/S CAUSE US
Present Status : Physical optimization Pending due to Rental issue in SCTALBANO
With Permanent Solution : EDSA_WestTriangle_QuezonCity_NCR

Pre-DT Analysis: Poor coverage issue observed due to Site SCTALBANO (G900 &
2G SCTALBANO POOR OVERSHOO G1800) is Overshooting in issue area. Marked the same in Neighbor List window with better Pendi
Locked X-1 COVERAGE TING Rx Level. ng

Recommendation : +2 degree M-TILT to be apply in SCTALBANO-1 & +1 degree E-TILT,


+2 M-TILT to be apply in SCTALBANOX-1)
GLOBE
1.4 GLOBE NPI NCR
INTEGRA – RXAREA QC SOUTH
QUALITY - AREACLUSTER_005
1.4 : – GSM RESULT

PRE QUALITY ANALYSIS : POST QUALITY ANALYSIS :

500m

Cell Name KPI Name Pre(24 to 25 May) Post(31 May to 1 Jun) DT Status Remarks TA Details
GLORIETTA-2 NPI_2G TCH Traffic 35.69 14.06 Degraded
GLORIETTA-2 NPI_2G HOSR% 96.70 98.10 Improved
GLORIETTA-2 NPI_2G CSFR% 1.29 0.00 Improved GLORIETTA-2 down tilted +2 Deg E.Tilt and
Swap Not Cleared
74% of TA sample reduced in >=1Kms
GLORIETTA-2 NPI_2G FR_DownLink_QUAL_0-4 91.83 86.11 Degraded
GLORIETTA-2 NPI_2G FR_Uplink_QUAL_0-4 93.44 95.51 Improved
GLORIETTA-2 NPI_2G DCR% 1.43 0.23 Improved

TEST SERVING ROOT


EVENT SOLUTION/s STATUS
METHOD CELL/S CAUSE
Present Status : Applied +2 Deg E.Tilt in GLORIETTA-2
74% of TA sample reduced in >=1Kms
1.29 %(Pre) to 0%(Post)CFSR improved,83% improvement in DCR,
2.2% improvement in ULQ,1.4% improvement observed in HOSR.
No Call setup Failure observed in Post Drive Test
2G CABLE Pending
GLORIETTA-2 POOR RX QUALITY
Locked SWAP Pre-DT Analysis: Suspected cable swap between GLORIETTA-1 & 2and caused
Quality patch. And also cell MRTBUENDIA-3 overshooting in issue area, Marked the
same in Neighbor List

Recommendation : Cable swap to be checked in GLORIETTA site & +2 degree E-


TILT to be apply in GLORITTA-2 & +2 degree M-TILT to be apply in MRTBUENDIA-2
PROJECT GLOBE INTEGRA
Case study-2

Pre & Post DT analysis- Handover Analysis


2.1 GLOBE INTEGRA – HANDOVER FAILURE ANALYSIS :

PRE HANDOVER FAILURE ANALYSIS : POST HANDOVER FAILURE ANALYSIS :

IMPROVED

TEST SERVING
EVENT ROOT CAUSE SOLUTION/s STATUS
METHOD CELL/S

Present Status :No Handover Failure observed in Post Drive Test

Post – DT Analysis : In Post Drive Test report, there was no Handover Failure observed in Area-3
Improve
2G Locked WHOPEX-2 HO Failure UE ISSUES
Pre-DT Analysis: Handover failure was happened as UE already got disconnected and channel also released, After that only
d
Handover command initiated and got failure.
2.2 GLOBE INTEGRA – HANDOVER FAILURE :

PRE RX QUALITY PLOT : POST RX QUALITY PLOT :

IMPROVED

Area Name Cell Name KPI Name Pre (10 to 16 May 17) Post (23 to 29 May 17) DT Status OSS Status
MRTBONI-3_4RFS NPI_2G CSFR% 1.08 0.48 Improved
MRTBONI-3_4RFS NPI_2G DCR% 0.39 0.35 Maintaining
MRTBONI-3_4RFS NPI_2G AVE_UL_VQI% 375.12 378.24 Maintaining
MRTBONI-3_4RFS NPI_2G TCH Traffic 18.62 14.84 Maintaining
Area 6B Improved
MRTBONI-3_4RFS NPI_2G HOSR% 95.69 98.19 Improved
MRTBONI-3_4RFS NPI_2G SDROP% 0.63 0.55 Maintaining
MRTBONI-3_4RFS NPI_2G FR_DownLink_QUAL_0-4 92.13 94.48 Improved
MRTBONI-3_4RFS NPI_2G FR_Uplink_QUAL_0-4 96.86 96.23 Maintaining
TEST SERVING
EVENT ROOT CAUSE SOLUTION/s STATUS
METHOD CELL/S
Present Status :Improvement in Rx Quality in drive test with
No Handover Failure observed 2.6% improvement observed in HOSR,
2.5% improvement observed in DL Quality
ANTONIOBLDG-3 Down tilted +1 M.Tilt & +2 E.Tilt
29% of TA Sample reduced in >=1Kms
TCH OSS KPIs are maintained .
Parameter modification implemented by NOC
MRTBONI- Handove Frequency
2G Locked Approved by GT RPI. Issued -FT:1479499-------- for NOC implementation on 19th May 2017 Improved
3_4RFS r Failure Clash & Sent request for parameter modification for GT RPI counterpart’s approval
Overshooting
Pre-DT Analysis: Poor Quality issue observed in issue area due to TCH Frequency clash between ANTONIOBLDG-3 & MRTBONI-3_4RFS and
MRTBONI-3 & BONIMAYON-2, Slight improvement observed in Rx Quality, However we will check the post KPI stats after Physical optimization done in
overshooting cells(ANTONIOBLDG-3 & PARAGONOD-3)
Recommendation:
• MRTBONI-3_4RFS TCH Frequency to be changed from ( 4,12,20 ) to (12,15,124.)
• Physical optimization required in cells ANTONIOBLDG-3 & PARAGONOD-3
GLOBE
2.3 GLOBE NPI NCR
INTEGRA AREA QC SOUTH
– HANDOVER CLUSTER_005
FAILURE : – GSM RESULT

PRE HANDOVER FAIL ANALYSIS : POST HANDOVER FAIL ANALYSIS :

Cell Name KPI Name Pre(24 to 25 May) Post(31 May to 1 Jun) DT Status Remarks TA Details
GLORIETTA-2 NPI_2G TCH Traffic 35.69 14.06 Degraded
GLORIETTA-2 NPI_2G HOSR% 96.70 98.10 Improved
GLORIETTA-2 NPI_2G CSFR% 1.29 0.00 Improved GLORIETTA-2 down tilted +2 Deg E.Tilt and
Swap Not Cleared
74% of TA sample reduced in >=1Kms
GLORIETTA-2 NPI_2G FR_DownLink_QUAL_0-4 91.83 86.11 Degraded
GLORIETTA-2 NPI_2G FR_Uplink_QUAL_0-4 93.44 95.51 Improved
GLORIETTA-2 NPI_2G DCR% 1.43 0.23 Improved
TEST SERVING ROOT
EVENT SOLUTION/s STATUS
METHOD CELL/S CAUSE
Present Status : Applied +2 Deg E.Tilt in GLORIETTA-2
74% of TA sample reduced in >=1Kms
1.29 %(Pre) to 0%(Post)CFSR improved,83% improvement in DCR,
2.2% improvement in ULQ,1.4% improvement observed in HOSR.
Improve
2G HANDOVER CABLE No Call setup Failure observed in Post Drive Test
GLORIETTA-2 d
Locked FAILURE SWAP Pre-DT Analysis: Suspected cable swap between GLORIETTA-1 & 2and caused
Quality patch. And also cell MRTBUENDIA-3 overshooting in issue area, Marked the
same in Neighbor List
Recommendation : Cable swap to be checked in GLORIETTA site & +2 degree E-
TILT to be apply in GLORITTA-2 & +2 degree M-TILT to be apply in MRTBUENDIA-2
2.3
GLOBE GLOBE
GLOBE NPI NCR
INTEGRA
INTEGRA – AREA
GSMQC: EVENT
– HANDOVER SOUTH CLUSTER_005
FAILURE :
FAILURE – GSM RESULT
ISSUE – AREA 3
PRE HANDOVER FAIL ANALYSIS : POST HANDOVER FAIL ANALYSIS :

Handover Failure – Resolved

Handover Failure

QUALITY

QUALITY - Improved

Analysis: Handover Failure due to TCH. Interference Band 4-5 Actions Taken: During the Post Drive Test TCH Interference Band 4-5
reduced From 76.86% to 48.18%.
AREA NAME CELL NAME KPI NAME PRE POST OSS KPI STATUS DT STATUS
NP 2G CSFR 7.49 4.7 IMPROVED
NP 2G DCR 4.12 2.75 IMPROVED
NP 2G HOSR 93.71 95.2 IMPROVED
NP 2G SDROP 2.07 1.43 IMPROVED
AREA 3 MERVILLE3-1 IMPROVED
%FR_DOWN_QUAL_0-4 97.45 95.65 IMPROVED
CELL.KPI.TCH.TRAF.ERL.TRAF 6.99 12.59 IMPROVED
NPI_2G TCH_Interference_BAND_4-5 76.86 48.18 IMPROVED
NPI_2G TCH_Interference_BAND_3-5 99.84 88.39 IMPROVED

“It’s a Quality Year”


PROJECT GLOBE INTEGRA
Case study-3

Pre & Post DT Call setup Failure Analysis


GLOBE NPI
GLOBE INTEGRA NCRSETUP
–CALL AREA QC SOUTH CLUSTER_005 – GSM RESULT
FAILURE:

PRE CALL SETUP FAIL ANALYSIS : POST CALL SETUP FAIL ANALYSIS :

TEST SERVING ROOT


EVENT SOLUTION/s STATUS
METHOD CELL/S CAUSE

Present Status : No Call setup Failure observed in Post Drive Test


Pre-DT Analysis: Call setup failure happened due to UE issue. UE sent CM service
Improve
2G CALL SETUP UE Abort massage(because of incoming call or UE wants to change the service) to
GLORIETTA-2 d
Locked FAILURE ISSUES network for aborting the current services, and after sending Abort massage UE applied
for a new call in the activated state(cant request channel in activated state ), so the call
failure happens.
PROJECT GLOBE INTEGRA
Case study-3

Pre & Post DT Call Drop


GLOBE NPI
GLOBE INTEGRA NCR DROP
– CALL AREA QC
: SOUTH CLUSTER_005 – GSM RESULT

PRE CALL DROP ANALYSIS : POST CALL DROP ANALYSIS :

Cell Name KPI Name Pre(24 to 25 May) Post(31 May to 1 Jun) DT Status Remarks TA Details
GLORIETTA-2 NPI_2G TCH Traffic 35.69 14.06 Degraded
GLORIETTA-2 NPI_2G HOSR% 96.70 98.10 Improved
GLORIETTA-2 NPI_2G CSFR% 1.29 0.00 Improved
GLORIETTA-2 down tilted +2 Deg E.Tilt and 74% of
Swap Not Cleared TA sample reduced in >=1Kms
GLORIETTA-2 NPI_2G FR_DownLink_QUAL_0-4 91.83 86.11 Degraded

GLORIETTA-2 NPI_2G FR_Uplink_QUAL_0-4 93.44 95.51 Improved


GLORIETTA-2 NPI_2G DCR% 1.43 0.23 Improved
TEST SERVING ROOT
EVENT SOLUTION/s STATUS
METHOD CELL/S CAUSE
Present Status : Applied +2 Deg E.Tilt in GLORIETTA-2
74% of TA sample reduced in >=1Kms
1.29 %(Pre) to 0%(Post)CFSR improved,83% improvement in DCR,
2.2% improvement in ULQ,1.4% improvement observed in HOSR.
No Call setup Failure observed in Post Drive Test
Improve
CALL CABLE
2G Locked GLORIETTA-2 d
DROP SWAP Pre-DT Analysis: Suspected cable swap between GLORIETTA-1 & 2and caused Quality
patch. And also cell MRTBUENDIA-3 overshooting in issue area, Marked the same in
Neighbor List

Recommendation : Cable swap to be checked in GLORIETTA site & +2 degree E-TILT to be


apply in GLORITTA-2 & +2 degree M-TILT to be apply in MRTBUENDIA-2
GLOBE INTEGRA – GSM : QUALITY ISSUE & EVENT FAILURES – AREA 2
PRE CALL DROP ANALYSIS : POST CALL DROP ANALYSIS :
Call Dropped Call Dropped – Resolved

QUALITY QUALITY - Improved

Actions Taken: Physical Optimization, Neighbor Optimization &


Analysis: Poor Quality & Handover Failure observed due to Overshooting
Frequency Retune (TCH).
Cell, Missing Neighbor & TCH Frequency clash.

AREA NAME CELL NAME KPI NAME PRE POST OSS KPI STATUS DT STATUS
NP 2G CSFR 1.28 1.2 IMPROVED
NP 2G DCR 0.49 0.5 MAINTAINED
NP 2G HOSR 98.97 98.99 IMPROVED
AREA 2 MRBX-1 IMPROVED
NP 2G SDROP 0.23 0.22 MAINTAINED
%FR_DOWN_QUAL_0-4 97.5 97.1 MAINTAINED
CELL.KPI.TCH.TRAF.ERL.TRAF 35.4 34.4 MAINTAINED
“It’s a Quality Year”