SANITARY ENGINEERING
UNIT-5
SEWER APPURTENANCES
• Inlets
• Catch Basins
• Clean Outs
• Manholes
• Lamp Holes
• Flushing Tanks
• Oil and Grease Traps
• Inverted Siphons
• Storm Regulators
Main parts of sewerage system
Locations of Inlets
Cleaning
Pipe
Water is flushed at high speeds (or) flexible rods inserted for cleaning
Deep Manholes
Purpose: Inspection, Flushing , Cleaning and Ventilation of sewers
M
H
Water
source
M
H
Ventilating Column
Laying of sewers
Setting out: Positions of manholes are located on ground. Sewer line is planned between
two manholes at a time. Usual practice is starting from end to start.
Laying of sewers
• Excavation of trench: Sufficient width provided beyond the diameter of sewer
for easy installation. Work is carried out in open cutting. For deeper depths,
shuttering provided for stability.
• Alignment and gradient: Sewers are laid on the bottom of trench as per the
gradient by taking appropriate levels. Bedding should be usually concrete or
levelled.
Laying of sewers
• Laying and joining: Sewers are carefully lowered in the
trench so that adjacent
sewers can be joined easily by socket and spigot joints.
• Backfilling the trench: The trench is backfilled without
entry of water in the trench. 0.6-0.9 m of filling above the
crown of pipe is filled with debris, large rocks carefully
placed in 15 cm thick., watered and rammed. The backfill
material is filled above, rammed till the GL.
Testing of sewers
• Straightness of alignment:
– Ball test: A smooth ball with 13 mm less diameter of sewer is rolled in sewer from
manhole upstream and collected at downstream manhole.
– Mirror test: Lamp at one end of sewer and mirror at other end of sewer are kept and
image is observed.
• Water test: Sewer pipe is allowed full of
water at pressure. Wetness of pipe surface
is observed.
Testing of sewers
• Air test: Used in large pipes when sufficient water is not available. Air is sent
under pressure and air pressure is monitored along pipe length. Pressure drop
indicates leakage. Soap solution is applied to the joints for detecting leaks.
• Once pipe is cleared the leakage test, backfilling of trench is carried out.
Testing of sewers
Maintenance of Sewers
• Purpose
– Cleaning to keep them free from any clogging
– Carrying out repair works to damaged portions
– Prolong life of sewers for efficient functioning
• Problems
• Clogging of sewers
• Health hazards
• Sewer blockage
– Silting and deposition of debris
– Sticking of greasy material in sewer
– Undesired material such as garbage/plastic thrown in sewer
• Typical operations
– Frequent inspection and supervision
– Measuring rate of flow
– Cleaning and flushing
– Repair of leaky joints
Maintenance of Sewers
Health Hazards
Protection equipment (gas mask,
safety belt, boots, gloves, oxygen
apparatus, Inhalators etc) to be
used
Cleaning of Sewers
• Small sewers
– Flushing using flexible hose pressurized with water of length 30m.
Cleaning of Sewers
• Medium sized sewers
– Using scraping instruments such as cane rodding consisting a steel cylinder
20-25 cm diameter and 6-75 m long provided with sharp cutting teeth.
Pulled in and out of sewer.
– Flushing of sewers
Cleaning of Sewers
• Medium sized sewers
– Wooden balls (Pills) of large diameter rolled in the sewer which gets
clogged and increases pressure of flow. At high pressure flow the balls are
collected at the next manhole downstream.
Cleaning of Sewers
• Miscellaneous
• Pumping of sewage from manholes
• Flexible sewer rods
• Crane and pulley mechanism with
grab bucket
Manholes
Maximum Permissible Limits for Effluent Discharges
Parameter Into inland surface Into public sewers On land for irrigation
waters IS: 3306 (1974) purposes
IS: 2490 (1974) IS: 3307 (1974)
pH 5.5-9.0 5.5-9.0 5.5-9.0
BOD5 30 350 100
COD 250 -- --
Suspended solids 100 600 200
TDS (inorganic) 2100 2100 2100
Temperature (0C) 40 45 --
Oil & Grease 10 20 10
Cyanides 0.2 2 0.2
Sulphides 2 -- --
Fluorides 2 15 --
Pesticides -- -- --
Arsenic 0.2 0.2 0.2
Cadmium 2 1 --
Chromium (+6) 0.1 2 --
Copper 3 3 --
Lead 0.1 1 --
Mercury 0.01 0.01 --
Nickel 3 3 --
Selenium 0.05 0.05 --
Zinc 5 15 --
Chlorides 1000 1000 600
Boron 2 2 2
Sulphates 1000 1000 1000
Sodium (%) -- 60 60
Ammoniacal Nitrogen 50 50 --
Maximum Permissible Limits for Effluent Discharges
Parameter Into inland surface Into public sewers On land for irrigation
waters IS: 3306 (1974) purposes
IS: 2490 (1974) IS: 3307 (1974)
pH 5.5-9.0 5.5-9.0 5.5-9.0
BOD5 30 350 100
COD 250 -- --
Suspended solids 100 600 200
TDS (inorganic) 2100 2100 2100
Sea disposal of sewage
• Sea disposal
– Sewage should be discharged deep into sea (1-1.5 km away from shore)
– Outfalls should be placed on firm foundation
– Proper dilution should take place at the point of mixing before it rises
– Diffusers are provided at the end
– Minimum depth at outfall : 3-5 m
– Sewage should be disposed off during low tides
– Wind direction and ocean currents should be considered
– Sewage being lighter than sea water rises up and forms a thin film
– Sludge banks will be formed
Tide level
1-1.5 km
Sewer
pipe
3-5 m
Sea bed
On land disposal
• Wastewater either raw or partly treated is spread on land
• Part of it evaporates and rest percolates leaving suspended solids on the
ground
• The solids are acted by bacteria in soil under aerobic conditions
• Sewage farming: Sewage used for irrigation purposes
• Irrigation processes:
– Broad irrigation (percolation rate: 2-6 mm/min)
– Rapid infiltration (Percolation rate: 6-25 mm/min)
– Overland runoff (Percolation rate: < 2 mm/min)
– Sprinkler method
– Surface method (i) Basin method (ii) Flooding method (iii) Furrow method
• Infiltration depends upon clogging at soil surface, reduced upon pretreatment
• Rapid infiltration: for both waste disposal and ground water recharge
• Bottom of basin may be covered with grass which accumulates nitrogen
• Mechanical straining or filtration of organic matter
• Overland runoff: soils with poor permeability
percolation rate:
2-6 mm/min
On-Land
Disposal
of
Sewage
Percolation rate:
6-25 mm/min
Percolation rate:
< 2 mm/min
On land disposal of sewage
Conditions favorable
• No other options are possible
• When plenty of land with good percolation is available
• Arid climate allowing quick evaporation
• Water table is low, low rainfall and shortage of irrigation water
• Cash crops growth is possible
Sewage sickness
• Clogging of sewage in soil pores resulting bad odors
Prevention of sewage sickness
• Pretreatment for removal of solids and BOD
• Provision of extra land, drying and ploughing the previous one
• Avoiding clayey soil (poor percolation)
• Creation of under drainage facility
• Sewage application in shallow depths
• Rotation of crops
Major Sewer Materials
Different Materials (Major)
• Vitrified Clay or Stone ware
• Cast Iron
• Steel Pipes
• Plain cement or RCC pipes
Factors to be considered
• Hydraulic efficiency: Low value of N
• Resistance to abrasions: Due to solids in sewage
• Resistance to corrosion: Resist gases and their corrosion
• Strength: Subjected to overburden loads, external forces
• Durability: Minimum replacement
• Cost: Economical
• Weight: Light weight for easy handling
• Imperviousness: Should not allow seepage of sewage
Vitrified Clay or Stoneware pipes
• Manufactured using clay and shales Disadvantages
at high temperature, cooled and • Weak in tension
put into mixes at high temperature • Brittle
• Surface is glazed by adding NaCl in • Bulky and heavy
the kiln
Usage
Advantages
• For house drainage and for
• Resistant to corrosion laterals
• Resistant to erosion of solids • Length: 0.3-0.9 m
• Smooth surface • Diameter: 0.1-0.3 m
• Highly impervious
• Good compressive strength
• Good to use under backfills
• Cheap
Cast Iron Pipes Steel Pipes
Advantages
Advantages
• High strength
• Resistant to tensile, compressive
• Resist tensile, compressive, or
and bending forces
bending stresses
• Temperature variations
• Resistance to acid attacks
• Light weight
Disadvantages
• Large diameter
• Costly
• Easy welding
Usage
• High external loads
Usage
• High internal pressure (eg.
Pumping) • In pumping mains
• Crossing low level areas • Outfalls, trunk sewers
• Temperature variation
• Wet ground condition
• Under the roads-breakage of roads
• Length: 3-3.5 m
• Diameter: 150-750 mm
Plain Cement or RCC pipes
• Small diameter-> Plain
• Large diameter -> RCC
Advantages
• Strong for internal/external
pressures
• On-site manufacturing
• Desired size can be made
Plain cement pipes
• Economical for large diameter
Disadvantages
• Corroded and pitted due to
corrosion due to H2S gas.
• Forms H2SO4 and results in CaSO4
after reacting with concrete.
• Reduces life span and carrying
capacity of sewer. RCC pipes
House Drainage
• Types of traps
• Gully trap
• Intercepting trap
• 2-pipe system
• 1-pipe system
• Single pipe ventilation
• Miscellaneous
Types of traps
Fittings placed to control
the flow of foul gases
from pipes to outside
Water acts as a sealant
P-trap
Different types of traps
• From floors of rooms, kitchens, baths into side
drain
Nahani trap
Gully trap
To municipal
sewer
Two-pipe system
One-pipe system
No ventilation
pipe
Only pipe for
carrying sullage
and soil waste
Pipe is extended
above and
provided a cowl
Miscellaneous fittings
• Other Fittings
– Water closets
– Urinals
– Flushing cisterns
– Wash basins
– Bath tubs
– Kitchen sinks
Environmental Sanitation
• Definition:
– Protecting public health by maintaining hygienic
environment and preventing spread of diseases.
Communicable
Water borne Diseases
diseases
Respiratory
Bacteria ……. Disease
Rural Sanitation
Conservancy System
• Removable receptacle privy
• Bore-hole privy (or Dry latrine)
• Concrete vault privy
Aqua privy (or Wet latrine)
Soakpits
Sulabh sauchalaya (hand-flush water seal latrine)
Major Forces acting on Sewers
Internal pressure due to sewage Temperature stresses
pD
fh
2t Ft ET
• fh = tensile hoop stress Ft = temperature stress
• p = internal pressure • E = Modulus of elasticity of pipe
• t = shell thickness material
• D = diameter of sewer • α = linear coefficient of thermal
expansion of pipe material
• T = Change in temperature
D
Major Forces acting on Sewers
Super imposed loads
1. Concentrated loads
P
C s PI c
W GL
Lc
• P = concentrated load acting
H
on surface (kg)
• Ic = impact factor 1-1.75 for
different traffic conditions
• Lc = 1m (max)
• Cs = Load coeff based on
Bc/2H, Lc/2H
Bc
Major Forces acting on Sewers
Super imposed loads
2. Uniformly distributed
loads
P (kg/m2)
W Cs PBc I c GL
Bc
Major Forces acting on Sewers
Super imposed loads
3. Conduits under railway
tracks
Sleepers
W 4CsUBc GL
• W = Load on conduit
H
• Cs = Load coeff based on
height of sleepers on top of
conduit
• U = udl (t/m2) based on axle
load, distance between
axles
Bc
Major Forces acting on Sewers
Loads due to backfills
General equation
W CB 2 GL
• W = Vertical load per unit
length acting on conduit
H
due to backfill ϒ
• C = Load coeff based on H/B
of trench
• B = width of trench
• ϒ = unit weight of backfill
material
B
Sewage Pumping: Basics
• Purpose: To lift sewage for reducing deep excavations
• Storage of sewage for pumping
Sump (for short periods)
• Types of wells
Ground
Wet well
Slope Dry well
• Pumping
Both sewage solids and sewage liquid
• Types of pumps
Ground Centrifugal pump
Reciprocating pump
Slopes & Pneumatic ejectors or air pressure pumps
Lifts • Pumping Stations
Location
Component parts
Wet well/Dry well
Motor room
Rising main
Emergency exit pipe
Other accessories
Sewage Pumping
Centrifugal Pumps
• Commonly used
• Main parts: (i) Casing (ii) Impeller
• Impeller rotates in casing
• Fitted with three vane type impellers open or closed. Clearance between
vanes is large enough for passing solid matter along with liquid
• Power and efficiency of CF pump
wQH
• Power, P ( kW )
p m
• wQH wQH
P( HP ) P( HP)
75
p m
75
Air pressure pumps or Pneumatic ejectors
• For pumping small quantities of
sewage to small heights
• When CF pumps are likely to clog
• Uses compressed air of about 0.15
Pa used for lifting
• Qty of air required V (m3/min) to
operate ejector
QH 10.3
V
12.2
• H: total head (m); Q: sewage
Design aspects
discharge (m3/min) -Estimate peak DWF (Q)
• Field capacity: 40% excess of V - Assume no of times ejector will operate in an hour and
estimate volume required for ejector
• Advantages - Fix height and estimate diameter
– Operation is fully automatic - Calculate area of air pipe using velocity of compressed
– Little maintenance air and Q and hence dia
- Assuming velocity in sewage main, calculate dia of
• Disadvantages sewer pipe for Q flow
– Low efficiency (~ 15%)
Industrial Wastewater Treatment
• Flow dilution
• Flow equalization & Neutralization
• Normalization of flow, concentration and pH
• Segregation based on volume and concentrations (Volume reduction & Strength reduction)
Storm Activities
water
Sump Discha
E rge
From
T
Process
P
Sewage
Dilution Principle
Concept of dilution:
High concentration, Low volume Q1C1 Q2C2
Low concentration, High volume C
High Volume, Low concentration
Q1 Q2
Low volume, Low concentration