MANAGEMENT & RECYCLE OF SOLID

WASTE IN CONSTRUCTION

TEAM NO. : 25 GUIDE NAME : Mr. Manthan.K.Vaghani

CONTENTS

ABSTRACT : AIM :
Construction waste is an important problem in current time. The main aim is to study the different concepts of “MANAGEMENT & RECYCLING SOLID WASTE
Construction waste is an unwanted products or materials that deduct IN CONSTRUCTION SITE”.
from construction works. In this construction work many types of
construction waste are generated. And in now days most of OBJECTIVE :
construction sites throw that construction waste or sell that with very To analyze construction waste for a residential site.
cheaper price. But there is another option for that besides throw or sell. To identify different construction waste in residential site.
Other ways like recycle that waste materials which can be recyclable To classify construction waste which can be recycled, reuse & reduced.
To suggest suitable methods for recycle and reuse of construction waste.
and reuse that waste materials which can be reusable. In construction
industries all days are no same means in some part of construction of NEED OF STUDY :
structure there is more amount of construction waste are generating Construction waste is one of the important parts in construction management. During construction
and, in some part, less amount of construction waste generated. In this project, some proportion of construction waste is collected which can be again used in construction
project we find out types of methods for recycling and reuse of project which can be done by recycle.
construction waste materials like melting, reuse wood, and crushing.
By the use of these methods we can save the money and use that SCOPE OF STUDY :
money to other developing in construction waste. And more of the This study is related to residential site only. This study is based on waste management.
benefit is that the environment pollution is reduced by the recycle
RESULTS :
process and reuse process.
CONCLUSION :
DATA ANALYSIS :
REFERENCES :
We are visit industrial site for the recycling of steel. We are collect different
data related to our project. Over there we see how the actual process of
recycling of steel by melting process. We go to Bhavnagar city for this visit .
We also learn that there are different types of steel bars according by size
and shape. We learn that per day no of manufacture of steel bar is 26 to
27 ton. In that factory row material cost is 34,150/- per ton and selling
43,250/- per ton. Into row material per ton 850 kg are in use. Per 1 hour 2
ton are manufacturing . Total 8% are into burning waste.

PHOTOGRAPHS :