“How Do We Drive BIM in The Right Process”

By : Ahmad Shiddiq Wangsaputra, ST, IAI


01
“BUILDING INFORMATION MODEL”
“BIM IS DATABASE IN 3D MODELS”
“BIM IS AN INTEGRATED MODEL BETWEEN 2D AND
3D”
“BIM CONTAINS INFORMATION TO BE USED WITH ALL STAKEHOLDERS”
02
“BIM IS ABOUT COMMUNICATION”
TRADITIONAL 2D Architect
CAD PROJECTS Services
Civil /
Structure
COORDINATION Engineer
Engineer

Quantity
MEP
Surveyor

Facilities Contractor
Manager / Builder

Project Building
Manager Owner
Information Flow
Design Team

Supply Team

Construction
Team

Operation
Team
FAILURE
FAILURE
FAILURE
2DFloor Plan
(+100cm Floor Plan Cut Plane)
FAILURE
TYPICAL
BIM CONSTRUCTION
is About PROJECTS 3.000
Communication
– 20.000 RFI (REQUEST FOR INFORMATION)
200-1000 PAGES OF 2D DRAWINGS
TRADITIONAL 2D
CAD PROJECTS
INFORMATION FLOW
TRADITIONAL 2D Architect
CAD PROJECTS Services
Civil /
Structure
COORDINATION Engineer
Engineer

Quantity
MEP
Surveyor

Facilities Contractor
Manager / Builder

Project Building
Manager Owner
BIM BASED Architect
PROJECT Services
Civil /
Structure
COORDINATION Engineer
Engineer

Quantity
MEP
Surveyor
BIM

Facilities Contractor
Manager / Builder

Project Building
Manager Owner
BIM BASED
PROJECTS
INFORMATION FLOW
A Story About “Light Table”

Courtesy of SURE HOUSE


A Story About “Light Table”

Courtesy of SURE HOUSE


ARCHITECT | ENGINEERS | CONTRACTORS | SUPPLY TEAM

“SUPERIMPOSE A LOT OF 2D DOCUMENTS JUST TO


FIND CLASHES”
“COORDINATED MODEL IN BIM”
A Story About “Light Table”

Courtesy of SURE HOUSE


GRAPHISOFT ARCHICAD
TEAMWORK
GRAPHISOFT ARCHICAD
CLASH DETECTION
SOLIBRI MODEL CHECKER
CLASH DETECTION
BIM COLLAB ZOOM
ISSUE MANAGEMENT
BIM COLLAB ZOOM
ISSUE MANAGEMENT

IFC4, BIM ISO 16739


BIM COLLAB ZOOM
ISSUE MANAGEMENT
CASE STUDY
FULLY OPEN BIM PROJECT
“PELINDO 3 OFFICE CENTER”

Architect

IFC
Civil /
MEP Structure
Engineer
CASE STUDY
FULLY OPEN BIM PROJECT
“PELINDO 3 OFFICE CENTER”
CASE STUDY
FULLY OPEN BIM PROJECT
“PELINDO 3 OFFICE CENTER”
CASE STUDY
FULLY OPEN BIM PROJECT
“PELINDO 3 OFFICE CENTER”

Designer Team Platform

Contractor Team Platform


HOW BIM REDUCES ERRORS?
Shared Project Model
Coordination and Collaboration
Clash Detection
Information Exchange with IFC
Geometry Exchange with IFC
Issue Management wit BCF
(Shiddiq Wangsaputra, 2018)
03
“BIM HANDOVER CHALLENGES”
HANDOVER
TRADITIONAL 2D
CAD PROJECTS
COLLABORATION
Architect
REWORK!

Design Review Coordination REWORK!

Civil /
MEP Structure
Deliverables
Engineer

REWORK!
TRADITIONAL 2D
CT
CAD PROJECTS
HANDOVER
DESIGN TEAM DT CON SC

HANDOVER OW
ST
Architect HANDOVER

Design Review Coordination OPR


FM OP
Civil /
FB
MEP Structure
Deliverables
Engineer HANDOVER

DT SUP SP

PM
TRADITIONAL
HANDOVER
STRUCTURAL ENGINEER?
MECHANICAL ELECTRICAL?
CONSTRUCTION?
COST?
“REWORK”
“REWORK”

“REWORK”
“REWORK”

“REWORK”
“REWORK”
“INFORMATION LOSS”
“INFORMATION, DATA AND GEOMETRY IN BIM
SHOULD BE USED AFTER HANDOVER BETWEEN
STAKEHOLDERS”
BIM BASED
PROJECT
COLLABORATION
Uniformat and
Masterformat in BIM
Building Information Models are rich datasets
that can be used in the process of creating
estimates. Understanding how to use
UniFormat and MasterFormat in a project
integrating model-based estimate is often the
first step in transitioning from exclusively 2D
based inventories and quantities.
UniFormat and MasterFormat are published
organizational standards used in North
American building Design and Construction.
The two standards are fundamentally
different in their intent.

UniFormat is a systems-
based organization of
building content.
MasterFormat is a
material-based
organization of building
content.
Concrete is a very common building material.
In MasterFormat, a value of 03-31-00 is
reserved for Concrete Material. All use of
concrete will be specified with this value of
03-31-00. However, concrete material is used
in the construction of many building systems.
UniFormat can be used to differentiate the
many places concrete is used in a building.
Examples of UniFormat codes that can
identify how concrete is being used in a
project. Uniformat Masterformat
Rich Creveling, Senior Estimator for
Swinerton Builders, has vast experience as a
VDC Coordinator and BIM consultant.
HANDOVER

HANDOVER

HANDOVER
HANDOVER

HANDOVER

HANDOVER
HANDOVER

HANDOVER

HANDOVER
• Design Team: Architects, engineers, and special consultants

• Supply Team: Building product manufacturers, fabricators, and suppliers

• Construction Team: General contractors, sub-contractors, and trades

• Operations Team: Owners, operators, and facility managers


HANDOVER CHALLENGES?
Improve Interoperability
Model, Information, Data should be transferred between stakeholders
No more information and geometry loss

(Shiddiq Wangsaputra, 2018)


ZAHA HADID
DONGDAEMUN DESIGN PLAZA
BIM (Building Information Modeling)
For Professionals
BIM (Building Information Modeling)
For Professionals
BIM (Building Information Modeling)
For Professionals
“BIM IS ABOUT COMMUNICATION”
“BIMX LIVE DEMO”
“LEGO CHALLENGES”

2D CAD TEAM vs BIM TEAM


JAMAN NOW!

Hand Drafting 2D CAD 3D


•Pencil •Autocad 2D •Autocad 3D BIM
•Paper •Sketchup

“If we stay in one place, we will


become outdated”
(Satoru Iwata)
Compiled By: