ISBA INAGURATED
ON 26-10-91
• BY OIL MINISTER
• INITIAL CAPACITY
• 25,000 B/D
• ELF CRUDE
• ISBA CRUDE
• THROUGH OLD LINE
• TO OMAR
GAS EXPORT
TO OMAR
STARTED IN
JAN.92
BROWN & ROOT
RECIPROCATING GAS
COMPRESSORS
COMMISSIONED.
FIRST PROBLEM
FOAMING PROBLEM
• DEFOAMER INJECTION
• STARTED ON
• 5-4-92
OIL EXPORT TO
THAYYEM
• IN MARCH 92
• AND OMAR LINE
• CLOSED
OIL TRAIN-1
DEBOTTLE NECKING
DONE

• CAPACITY
• INCREASED TO
• 40,000 B/D
• NOV 92
HEAVY SNOW FALL
• STATION CONTINUES TO RUN
• ROAD BLOCKED 2 DAYS
• NO FOOD
• JAN 93
TRIAL WITH ONE DEGAS
BOOT
& ONE TANK
• CAPACITY 36,000 B/D
• MARCH 93
OIL TRAIN - 2
COMMISSIONED
BY SRB GERMANY

• CAPACITY
• 40,000 B/D
• 25-6-93
• EPF ABANDONED 24-7-93
T-126 TOP MANHOLE
LID BLOWN OFF
• GAS BREAKTHROUGH
• AUGUST 93
GROUND FLARE
AND WATER SPRAY
DEC 93
• OLD FLARE STACK TOPPLED
DOWN
• AIR BLOWER ABANDONED
• NEW FLARE LIGHTED ON
• 21-4-94
JULY-94
COMPUTER INTRODUCED
ROAD ACCIDENT
ON 17-7-94
• DAY SHIFT CREW CHANGE
• MET WITH MINIBUS ACCIDENT
• MINOR INJURIES
• SAFETY RECORD STARTS NEW
OIL MINISTER VISITS
ON 8-9-94
MANY CHANGES INITIATED
GAS COMPRESSION
WATER INJECTION
MANPOWER CHANGES
GTT-2 GAS PLANT
BY PETROFAC

• COMMISSIONED ON 23-1-95
• CAPACITY 80 MM SCFD
• EXPORT VIA NEW 20” LINE
I.P. GAS EXPORT
TO SPC
COMMISSIONED
ON 24-5-95
COMPRESSORS
SCRUBBERS
MODIFIED BY PETROFAC
IN MAY 95
ISB-123 BLOW OUT
ON 3-5-95
• 2-5-95 GAS SEAPAGE
• FROM GROUND
• 7-5-95 OIL RECOVERY
• 83855 B/D
• 10-6-95 FIRE BROKE OUT
• 10-6-95 FIVE KILLED
• 5-8-95 WELL/FIRE KILLED
• S.E.Wells C/I to build up press.
SHUT DOWN TRENDS
17

DAY SHIFT
NIGHT SHIFT

83
OMAR WATER SUPPLY
STARTED
ON 17-9-95
THAYYEM WATER
SUPPLY
• STARTED ON 25-4-96
• BLACK WAXY WATER
• PUMP BREAK-
• DOWNS INCREASED
• W/I AREA CONTAMINATED
CONGRATULATIONS
TO UES

2
• 2 MILLION MAN HOURS
• WITHOUT LTI
• MARCH 1998
• MEMENTO GIVEN
CONGRATULATIONS
TO A.F.P.C. 7
• 7 MILLION MAN HOURS
• LTI FREE
• ON 5-6-99
OMAR POWER UPGRADE
BY TPL
• 20 kV POWER SUPPLY
• COMMISSIONED
• ON 20-7-97
K-46660 CENTRIFUGAL
GAS COMPRESSOR

• NUOVO PIGNONE 3 STAGE


• 40 BAR DISCHARGE
• 18-1-99 TRIAL RUN
• 3-3-98 COMMENCED TEST RUN
• 4-3-98 K-462 A/B ISOLATED
• 7-3-98 COMPR. OPERATIONAL
AL ISBA
PRODUCTION
AL ISBA PRODUCTION
25
M
20
M
15
B
B 10
L
S 5

0
92 93 94 95 96 97 98 99

YEARS