You are on page 1of 14

Sunrise State

Andhra Pradesh
MAKE ANDHRA PRADESH YOUR BUSINESS 1
Raptadu IP

Daduluru IP

50 km

Ammavari palli IP
25 km

Penukonda IP

Gudipalli IP

Madakasira IP
Tekulodu IP

Gollapuram IP

Hindupur IP 3
Industrial Parks within 60 km - Details

S.N Industrial park Distance from KIA Total area (In acres) Land value ( In District
o (In km.) Rs.)
1 Ammavaripalli IP 3.00 163.28 2435.00

2 Penukonda IP 23.00 02.30 202.00

3 Gudipalli IP 32.00 456.27 1483.00

4 Tekulodu IP 50.00 130.00 257.00

5 Dadaluru IP 37.00 20.00 832.00 Anantapur

6 Madakasira IP 52.00 489.00 186.00

7 Gollapuram IP 62.00 285.00 1484.00

8 Raptadu IP 53.00 20.00 Yet to be fixed

9 Hindupur IP 56.00 65.00 1484.00 4


GOL L AP UR AM INDUS T R IAL P AR K

LAND DETAILS
Location Name Gollapuram
Land Type Bulk Land
Available Land 65.27 Acres
LOCATION
Village Gollapuram
Mandal Hindupur
District Anantapur
LINKAGES
Nearest Highway SH 9 ( 5.1 KM)
Nearest Railway Hindupur Station (19.2 km)
Nearest Airport Bangalore Airport (77.9 km )
Nearest Seaport Chennai Seaport (360 km )
INFRASTRUCTURE AVAILABILITY
Electrical Substation 220/11 KV , Gollapuram sub
station, within industrial estate.
Water Connectivity It will be provided
GUDIPALLI INDUSTRIAL PARK

LAND DETAILS
Location Name Gudipalli IP
Land Type Bulk Land
Available Land 1111 Acres
LOCATION
Village Gudipalli
Mandal Somandepalli
District Anantapur
LINKAGES
Nearest Highway NH 44 ( 0.02 KM)
Nearest Railway Hindupur Station (32.69 km)
Nearest Airport Puttaparthi Airport (37.71km )
Nearest Seaport Krishnapatnam Seaport (325 km )
INFRASTRUCTURE AVAILABILITY
Electrical Substation 33/11 KV , Somandepalli sub
station, 5 km. 6
Water Connectivity It will be provided
TEKULODU INDUSTRIAL PARK – (undeveloped land)

LAND DETAILS
Location Name TEKULODU IP
Land Type Bulk Land
Available Land 174.73 Acres
LOCATION
Village Tekulodu
Mandal Chilamathur
District Anantapur
LINKAGES
Nearest Highway NH 44 ( 3.0 KM)
Nearest Railway Hindupur Station (36.8 km)
Nearest Airport Puttaparthi Airport (41.8 km
Nearest Seaport Chennai Seaport (340 km)
INFRASTRUCTURE AVAILABILITY
Electrical Substation 33/11 KV , Peddanapalle 2.5 km

Water Connectivity It will be provided


MADAKASIRA INDUSTRIAL PARK

LAND DETAILS
Location Name MADAKASIRA IP
Land Type Bulk Land
Available Land 489 Acres
LOCATION
Village Madakasira
Mandal Madakasira
District Anantapur
LINKAGES
Nearest Highway NH 544 ( 1.0 KM)
Nearest Railway Hindupur Station (35.6 km)
Nearest Airport Puttaparthi Airport (71 km)
Nearest Seaport Krishnapatnam Seaport (395 km)
INFRASTRUCTURE AVAILABILITY
Electrical Substation

Water Connectivity It will be provided


DADALURU INDUSTRIAL PARK

LAND DETAILS
Location Name DADALURU IP
Land Type Bulk Land
Available Land 20 Acres
LOCATION
Village Dadaluru
Mandal Chilamathur
District Anantapur
LINKAGES
Nearest Highway NH 44 ( 0.1 KM)
Nearest Railway Hindupur Station (72.8 km)
Nearest Airport Puttaparthi Airport (46.9 km)
Nearest Seaport Krishnapatnam Seaport (348 km)
INFRASTRUCTURE AVAILABILITY
Electrical Substation

Water Connectivity It will be provided


LAND COST
• Land rate at Gollapuram Industrial park – Rs. 1484 per sq.mt

• Land rate at Tekulodu Industrial Park is - Rs.257 per sq.mt

• Land rate at Gudipalli Industrial Park is – Rs. 1483 per sq.mt

• Land rate at Madakasira Industrial Park is - Rs.186 per sq.mt

• Land rate at Dadaluru Industrial Park is – Rs. 832 per sq.mt

E l e c t r i c i t y c os t a n d W a t e r c h a r g e s i n t h e p r o p o s e d l o c a t i o n s ( T e n t a t i v e )

Water charges - RS. 40 /KL Electricity cost – Rs. 6.00 per unit

8
MINIMUM WAGES – LABOUR DEPARTMENT, GoAP
Highly Skilled: The job involves high degree of skill, judgement and capacity to supervise
Skilled: The employee should have skill and capacity to work independently
Semi-skilled: semi-skilled employee is one who has one year and above experience in the trade to be able to do
respective work and simple jobs with the help of simple tools or machines
Un-skilled: An unskilled employee is one who does work that involves the performance of the simple works
which require litter or no experience. No worker shall be classified an unskilled if he is called upon to operate any
machine

S.No Name of the category Basic wage Per point rate of VDA VDA for 735 Total wage (In Rs.)
points
OFFICE AND GENERAL CATEGORIES
1 Superintendent/ Head Clerk 5582.00 7.25 5328.75 10910.75
2 Accountant 5338.00 7.25 5328.75 10666.75
3 Telephone 5109.00 7.25 5328.75 10437.75
operator/steno/cashier
4 Typist/Computer operator 4863.00 7.25 5328.75 10191.75
5 Clerk/store keeper/time 4393.00 7.25 5328.75 9721.75
keeper
9
6 Office Boy 3809.00 7.25 5328.75 9137.75
S.No Name of the category Basic wage Per point rate of VDA VDA for 735 Total wage Total
points wage (In Rs.)
HIGHLY SKILLED CATEGORIES
7 Engineer/Supervisor 8419.00 7.25 5328.75 13747.75
8 Foreman/chargeman 7227.00 7.25 5328.75 12555.75
SKILLED CATEGORIES
9 Draughtsman/ Engine Mechanic/ 6282.00 7.25 5328.75 11610.75
Machinist/ Painter/ Blacksmith/
Auto
Electrician/ Tinker
10 Asst.Foreman/ Moulder/ Heat 5338.00 7.25 5328.75 10666.75
Treatment Operator/ Grinder/
Welder/
Coach Builder (Wood/ metal)/
Penal
Beater/ Asst.Mechanic/ Tailor/
Fitter/
Driller/ Turner/ Valcaniser/
Carpenter/
Upholster/ Bench Fitter/ Winder/
Machine Winder/ Fitter Helper/ 10
Liner/Boilerman/Tyre Mechanic
S.No Name of the category Basic wage Per point rate of VDA VDA for 735 Total wage Total
points wage (In Rs.)
SEMI-SKILLED CATEGORIES
11 Asst.Engine Mechanic/ 4393.00 7.25 5328.75 9721.75
Asst.Painter/
Asst. Auto Electrician/
Asst.Blacksmith/ Asst.
Mechinist/
Asst.Tinker/ Asst.Turner/
Asst.Driller/
Asst.Grinder/ Asst.Fitter/
Asst.Carpenter/ Asst.Welder/
Asst.Valcaniser/
Asst.Upholster/
Lubricator/ Tyre Sorter/
Tyreman/
Press Operator
UN SKILLED LABOUR
9 Cleaner/ Greaser/ 3809.00 7.25 5328.75 9137.75
Hammerman/ Tool Keeper/
Helper/ Petrol Pump Boy/
Mazdoor 11
Key Incentives for the Automobile and Auto Component
industry (1/2)
s.No Incentive Description

1 CAPITAL SUBSIDY Capital subsidy for Auto Clusters and ASMC developers – 50% of
fixed capital investment in building and common infrastructure
(maximum of ₹20 crore)

2 PATENT COST 75% reimbursement, subject to a maximum of ₹25 lakh

3 QUALITY CERTIFICATION 50% reimbursement, subject to a maximum of ₹5 lakh for MSME


units

4 INTERNATIONAL FAIRS 50% reimbursement of cost of participation in international fairs


upto ₹5 lakh to 10 MSMEs every year
Key Incentives for the Automobile and Auto Component
industry (2/2)
S.No Incentive Description

SPECIAL INCENTIVES FOR MEGA INTEGRATED PROJECTS:

1 VAT/SGST/CST • 100% CST reimbursement for 10 years or GST regime,


whichever is earlier
• Gross VAT/SGST reimbursement on sale of finished goods for
20 years, or 150% of capex spent in first 7 years, whichever is
earlier
• Concessional VAT/SGST rates on input & capital goods @ 5%,
and reimbursement of state VAT/SGST of input credit for 20
years
• 75% reimbursement of Gross VAT/SGST for 10 years from the
date of commercial production,or 100% of capex spent in first
7 years, whichever is earlier
2 OTHER TAXES AND DUTIES No entry tax and octroi duties; reimbursement of stamp duty,
transfer duty
3 WATER SUPPLY 50% of the price of existing industrial supply tariff for the initial 5

You might also like