Irrigation and CAD Department

Presentation on
Irrigation Projects
1
VISION
 One of the main driving force for creation of Telangana has
been neglect of water Resources utilization in the region over
many decades leading to acute distress in farming sector.
 Consequently, the Government of Telangana has taken up
the task of providing assured irrigation facilities to 1 Crore
acres (including existing irrigated area) as one of its main
flagship programmes spread throughout the state
 The ultimate objective is ensuring 1 Lakh Acres of irrigation
in each of the rural constituencies.
 Comprehensive restoration of Minor Irrigation systems
22
which are spread over all the villages of the state.
TELANGANA AT A GLANCE

33
Water Resources.
 Godavari Basin
Total dependable Allocation : 954 TMC
utilization so for : 450 TMC
Balance for ongoing project : 504 TMC
 Krishna Basin
Total dependable Allocation : 299 *TMC
utilization so for : 262 TMC
* Telangana state is actively projecting its water requirements
to an extent of 936 TMC ( drawal) & 771 TMC (Consumptive)
Before the KWD Tribal which is under progress.
44
 For creating the envisaged Irrigation of 1 crore acres, 36 nos
of Major & Medium projects are taken up with IP of 69.72
lake acres with a total cost of 1,94,403 Crores.
 10 nos of projects completed so for and overall the new IP
created is 14.84 lakh acres & 2.6 lakh acres stabilization.
 Total Expenditure is 72,592 Crores so for and it is proposed to
complete all the projects in the next 4 to 5 years.

55
The Major issues involved in these projects are
 L.A Total : 3.769 lakh acres, Acquired : 3.106 lakh acres,
Balance :0.664 lakh acres.
 Forest : 6931 acres.
 Inter Departmental activities viz.,
Railway Crossings : 58nos, completed-35,Progress-10
Highways Crossings(NHAI&NH) : 86 nos, Completed -25, progress-12 .
R&B Crossings: 479nos, completed-196,Progress-12
 Financial Resources is one of the major requirements in the completion of
the projects.
 The projected requirements for these is about 1,34,840 Crores for the
programme in the next 4 to 5 year.

66
Projects in Godavari Basin in Telangana State
Sl. No. Name of the Project Storage (TMC)
MAJOR
1 Nizam Sagar * 58.000
2 Singur
3 Alisagar &Guthpa LIS 4.900
4 Indiramma Flood flow canal from SRSP 19.979
5 Kinnerasani 8.139
6 SRSP-II 22.999
7 Sripada Yellampally Barrage 60.360
8 Dr. B. R. Ambedkar Pranahitha Project 160.000
9 PV Narsimharao Kantanapally (Thupakulagudem) 100.000
10 JCRGLIS 60.000
11 Choutapally Hanumanthu Reddy LIS 1.050
12 Kaleshwaram LIS 4.500
13 Lendi 2.430
14 Sita Rama Lift Irrigation Scheme
15 Bhaktha Ramadasu Lift Irrigation Scheme
16 Lower Penganga Project 5.119
MEDIUM
17 Suddavagu 2.230
18 Gollavagu 0.830
19 Ralivagu 0.620
20 Mathadivagu 0.905
21 Peddavagu – Ada 8.599
22 Peddavagu – Neelawai 1.727
23 Peddavagu – Jagannadapur 1.074
24 Gundallavagu 0.244 7
25 Modikuntavagu 3.267
26 Pallemvagu 2.177
Projects in Krishna Basin in Telangana State

Storage
Sl.No. Scheme
In TMC
Major Irrigation
1. Modernization of Nagarjuna Sagar Project 105.70
2. Rajiv (Bhima) Lift Irrigation Scheme 20.00
3. AMRP (SLBC) 30.00
4. Mahathma Gandhi(Kalwakurthy) LIS 52.00
5. Jawahar (NettamPadu ) LIS 22.00
6. Palamuru Ranga Reddy LIS 90.00
7. Dindi LIS 30.00
Medium Irrigation
8. Koilsagar 3.90
9. Musi 9.40
8
GODAVARI BASIN

9
MOGALIGUNDLA BAGA REDDY SINGUR PROJECT
Preamble:
Mogaligundla Baga Reddy Singur Project was constructed across Manjira River with a
Gross capacity of 29.91 Thousand Million Cubic Feet (TMC). It is intended to provide additional
water supply requirements of 6.96 TMC to twin cities of Hyderabad and Secunderabad and
regulated releases to Nizamsagar project and Ghanpur anicut. The Power generation from the
project is 15 MW. It is at a distance of 40 Km from SangaReddy on North West Direction.

Salient Features:
• Dam
• Location : Singur (V), Pulkal(M), Medak Dist.
• Latitude : 17°45’
• Longitude : 77°56’
• River/ Tributary : Godavari/ Manjira
• Catchment area : 16,097 sq km
• Reservoir Standards
» F.R.L and M.W.L : (+) 523.60 Mt.
» Gross capacity @ F.R.L : 29.910 TMC 10
• Spillway :
» Maximum Flood Discharge : 7,80,000 Cusecs
» Crest Level : (+) 510.60 Mt.
» Head of discharge : 13.00 Mt.
» Number and size of Radial : 17 Nos. 15.00 Mt. X 13.00Mt

• Crest gates:
» Length of masonry spillway : 327.00 Mt.
» Length of Power blocks
• (Non-over flow portion of masonry dam) : 81.10 Mt.
• Earth dam
• T.B.L : (+) 527.35 Mt.
• Length of Left Flank : 3993 Mt.
• Length of Right Flank : 3120 Mt.
• Total length of earth dam : 7113 Mt. or say 7.11 Km
• Head Regulators
• Left Flank :
Sill Level : (+) 520.00 Mt.
Number and size of vents : 4 vents of 2.50 Mt. X 2.0 Mt.
11
Right Flank :
Sill Level : (+) 520.00 Mt.
Number and size of vents : 1 Vents of 1.50 Mt. X 1.0 Mt.
• Water Allocation : 29.91 TMC
• Power Generation : 15 MW

12
• Irrigation Potential:

SI. No. Year New Stabilization

1 2014-15 - -
2 2015-16 - -
3 2016-17 30,116 -
4 2017-18 9,884

• Budget Details :

Year Allocation Expenditure Incurred

2014-15 13.00 Crores 37.93 Crores


2015-16 20.00 Crores 21.78 Crores
2016-17 29.50 Crores 39.75 Crores
2017-18 50.00 Crores 18.75 Crores

13
NIZAMSAGAR PROJECT
Preamble:
• Nizamsagar Project was constructed by the erstwhile Nizam’s Government during 1923-1931
across Manjeera River a tributary to Godavari river with a storage capacity of 29.72 TMC at
Achampet (Vg), Nizamsagar (M), Nizamabad District to provide irrigation to 2.75 lakh acres in
nizambad district.. This is the third project in Manjeera valley, the first being Ghanpur Anicut
(1918) with 17,000 Acres ayacut and second being Pocharam Project (1922) with an ayacut of
17,200 Acres.

• By the passage of time, the storage capacity of Nizamsagar Project was reduced from 29.72 to
11.79 TMC due to silting up of reservoir. After conducting detailed bed surveys of reservoir the
storage capacity has been increased to 17.91 TMC, in 1976 by raising FRL from +1400.50’ to
+1405.00’ (4 ½ feet). Despite increase in capacity, the inflows in to the Project dwindled year
after year, due to increase in utilization of water in upper reaches. As a result, the gap ayacut
has been increased year after year under Project.

14
• The total ayacut, contemplated as per the Project report is 2.75 lakh Acres and is delocalized to
2.31 lakh Acres on account of submergence of certain ayacut in foreshore of SRSP and some
ayacut coming under the command of SRSP which is on the downstream side of this Project.
To meet the requirement of certain portion of gap ayacut, APSIDC and SRSP have taken up 12
Lift Irrigation Schemes on river Godavari to irrigate 23,000 Ac of this Project. With this, the net
gap ayacut stood at 92,585 Acres, which lies between distributaries D/50 to D/82.

• To meet the irrigation requirement of the gap ayacut Alisagar Lift Irrigation Scheme and Argula
Rajaram Guptha LI Scheme from foreshore of SRSP were constructed in between the years
2005 to 2007 and commissioned during the year 2007. Singitham and Kalyanivagu diversions to
supplement Nizamsagar main canal have been constructed at a cost of Rs. 985 lakhs as
suggested by the Technical expert Committee to minimize the gap ayacut, with National Bank
for Agriculture and Rural Development (NABARD) loan assistance.

• The original cost of the project at the time of construction was Rs.305.00 lakhs/ 457.08 Lakhs
(Revised).

15
Salient Features:
Dam
Location : Achampet(V), Nizamsagar (M), Nizamabad Dist.
• Latitude : 18o- 10’ North
• Longitude : 76o-56’ East
• River/ Basin : Manjira /Godavari
• Catchment area : 21,694 sq km
• Capacity of the reservoir (Original)
a)Gross : 29.716 TMC
b)Live : 25.600 TMC
• Capacity of the reservoir (Present)
a)Gross : 17.80 TMC
b)Live : 17.02 TMC

16
• Height of dam above river bed : 35.20 m
• Top width of dam : 4.27 m
• Reservoir Data
a)MWL : +428.244 m
b)FRL : +428.244 m
c)MDDL : +419.400 m
d)Sill of Regulator : +415.747 m
e)TBL : +430.377 m
• Length of dam
Gravity : 3.030 Km.
Composite : 1.505 Km.
• Max. Flood discharge : 6,25,000 Cusecs
• Regulator sluices : 11 vents (2.4 m x 3.2 m)
• Main canal : Off take at right Flank saddle

17
• Length of Main canal : 155 km
a)Distributaries : 82 Nos
b) Sub distributaries : 283 Nos
c) Discharge at head : 3400 cusecs
d) No of spill ways : 3 nos
e) Vents : 48 nos
f) Spillway length : 946 m
• Maximum designed discharge : 6.25 lakh cusecs.
• Maximum flood discharge : 5.25 lakh cusec (computed)
• Water Allocation : 58.00 TMC

18
• Irrigation Potential:

SI. No. Year New Stabilization

1 2014-15 - -
2 2015-16 - -
3 2016-17 - -
4 2017-18

• Budget Details :

Year Allocation Expenditure Incurred

2014-15 70.00 Crores 97.06 Crores


2015-16 90.00 Crores 100.76 Crores
2016-17 223.00 Crores 32.56 Crores
2017-18 108.92 Crores 20.90 Crores

19
SRI RAMA SAGAR PROJECT STAGE- II

Preamble:
• The Sri Rama Sagar Project Stage-II from Km 284 to Km 346 of Kakatiya Main Canal. The
project envisages irrigation facility to an area of 1,78,068 ha. (4,40,000 Ac.) in the drought
prone areas of Telangana region viz., Warangal, Khammam and Nalgonda duly utilizing
about 24.405 TMC of surface water in conjunction with 4.703 TMC of ground water.

• Government have accorded administrative approval for the project estimate of Rs.1043.14
Crores vide G.O.Ms.No.35, Dt: 27.02.2006 and approved under AIBP scheme at the ratio of
1:3 Central and State Government Share.

• Salient Features:
• i) Total cost of the project :Rs.1043.14 Crs.
• ii) Expenditure incurred up to 3/2014 : Rs.918.24 Crs.
• iii) Project Started during 1998
• iv) Proposed to be complete by 3/2016
20
• Irrigation Potential:

SI. No. Year New Stabilization

1 2014-15 21,160- -
2 2015-16 6,823 -
3 2016-17 - -
4 2017-18

• Budget Details:

Year Allocation Expenditure Incurred

2014-15 25.00 Crores 11.46 Crores


2015-16 25.00 Crores 8.43 Crores
2016-17 50.00 Crores 137.29 Crores
2017-18 150.24 Crores 31.71 Crores 21
FLOOD FLOW CANAL PROJECT (from Sri Rama Sagar Project)

Preamble:
• The Project envisages utilization of the flood water of Sri Rama Sagar Project to a tune of 20
TMC for irrigation of ayacut of 2.20 lakh acres in drought prone areas of Telangana Districts
of Karimnagar and Warangal. The Project was cleared by CWC in the year 1996 for an
estimated cost of Rs. 1331.30 Crores. The Government has accorded administrative
approval of Phase-I works of FFC for Rs. 859 Crores vide G.O.Ms.No.209 dt;17.11.1997.
The revised administrative approval of Phase-I & Phase-II of the project was accorded by the
Government vide G.O. Ms.No.98, I&CAD, dt:18.08.2009 for Rs. 4729.26 Crores. The works
of the project are under execution and is proposed to be completed by 2015.
• The project is proposed to irrigate an ayacut of 100000 acres and 69,000 acres in Phase-I
& II respectively in Karimnagar District.
• Phase-I:
• Construction of Head Regulator and approach channel from the fore shore of Sri Ram Sagar
Project in Nizamabad District.
• Excavation of Flood Flow Canal from Head regulator to 122.000 Kms(i.e. infall regulator of
Mid Manair Reservoir).
• Construction of Mothe reservoir with a capacity of 1.645 TMC at Mothe (V), Ramadugu (M),
Karimnagar district to irrigate 20,000 Acres.
• Excavation of Link canal @ Km.121.900 of FFC to feed Lower Manair Dam 22
• Construction of Mid Manair Dam with a capacity of 25.873 TMC at Manwada (V), Boinpally
(M), Karimnagar district.
• Two Irrigation canals from Mid Manair Dam to Irrigate 80,000 acres in Karimnagar District of
(10) mandals under Phase-I. i.e., MMR left side Canal from Km 0.000 to km 16.085 with an
ayacut of 10,500 Acres. MMR Right side canal from Km 0.000 to km 36.700 with an ayacut of
20,500 Acres, MMR Right side canal from Km 37.000 to Km 75.140 (beyond Ogulapoor
(Thotapally) Reservoir) with an ayacut of 49,000 Acres
• Phase –II :
• Formation of Ogulapoor(Thotapally) Balancing Reservoir near Thotapally (V) Bejjanki (M)
Karimnagar District( with a gross capacity of 1.700 TMC).
• Lift system from Ogulapoor (Thotapally) reservoir to Gouravelly Reservoir (Tunnel).
• Formation of Gouravelly Reservoir near Gouravelly (V) Husnabad (M) Karimnagar District
(with a gross capacity of 1.410 TMC)
• Formation of Gouravelly reservoir right side canal from Km. 0.000 to Km. 47.725 and left side
canal and Distributory system with 1,06,000 Acres of ayacut.
• Lift system from Gouravelly Reservoir to Gandipally Reservoir, formation of Gandipally
Reservoir (with a gross capacity of 0.1584 TMC ),canals and Distributory system with an
ayacut of 14,000 Acres.

23
• Salient Features:
• FLOOD FLOW CANAL
• Longitude : 78-18’-00’’ E
• Latitude : 18-55’-00’’ N
• River : Godavari
• Location : Head–Regulator at the foreshore of S.R.S.P. with approach
channel (Nizamabad Dist.)
• Nearest Town : Mupkal (V), Balkonda (M), Nizamabad District.
• Discharge required/Designed : 623 Cumecs/625.48 Cumecs
• FSD : 6.75M
• Bed width(Approach Ch) : 76M
• Side Slopes L/s. : 1:5:1
• Bed fall : 1 in 10,000
• Velocity : 1.08m/sec
• Value of N : 0.03
• Bed level at start(Km.0.000) : +325.650m

24
• FSL : +332.400m
• TBL : +333.900m
• FFL : +332.537m
• MWL : +333.246m
• Avg GL : +337.500m
• Gates size : 7.5m X 7.3m
• No. of vents : 6 Nos (6 emergency and 6 service Gates)
• Mandals benefited : 16 Mandals in Karimnagar District.
• 5 Mandals in Warangal District.
• Ayacut : 2,20,000 Acres.
• Karimnagar District – 1,00,000 Acres –(Phase-I)
• – 69,000 Acres –(Phase-II)
• Warangal District - 51,000 Acres –(Phase-II)
• Canal Section of FFC from Km. 0.00 to Km. 122.00 : 43M x 8.5M
• Discharge : 22,000 Cusecs

25
• Irrigation Potential:

SI. No. Year New Stabilization

1 2014-15 - -
2 2015-16 - -
3 2016-17 - -
4 2017-18

• Budget Details :

Year Allocation Expenditure Incurred

2014-15 200.00 157.03


2015-16 747.00 469.49
2016-17 505.27 456.65
2017-18 799.40 657.42

26
SRIPADA SAGAR YELLAMPALLY PROJECT

Preamble:
• Sripada Yellampally Project (SYP) is an important Milestone in the development of back ward
areas of Telangana Region in the State of Andhra Pradesh as well as in the proposed full
harnessing and utilization of available waters of Godavari River, as envisaged by the
Godavari Water Utilization Authority, constituted by the Government of Andhra Pradesh. The
proposed Sripada Yellampally Project is to tap the available yield in Godavari River below the
Sri Ram Sagar Project, hitherto untapped.
• It is proposed for construction of barrage across river Godavari @ Yellampally (V),
Ramagundam (M) Karimnagar Dist. to store 20.175 TMC of water for irrigating an ayacut of
220000 Acres in Karimnagar Dist. Out of this, 2 lakh acres is proposed to irrigate through
distributory canal network system under Stage II /phase I with 12 TMC of water and 20000
Acres is proposed to irrigate under Manthani LI scheme by lifting 2 TMC of water from
Cistern near NTPC. Further stabilization of 30,000 Acres of Tail end ayacut under Kaddem
Narayan Reddy Project in Adilabad Distt is proposed by lifting 3 TMC of water from
foreshore of SYP at Gudem (V), Luxettipet (M) Adilabad Dist. Apart from the above 220000
Acres, Lifting of 6.50TMC of water from foreshore of SYP at Yellampally
(V),Ramagundam(M) Karimnagar Dist. to supply to NTPC Ramagundam for power
generation is also contemplated.

27
• Salient Features:
• Stage I Phase I
• Construction of sripada Yellampally project (Barrage) :
• Location : Yellampally (V), Ramagundam (M),Karimnagar (D)
• Latitude : 18 o 501 4511 N
• Longitude : 79 o 221 3911 E
• River/Basin : Godavari River/Godavari Basin
• TBL
• Water depth >5m : +154.500 m
• Water depth <5m : +152.000 m
• Crest Level : + 138.300 m
• FRL : +148.000 m
• Sill level of radial gates : +137.800 m
• Storage capacity : 20.175 TMC
• Design Discharge : 19.75 Lakh Cusecs
• Sill level of river sluice gates : +129.000 m
• No. of River sluice Gates & size : 4 No.s & 1.50 M X 4.0 M

28
• No. of Gates and size of gates : 62 No.s & 15.60 M X 10.20 M
• No. of Stop Log Gates : 7 Nos
• Hoist System : HYDRAULIC HOIST
• Stage –I Phase–II:
• Lifting of 8.50 TMC of water from Sripada Yellampally Project (6.50 TMC to NTPC & 2
TMC to Manthani LIS) to STPP (NTPC) Cistern.
• Location : Murmur (V), Ramagundam (M),Karimnagar (D)
• Latitude : 180 491 3911 N
• Longitude : 790 231 1911 E
• River/Basin : Godavari River/Godavari Basin
• Discharge : 12384 Cumecs
• No of Lifts : 1 no
• Height of Lift : 54.81 M
• Quantum of water to be lifted : 8.50 TMC
• Water supply to NTPC : 6.50 TMC
• Water supply to Manthani LIS : 2.00 TMC
• Number of Pumps : 4 Nos x 2340 KW
• Type of Pumps : Vertical Turbine Pump
29
• Pump Capacity : 3 x 121.50=364.50 Cusecs
• Power Requirement : 7.02 MW
• Pipe Line Length : 11.65 Km
• Manthani Lift Irrigation Scheme - Lifting of 2 TMC of water from cistern near NTPC
Reservoir to feed an ayacut of 20,000 Acres.
• Location : NTPC Delivery Cistern ,Kundanpally (V),
• Ramgundam (M), Karimnagar (D)
• River/Basin : Godavari River/Godavari Basin
• Discharge : 130 Cusecs (Stage-I) & 120 Cusesc ( Stage-II)
• No of Lifts : 2
• Height of Lift : 45 m (Stage-I) & 65m (Stage-II)
• Quantum of water to be lifted : 2 TMC
• Number of Pumps : 4 Nos ( Stage-I=2 Nos & Stage-II =2 Nos)
• Type of Pumps : Vertical Turbine Pump
• Pump Capacity : 128.54 Cusecs (Stage-I) &110.88 Cusecs (Stage-II)
• Power Requirement : 3.15MW ( Stage-I) & 3.47MW ( Stage-II)
• Pipe Line Length : 12 Km (Stage-I ) & 11.200 Km ( Stage-II)

30
• Stage –II Phase–I
• Lifting of 12 TMC of water to Irrigate 2.00 lakh acres of ayacut:
• The Lift details of the scheme shown in the below table
• River/Basin : Godavari River/Godavari basin
• Type of Pumps : Vertical Turbine Pump
• No of Lifts :7
• Number of pumps : 22

31
• Irrigation Potential:

SI. No. Year New Stabilization

1 2014-15 - -
2 2015-16 - 30,000
3 2016-17 25,000 7,000
4 2017-18

• Budget Details :

Year Allocation Expenditure Incurred

2014-15 237.00 234.70


2015-16 558.00 225.58
2016-17 350.00 310.22
2017-18 408.47 109.08

32
DR. B.R. AMBEDKAR PRANAHITHA

Preamble:
• The Government of Andhra Pradesh Proposed Dr.B.R.Ambedkar Pranahitha Chevella Sujala
Sravanthi (BRAPCSS) Project with the aim of supplying water to irrigate about 16.40 Lakhs
acres of ayacut in drought prone areas in seven districts of Telangana region of Andhra
Pradesh namely Adilabad, Karimnagar, Medak, Warangal, Nalgonda, Ranagreddy &
Nizamabad.

Salient Features:

33
• Irrigation Potential:

SI. No. Year New Stabilization

1 2014-15 - -
2 2015-16 - -
3 2016-17 - -
4 2017-18

• Budget Details :

Year Allocation Expenditure Incurred

2014-15 1820.00 2486.19


2015-16 1515.10 3039.23
2016-17 0 0.00
2017-18 800.00 102.46

34
J. CHOKKA RAO DEVADULA LIFT IRRIGATION SCHEME

Preamble:
J.Chokka Rao Devadula Lift Irrigation Scheme contemplates for lifting of water from
Godavari River near Gangaram (V), Eturunagaram (M), Warangal District of Telangana to
irrigate 6.21 Lakh Acres in upland drought prone areas of Karimnagar, Warangal, Nalgonda
Districts from an Elevation +71 m. to +540m. by utilizing 38.18 TMC of water out of 467.24
TMC water available at Intake point in the river Godavari.

Salient Features:

35
• Irrigation Potential:

SI. No. Year New Stabilization

1 2014-15 58,899 -
2 2015-16 - -
3 2016-17 17,010 -
4 2017-18 15,606

• Budget Details :

Year Allocation Expenditure Incurred

2014-15 215.00 254.95


2015-16 500.00 465.13
2016-17 700.00 675.03
2017-18 1510.64 334.04

36
KALESWARAM LIFT IRRIGATION SCHEME

Preamble:
The Kaleshwaram Lift Irrigation Scheme is essentially aimed at the development of drought
prone, upland and backward areas of Telangana Region to provide irrigation facilities to an
extent of 45,000 Acres in Karimnagar district by utilizing the water available in river Godavari
downstream of the Sripada Yellampally Project after the confluence of Pranahita and Manair
Rivers in Godavari. The scheme is envisaged to lift 4.50 TMC of water from Godavari River
near Kannepally Village near Kaleshwaram, Mahadevpur Mandal, Karimnagar Dist. to feed
an ayacut of 45,000 acres.

Salient Features:
• District Benefited : Karimnagar
• River : Godavari River
• Basin : Godavari
• Source : Godavari River
• Type of Project : Major
• Latitude : 180 48’ 32’’
• Longitude : 790 55’ 51” 37
• Year of Starting : 2008
• Ayacut Contemplated : 45000 acres
• Land required : 3625 Acres (Including 644 acres of Forest
land)
• Project Cost : Rs. 632 Crores
• Water allocation : 4.50 TMC
• No. of Mandals Covered :4
• No. of Villages Benefited : 64
• No. of Pump Houses/Locations : 2 (Stage 1 - Near Kannepally (V))
(Stage 2 - Near Garrepally (V))
• Discharge : (Stage 1 - 17.010 Cumecs)
(Stage 2 - 14.300 Cumecs)
No. of Tanks : 14 (13 old + 1 New tank at Vagoddupally(V)

38
• Irrigation Potential:

SI. No. Year New Stabilization

1 2014-15 - -
2 2015-16 - -
3 2016-17 - -
4 2017-18

• Budget Details :

Year Allocation Expenditure Incurred

2014-15
2015-16
2016-17 6286.00 4532.62
2017-18 6746.87 9673.74

39
P.V. NARASIMHA RAO KANTHANAPALLY (Thupakulagudem)
Preamble:
• P.V.Narasimha Rao Kanthanpalli (Thupakulagudem) Project on Godavari River by
construction of a barrage at Kanthanapally (V), Eturunagaram (M), Warangal District and
diverting water through tunnels and lifts. A total of 50 TMC of water out of 429.06 TMC water
available at Barrage site in the river Godavari is proposed to be diverted in Phase-I and is
utilized for stabilization of 6,91,222 Acres of ayacut under Sriram Sagar Project Stage-I & II in
Warangal, Khammam and Nalgonda Districts.

• Drinking water for 8.0 lakhs population and 280MW power will be generated by this project.

• P.V.Narasimha Rao Kanthanpalli (Thupakulagudem) Project is proposed on Godavari River


near Kanthanapally (V), Eturnagaram(M),Warangal(Dist) with capacity of 22.5 TMC and
diverting a total of 50TMC of water annually by lifting from the river about 90 days by
pumping water at the rate of 182 Cumecs continuously through Tunnels and canal network
and dropping into Kakatiya canal at Km.221.00 Kms.

• The Government have accorded administrative approval vide GO.Ms.No.27, Dt:16-02-2009


for RS.10,409 Crores to lift 50 TMC water and dropping into the existing Kakatiya canal for
40
stabilization of SRSP Ayacut of Stage-I and II.
Salient Features:
• Type of Project : Multipurpose
• River / Tributary :Godavari River
• Location of Head works
a) Longitude : 80 0 24’ 35.24” E
b) Latitude :18 0 27’ 40.22” N
• River Basin
a) Name : Godavari River
b) Located in : Warangal District
c) State(s) : Andhra Pradesh
d) Countries?(if International river) : -
State(s)/Districts(s)/Taluka(s) or Tehsils
in which the following are located
b) Head works :Barrage and Power House : Kanthanapally(V),Eturunagaram (M),
Warangal District
c) Command Area : Warangal, Nalagonda and Khammam Districts
• Catchment area : 2,70,106 sq.Km
• Proposed Utilization by the project : 50 TMC
41
• a) Irrigation : 47 TMC
• b) Water Supply :3 TMC
• Proposed power Generation : 280 MW: ( 6 units each 46.66 MW )
• Maximum Design Flood : 82179 (100 yrs flood),
102745 (500 yrs flood)
• Reservoir (Water Levels (EI-m))
• T.B.L : +92.20M
• Max Water Level (MWL) : +87.78M
• Full Reservoir Level (FRL) : +85.00M
• Crest level :+75.00M
• Outlet levels :
• i) Irrigation : +76.00M
• ii) Power :+74.00M
• iii) Scour Sluice :+68.00M
• Gates : VERTICAL
• Live Storage : 22.5 TMC

42
• Irrigation Potential:

SI. No. Year New Stabilization

1 2014-15 - -
2 2015-16 - -
3 2016-17 - -
4 2017-18

• Budget Details :

Year Allocation Expenditure Incurred

2014-15 49.50 44.05


2015-16 125.00 34.06
2016-17 200.00 16.95
2017-18 505.00 31.67

43
SITA RAMA LIFT IRRIGATION SCHEME
Preamble:
• The Project has been proposed to lift 16.50 TMC of water from upstream of Dummugudem
Anicut on Godavari River near Pamulapally (v), Aswapuram (M) in Khammam District. For
Trunk-1, the total height of lift is 196.50 M up to Sudhimalla Pedda Cheruvu and for Trunk-2,
the total height of lift is 141.50 M up to Yerragunta Cistern. It is proposed to create an
irrigation potential of 1, 97,000 Acres in Khammam district and 3,000 Acres in Warangal
District. Administrative approval of the project is accorded for Rs.1681 crores. Agreement
value of all 7 packages is Rs.1247.57 crores and the expenditure incurred up to 06/2013 is
Rs.868.048 crores. 65.70 % value of work is completed. The scheme is programmed for
completion by 2014-15.
• The total land required for the completion of the project is 6251.52 acres and 717.60 acres
acquired so far.
Salient Features:
• Dam
• Location : Near Pamulapalli (V), U/S of existing
Dummugudem anicut, Aswapuram (M).
• Latitude : 17o52’ 29” North
• Longitude : 80o 52’ 26” East
44
• River/ Basin : Godavari /Godavari
• Type of Project(Major/ Medium) : Major
• Purpose : Irrigation (Irrigation / Power/ Multipurpose)
• Year of starting : 2006-07
• Height of lift(m) : Trunk-I 196.5 M ,Trunk-II 141.05 M.
• Command area Contemplated : 200000 Ac
• Land Required (including R&R) : 6192.57 Ac
• Water Allocation : 16.50 TMC
• Administrative sanction : 1681Crores (G.O.Ms. No. 249, dated.30-12-2005.)
• Length of Approach Channel : 18.600 Km.
• Total Length of Pressure Main : 70.84 KMs
• Total Length of Gravity Canal : 69.48 KMs
• Total No. of Pumps Provided : 29 Nos.
• Total Power required : 119.75 MW
• No. of villages benefitted : 150
• No. of Mandals benefitted : 17

45
• Irrigation Potential:

SI. No. Year New Stabilization

1 2014-15 - -
2 2015-16 - -
3 2016-17 - -
4 2017-18

• Budget Details :
Year Allocation Expenditure Incurred

2014-15
2015-16
2016-17 1031.02 19.17
2017-18 1008.00 151.24

46
47
GODAVARI BASIN
MEDIUM PROJECTS

48
Name of the Project : KINNERASANI PROJECT
Preamble:
The project envisages the provision for meeting the requirements of water for K.T.P.S. to
generate 1000 M.W. Power, water supply to Industrial units, Drinking water facilities and irrigation
facilities for 10,000 acres of Ayacut by using 1.5 TMC of water from the Kinnerasani river near
Yanambilu (V), Paloncha (M), Khammam Dist. in tribal area of Khammam Dist. The Project
consists of gravity canal i.e. 1). Left canal 2).Right canal. The Administrative sanction of the
project is Rs. 36.82 Crs. The amount of Agreement is Rs.32.54 Crs. The expenditure incurred is
Rs.25.66 Crs. works completed is 75%. The project is programmed to be completed by 2013-14.

Salient Features:
• Location : Yanambilu (V), Paloncha (M)
• Latitude : 17°41’00” North
• Longitude : 80°39’30” East
• River/ Basin : Kinnerasani / Godavari
• Catchment area : 1333.33 sq km
49
• Reservoir Data
» MWL : +124.08
» FRL : +124.08
» MDDL : +109.76
» Sill of Regulator : + 121.64m
» TBL : +126.52M
• Capacity of the reservoir
» Gross : 8.40TMC
» Live : 7.32TMC
• Height of dam above river bed : 38.40Mt
• Top width of dam :
• Length of dam :
» Gravity : 25.9Mt
» Composite : 134.45Mt
• Max. Flood discharge :
• Regulator sluices : 1.50mtx1.00mt(2No)(L&R)
• Main canal :

50
• Length of Main canal : 30.75 Km
» Distributaries : 26.40KM
» Sub distributaries :
• Water Allocation : 1.500TMC
• Water Utilization : 1500 Mcft

51
• Irrigation Potential:

SI. No. Year New Stablization

1 2014-15 - -
2 2015-16 1,500 -
3 2016-17 1,500 -
4 2017-18 3,000

• Budget Details :

Year Allocation Expenditure Incurred

2014-15 0.10 0
2015-16 1.00 0
2016-17 6.00 0
2017-18 10.00 2.20

52
Name of the Project : MATHADIVAGU PROJECT
Preamble:
• Mathadivagu project is an ongoing medium irrigation project constructed across Mathadi vagu
near Waddadi (v), Thamsi(m), Adilabad district. The site of reservoir is suitated near Waddadi
village at a distance of 10 Kms from Adilabad.
• The scheme is intended to irrigate an ayacut of 8,500 acres benefiting 12 villages in part of
Adilabad,Thamsi and Jainath mandals in Adilabad district. The project also provides drinking
water supply to 12,500 population in the en-route villages
The head works and canals are completed except for a railway crossing on distributor D14, which
is affecting an ayacut of 1600 acres. The required amount of Rs 125.00 Lakhs has already been
deposited with the railway authorities. The design and drawing re approved and work is to be
grounded by the railway authorities.An I.P of 6900 acres has been created.
Salient Features:
• Location : Waddadi (V), Thamsi (M), Adilabad.
• Latitude : 18° 40’ 57”
• Longitude : 78° 27’ 00”
• River/ Basin : mathadivagu / G7 of penuganga sub-basin.
• TBL : + 281.00 M
• FRL : + 277.50 M
53
• Max. Flood discharge : 0.695 Lakh Cusecs.
• Ayacut : 8500 Acres.
• Water allocation : 0.91 TMC
• I.P. Created : 6900 Ac
• I.P. utilized during last 3 years : 6000 Ac
• Water utilized during last 3 years : 0.370 TMC

54
• Irrigation Potential:

SI. No. Year New Stabilization

1 2014-15 - -
2 2015-16 - -
3 2016-17 1,600 -
4 2017-18 -

• Budget Details :

Year Allocation Expenditure Incurred

2014-15 0.50
2015-16 5.00 0.28
2016-17 8.00 0.00
2017-18 10.00 5.05

55
Name of the Project : GOLLAVAGU PROJECT
Preamble:
Gollavagu project is an ongoing medium irrigation project across gollavagu near
bheemaram village and jaipur mandal of adilabad district.. The scheme is intended to irrigate an
ayacut of 9500 acres in Adilabad district and is taken up under Engineering Procurement
Construction(EPC) system under Jalayagnam. The project is funded under Prime Minister’s
Package under Accelerated Irigation Benifit Programme. The project comprises construction of
earth bund, free over fall dam, head regulator, right main canal (lined) with cross masonry and
cross drainage works with distributory system. Administrative approval was accorded by the
Government vide G.O.Rt. No. 154, I & CAD (Irr. VII) Dept., dt. 24-01-2005 for Rs. 83.61 crores.

Salient Features:
• Location : Bheemaram (V), Jaipur (M), Adilabad.
• Latitude : 18° 52’ 32”
• Longitude : 79° 41’ 34”
• River/ Basin : Gollavagu / Godavari.
• Catchment area : 111.00 sq.km.
• Spillway details : non-gated.
Type : ogee type, H.C. Weir.

56
• TBL : + 157.50 M
• FRL : + 155.50 M
• MWL : + 157.50 M
• Crest level : + 155.50 M
• Top width of the bund : 6.00 M
• Maximum height of dam : 15.50 M
• Right main canal ( 26 kms ) : 9,500 acres. ( ayacut)
• Vent size & nos : 1.5 m x 1.7 m , 1 no.
• Sill level : + 148.00 M
• Max. Flood discharge : 903 cumecs..
• Ayacut : 9500 Acres.
• water allocation : 0.91 TMC
• I.P. Created : 6900 Acres.
• Gross capacity of the reservoir : 0.567 TMC.
• Live capacity : 0.545 TMC
• I.P. utilized during last 3 years : 6000 Acres.
• Water utilized during last 3 years : 0.370 TMC

57
• Irrigation Potential:

SI. No. Year New Stablization

1 2014-15 - -
2 2015-16 - -
3 2016-17 4,000 -
4 2017-18 -

• Budget Details :

Year Allocation Expenditure Incurred

2014-15 2.15 0.99


2015-16 3.25 0.66
2016-17 5.50 2.73
2017-18 18.00 2.65

58
RALIVAGU PROJECT

Preamble:
The project is located in Adilabad district to irrigate an ayacut of 6000 acres and is taken
up under Engineering Procurement Construction system under Jalayagnam. The project is
funded under Prime Minister's package under Accelerated Irrigation Benifit Programme. The
Project is completed in all respects except for ancillary works which are programmed for
completion by February 2010. The Project has been inaugurated by the Hon'ble Chief Minister on
23.2.2009 for part irrigation potential of 3000 acres.

Salient Features:
• Location : Mutkala (V), mancherial (M), Adilabad.
• Latitude : 18° 53’ 29”
• Longitude : 79° 22’ 30”
• River/ Basin : Ralivagu / Godavari.
• Catchment area : 131.36 sq.km.
• Ayacut : 6000 acres.
• Spillway details : un-gated.
• Type : H.C. Weir.
• TBL : + 155.50 M
• FRL : + 151.50 M 59
• MWL : + 153.30 M
• Crest level : + 151.50 M
• Top width of the bund : 6.00 M
• Length of the earth bund : 2.20 kms( completed)
• Canal details :
L.F. Canal
• Length of the Canal : 6.00 kms.
• Ayacut : 3,700 acres.
• Vent size & No : 1.2 m x 1.2 m, 1 no.
• Sill level : 144.00 m
• Discharge ( in Cumecs) : 0.912 cumecs.
R.F. Canal
• Length of the Canal : 5.00 kms.
• Ayacut : 2,300 Acres.
• Vent size & No : 1.2 m x 1.2 m, 1 No.
• Sill level : 144.00 m.
• Discharge ( in Cumecs ) : 0.503 Cumecs.
60
• Max. Flood Discharge : 940.7 Cumecs..
• Ayacut : 6000 Acres.
• Water allocation : 0.91 TMC
• I.P. Created : 6900 Acres.
• Gross storage capacity @ FRL : 0.408 TMC.
• Live capacity : 0.345 TMC

61
• Irrigation Potential:

SI. No. Year New Stablization

1 2014-15 - -
2 2015-16 - -
3 2016-17 980 -
4 2017-18 -

• Budget Details :

Year Allocation Expenditure Incurred

2014-15 1.00 0.36


2015-16 2.75 0.00
2016-17 2.50 0.00
2017-18 5.00 0.00

62
NILWAI PROJECT
Preamble:
• Nilwai project is under construction/ongoing medium irrigation project across Peddavagu near
Nilwai (v), Vempalli (m), Adilabad district. The scheme is intended to irrigate an ayacut of 13,000
acres in Adilabad district.

• The project is funded under Prime Minister's package under Accelerated Irrigation Benefit
Programme. The project comprises construction of earth bund, free over fall dam, head regulator,
right main canal (lined) with cross masonry and cross drainage works, left main canal (lined) with
cross masonry and cross drainage works, distributaries system with field channels.

• Administrative approval was accorded by the Government vide G.O.Rt. No. 125, I & CAD (Irr. VII)
Dept., dt. 22-01-2005 for Rs. 90.50 crores. The work was entrusted to M/s MVR-SOHAM (JV) for
original work under EPC turnkey contract system for a original contract value of Rs. 58.95 crores.
As the agency had abandoned the work, the site was taken possession under clause 61 of PS to
APSS. The tenders for balance work was invited under EPC system at IBM value of Rs. 52.28
Crores.

• Revised administrative approval vide G.O. Rt. No.156,I&CAD (PW-M&MI-T-IV) Dept. dt.
63
14.03.2012for rs. 138.27 crores.
• Irrigation Potential:

SI. No. Year New Stablization

1 2014-15 - -
2 2015-16 1,000 -
3 2016-17 500 -
4 2017-18 5,500

• Budget Details :

Year Allocation Expenditure Incurred

2014-15 10.00 5.23


2015-16 15.00 5.25
2016-17 15.00 2.35
2017-18 70.00 16.12

64
Name of the Project :PEDDAVAGU DIVERSION (JAGANNATHPUR) PROJECT)

Preamble:
• Peddavagu diversion scheme is under construction near Jagannathpur (V), Kaghaznagar (M),
Adilabad district. The scheme is intended to irrigate an ayacut of 15,000 acres in Adilabad district
and is taken up under Engineering Procurement Construction (EPC) under Jalayagnam. The
project is funded under Prime Minister's package under Accelerated Irriga- tion Benifit
Programme.The project comprises construction of left flank earth, construction of
anicut,construction of right flank head sluice, lining of right main canal. Administrative was
accorded by the Government vide G.O.Rt. No. 40, I & CAD (Irr. VII) Dept., dt. 11-01-2005 for Rs.
124.64 crores.

• The work was entrusted to M/s Gammon India Ltd., under EPC turnkey contract system for a
contract value of Rs. 118.90 crores.

Salient Features:

65
• Irrigation Potential:

SI. No. Year New Stabilization

1 2014-15 - -
2 2015-16 - -
3 2016-17 - -
4 2017-18 -

• Budget Details :

Year Allocation Expenditure Incurred

2014-15 13.00 3.09


2015-16 23.00 10.30
2016-17 30.00 14.01
2017-18 75.00 4.50

66
Name of the Project : SRI KOMARAMBHEEM PROJECT (PEDDAVAGU)

Preamble:
• Sri Komarambheem Project is under construction across near Ada (v), Asifabad (m), Adilabad
district. The scheme is intended to irrigate an ayacut of 24,500 acres in Adilabad district and is
taken up under Engineering Procurement Construction (EPC) system under Jalayagnam. The
project is funded under Prime Minister's package under Accelerated Irrigation Benifit Programme.
The spillway work was completed in all respects. The earth bund on flanks is completed and
gorge filling is now commenced. The canal excavation including lining is completed for a length of
about 34 km out of the total length of 65 km. The cross masonry and cross drainage works are in
progress.

• The work was entrusted to M/s Navayuga-Transtroy(JV)., under EPC turnkey contract system for
a contract value of Rs. 220.00 crores.

• Subsequently Government have accorded Administrative Approval vide G.O.Rt No.1630, I &
CAD (MED.Irr. II) Dept.,dt. 13-10-2009 for Rs. 176.00 crores to create additional irrigation
potential of 21,000 acres.

Salient Features: 67
• Irrigation Potential:

SI. No. Year New Stablization

1 2014-15 - -
2 2015-16 - -
3 2016-17 - -
4 2017-18 -

• Budget Details :

Year Allocation Expenditure Incurred

2014-15 25.00 25.75


2015-16 37.50 26.07
2016-17 60.00 70.54
2017-18 150.00 54.05

68
Name of the Project : PALEM VAGU PROJECT
Preamble:
• Palemvagu Project is under construction across Jellavagu near Mallapuram (v),
Venkatapuram(m), Khammam District. The scheme is intended to irrigate an ayacut of 10,132
acres benefitting 39 villages in Venkatapuram mandal of Khammam district. Administrative
approval was accorded by the Government vide G.O.Rt. No. 145, I & CAD (Irr. VII) Dept., dt.
22.01.05 for Rs. 70.99 crores.

• The work was entrusted to M/s ALS-KVR(JV) under EPC-Turnkey contract system for a contract
value of Rs. 47.9457 crores. Due to flash floods a breach occurred in Palemvagu project earth
dam on 04.08.2006 and on 04.08.2008. Government have constituted a Committee with
experts vide G.O. Rt. No. 1044, dt. 12.08.2008.

• The experts committee recommended for an additional gated spillway. Government vide
G.O.Rt.No.1211, I&CAD (Med.Irr.II) Dept., dt.05.10.2010 accorded permission for construction of
gated spillway in gorge portion of Palemvagu project for Rs. 81.16 crores.

Salient Features: 69
• Irrigation Potential:

SI. No. Year New Stablization

1 2014-15 - -
2 2015-16 - -
3 2016-17 - -
4 2017-18 -

• Budget Details :

Year Allocation Expenditure Incurred

2014-15 1.00 7.56


2015-16 5.00 0.00
2016-17 5.00 4.00
2017-18 30.00 1.45

70
Name of the Project : MODIKUNTAVAGU PROJECT
Preamble:
• Modikuntavagu project is proposed across Modikuntavagu near Krishnapuram (v), Wazeedu (m),
Khammam district, proposed to provide irrigation facilities to an extent of 13,591 acres benefitting
35 villages in Wazeedu (m) of Khammam district. Provides drinking water facility to the enroute
35 villages for a population of 12,000 in Wazeedu (M) of Khammam District.

• Administrative approval accorded by Government vide G.O MS No. 64, I & CAD Dept., dated.
25.05.2005 for Rs.124.60 crores. The scheme work was entrusted to M/s Gammon India
Ltd., Mumbai under EPC turnkey system for an amount of Rs.118.95 crores.

Salient Features:

71
• Irrigation Potential:

SI. No. Year New Stablization

1 2014-15 - -
2 2015-16 - -
3 2016-17 - -
4 2017-18 -

• Budget Details :

Year Allocation Expenditure Incurred

2014-15 0.2 12.12


2015-16 5.00 0
2016-17
2017-18 50.00 0.00

72
KRISHNA BASIN

73
Rajiv Bheema Lift Irrigation Scheme
Preamble:
• Rajiv Bheema Lift Irrigation Scheme envisages lifting of water from river Krishna with two
independent lifts (ie) Lift-I and Lift-II with two stage pumping under each lift. Lift 1
contemplates lifting of water from foreshore of Priyadarshni Jurala Project and Lift 2
contemplates lifting water from Ookachettivagu Project Reservoir. The project contemplates
to irrigate 2.03 lakh acres (new ayacut) and 4,000 acres for stabilisation.

• The Project on the up stream side is Priyadarshini Jurala project and on the down stream
side of the Neelam Sanjeevareddy Sagar Project (completed).

• This project is also envisages for allocation of drinking water (0.408 TMC) to cover

• 196 villages in 11 Mandals benefiting 1.5 lakh people. The water allocation for this project is

• 19.916 Thousand million cubic feet (TMC) by way of saving from Krishna Delta due to
modernisation.

74
Salient Features:
• Location :
• Regumangedda near Yellur (Village) :
• Kollapur (Mandal) :
• River :
• Krishna
• Nearest Town :
• Mahabubnagar (75 km)
• Stage - I :
• Panchadevpad (Village), Atmakur (Mandal)
• Stage - II :
• Ramanpad (Village), Wanaparthi (Mandal)
• Villages benefitted :
• 196 nos
• Mandals benefitted :
• 11 nos
75
• Irrigation Potential:

SI. No. Year New Stabilized

1 2014-15 -- --
2 2015-16 21000 --
3 2016-17 107000 --
4 2017-18 60000 --

• Budget Details :

Year Allocation(Crores) Expenditure Incurred


(Crores)

2014-15 95.00 35.72

2015-16 160.00 65.91

2016-17 125.00 107.58

2017-18 202.00 62.06 76


The Jawahar Nettempadu Lift Irrigation Scheme
Preamble:
The Jawahar Nettempadu Lift Irrigation Scheme envisages creation of Irrigation Potential and
drinking water facilities for drought prone areas of Mahaboobnagar district, by lifting water
from Krishna river from the foreshore of Priyadarshini Jurala project on the right flank near
Upperu (Village), Dharur (Mandal) to an extent of 2 lakh acres in total by utilising 21.425
TMC. The 1st phase is proposed to cover an ayacut of 27,000 acres only.
Salient Features:
• Phase - I
• Location : Stage - I. near Upperu (Vil), Dharoor(M)
• foreshore of Jurala Riservoir : Stage-II, Near Marlabeedu (vil), Dharoor(M)
• Latitude : 16° 17' 0'' N
• Longitude : 77° 38' 00" E
• River : Krishna
• Estimate cost : Rs. 13,430 lakhs (2000-01)

77
• Pump House : Foreshore of Priyadarshini Jurala project near Upperu village
• Lifts Lift - I Lift - II
Height : 63.50 m 76.00 m
No. of. Pumps : 4 Nos. 3 Nos.

Total Pums Capacity : 68 Mega Watts 51 Mega Watts


• Total Power Requirment : 119 Mega Watts
• Storage Reservoirs : Capacity In Thousand million cubic feet
• a) Nagar Doddi : 0.692
• B)Chinnonpally : 1.539
• C)Sangala : 0.622
• D)Tatikunta : 1.451
• E)Muchonpally : 1.634

78
• Irrigation Potential:

SI. No. Year New Stabilized

1 2014-15 -- --
2 2015-16 23700 --
3 2016-17 94000 --
4 2017-18 22000 --

• Budget Details :

Year Allocation(Crores) Expenditure Incurred


(Crores)

2014-15 80.00 104.05

2015-16 249.00 62.68

2016-17 125.00 119.53

2017-18 235.00 48.96 79


MAHATMA GANDHI KALWAKURTHI LIFT IRRIGATION SCHEME
Preamble:
• The Scheme is proposed to lift 25Thousand million cubic feet (TMC) of water from the
foreshore of Srisailam Reservoir in 3 stages to provide irrigation to 2.5 lakh acres and drinking
water facility to the chronically drought prone upland areas in Mahabubnagar District.
• The scheme consist of locating 4 balancing reservoirs at (i) Yellur (ii) Singotam (iii)
Jonnalaboguda and (iv) Gudipally Gattu.
• Salient features
• Location : Regumanigadda of Yellur (V) Kollapur (M)
• River : Krishna
• Nearest Town : Kollapur (12 km)
• Adminstrative Sanction : Rs. 2990 crores
• Villages benifitted : 303 nos
• Mandals benifited : 19 nos
• HP pumps Stage I (Foreshore of Srisailam Reservoir) : 5 nos of 30 Mega Watts
• Stage II (Jonnalaboguda Balancing Reservoir) : 5 nos of 30 Mega Watts
• Stage III (Gudipally Gattu Balancing Reservoir) : 5 nos of 30 Mega Watts

80
Salient features
• Salient features
• Location : Regumanigadda of Yellur (V) Kollapur (M)
• River : Krishna
• Nearest Town : Kollapur (12 km)
• Adminstrative Sanction : Rs. 2990 crores
• Villages benifitted : 303 nos
• Mandals benifited : 19 nos

• HP pumps Stage I (Foreshore of Srisailam Reservoir) : 5 nos of 30 Mega Watts


• Stage II (Jonnalaboguda Balancing Reservoir) : 5 nos of 30 Mega Watts
• Stage III (Gudipally Gattu Balancing Reservoir) : 5 nos of 30 Mega Watts

81
• Irrigation Potential:

SI. No. Year New Stabilized

1 2014-15 -- --
2 2015-16 147000 --
3 2016-17 -- --
4 2017-18 99864 --

• Budget Details :

Year Allocation(Crores) Expenditure Incurred


(Crores)
2014-15 120.00 104.42
2015-16 225.00 128.45
2016-17 300.00 410.44
2017-18 1001.00 244.89
82
NAGARJUNA SAGAR PROJECT
Preamble:
• The multipurpose Nagarjunasagar Project (NSP) on the river Krishna, near the then
Nandikonda Village, Peddavoora Mandal, Nalgonda District, is the pride of Andhra Pradesh.
It is one of the modern temples of Independent India. This is the largest and highest masonry
dam in the world. The Project was inaugurated by (Late) Pundit Jawaharlal Nehru, the then
Prime Minister of India on the 10th December 1955. The water was let into both the two main
canals i.e. right main canal (Jawahar Canal), left main canal (Lalbahadur Canal) by the late
Prime Minister Smt. Indira Gandhi on the 4th August 1967.
Salient features
(a)Location : Nandikonda (Village) Peddavoora (Mandal), Nalgonda (District)
(b)Hydrology
Catchment area : 2.15 lakh sq km
Maximum observed flood : 10.61 lakh cusecs (on 7th October 1903)at Vijayawada
© Reservoir
Reservoir Capacity : Gross : 408 thousand million cubic feet
Water spread area at FRL : 285 sq km
83
(d) Masonry Dam
Spill way of Dam : 471 meters
Non-over flow Dam : 979 meters
Masonry Dam : 1450 meters
Maximum height of Dam : 125 meters
above deepest foundation
(e) Earth Dam
(f) Total Length of Earth Dam : Maximum height :
• Power Generation
• Power Units : 3414 meters
• 26 meters 1 number conventional
• (110 Mega watts capacity)
(g) Canal Power House 7 nos Reversible (100 Mega watts capacity)
• Right side : 3 units 30 Mega watts (each)
• Left side : 2 units 30 Mega watts (each)

84
• Irrigation Potential:

SI. No. Year New Stabilized

1 2014-15 -- --
2 2015-16 -- --
3 2016-17 -- --
4 2017-18 -- --

• Budget Details :

Year Allocation(Crores) Expenditure Incurred


(Crores)

2014-15 25.00 24.49

2015-16 25.00 34.40

2016-17 138.05 116.14

2017-18 191.20 103.88 85


ALIMINETI MADHAVA REDDY SRISAILAM LEFT BANK CANAL
PROJECT
Preamble:
• The Alimineti Madhava Reddy Srisailam Left Bank Canal Project (AMRP) was started in 1983
to provide irrigation facilities in the drought prone areas of Nalgonda District for 3 lakh acre
Irrigated Dry (ID), besides supplying drinking water to the fluoride affected villages enroute,
utilizing 30 Thousand million cubic feet of Krishna Water. This scheme has two alternatives.
• 1. Gravity scheme from foreshore of Srisailam reservoir, through two tunnels.
• 2. Lift scheme from foreshore of Nagarjuna Sagar Reservoir.
• The works on main canal from common point (i.e., km 25.00) were taken up during 1983-84,
pending finalization of Head Works.
• In April, 1995, the Government decided to take up lift scheme from the foreshore of
Nagarjuna Sagar reservoir, to achieve early benefits, as the tunnel scheme would require 7
to 8 years time for its completion. Accordingly lift scheme works are taken up and completed.
• The Government in 2004 decided to take up tunnel scheme as a permanent solution and
accorded approval for tunnel scheme for Rs 2,813.00 crore in 8/2005.
• The Government have also approved a lift irrigation scheme from foreshore of
Udayasamudram balancing reservoir, for Rs 699.00 crore in 6/2007 to irrigate an additional
ayacut of 1.00 lakh acre.

86
Salient features
• Details Tunnel-1 Tunnel-2
• Length of Tunnel : 43,900 meters 7,120 meters
• Shape of Tunnel : Circular Horse shoe
• Finished Diameter : 9.20 meters 43.90 kms
• Tunnel Length8.758 meters7.12 kms
• Carrying capacity : 113.28 Cumecs 113.28 Cumecs
i.e. 4000 Cusecs i.e. 4000 Cusecs
• Surface fall : 1 in 32001 in 2870
• Velocity : 1.951 mtrs /sec2.03 mtrs/sec
• Invert Level at tunnel entry : 251.351 meters233.49 meters
• Exit level of tunnel237.762 meters230.965meters
• Minimum draw down level of Srisailam
• Reservoir for head regulator of SLBC : 260.30 meters
• FRL Dindi balancing reservoir :

87
• Irrigation Potential:

SI. No. Year New Stabilized

1 2014-15 -- --
2 2015-16 -- --
3 2016-17 63251 --
4 2017-18 -- --

• Budget Details :

Year Allocation(Crores) Expenditure Incurred


(Crores)

2014-15 325.00 473.04

2015-16 600.00 592.05

2016-17 1421.43 514.45

2017-18 900.00 439.75 88


KOIL SAGAR LIFT IRRIGATION SCHEME

Preamble:
• Koilsagar lift Irrigation Scheme is constructed in 1955 to irrigate an ayacut of 4,856 hectares
(12,000 acres) in Amarchintha constituency of Mahabubnagar district. Due to failure of
monsoon in catchments during the past several years only 1821 hectares (4500 acres) were
irrigated under this project.

• By implementing sprinkler irrigation system for Irrigated dry (I.D) crops, the project proposes
to stabilize a total ayacut of 4,856 hectares(12000 acres), apart from creating new ayacut of
15480 hectares (38,250 acres) totaling 20336 hectares (50,250 acres). The Government
have accorded Administrative sanction vide G.O.Rt.No. 1658, Dt.15.11.2005 for Rs.359.00
crores

• It is proposed to lift 3.90 thousand million cubic feet of Water already allocated by the
Krishna Water Tribunal to Koilsagar lift irrigation scheme from the foreshore of Priyadarshini
Jurala Project reservoir in two stages to a total height of 118 meters.

89
Salient features :
• Location
• Lift-I : Chintareddy Palli (V) Narwa (M)
• Lift-II : Teeleru (V) Dhanwada (M)
• Source : River Krishna
• Water utilization : 3.90 thousand million cubic feet
• Ayacut : 50,250 acres
• Nearest town : Mahaboobnagar (40 Kms)
• Villages benefitted : 72 Nos.
• Mandal benefitted : 6 Nos.
• Number of lifts : 2 Nos.
Lift-I Lift-II
Stage – I Stage - II
• a) Height of lift :58.00 Mmeters60.00 meters
• b) No. of Pumps :2 Nos.2 Nos.
• c) Capacity of each Pump :7.5 Mega watts7.5 Mega watts
• d) Total Discharge :630 cusecs630 cusecs
90
• e) Power required :30 Mega watts
• Irrigation Potential:

SI. No. Year New Stabilized

1 2014-15 -- --
2 2015-16 -- 12000
3 2016-17 8000 --
4 2017-18 30250 --

• Budget Details :

Year Allocation(Crores) Expenditure Incurred


(Crores)

2014-15 25.00 6.19

2015-16 24.00 4.53

2016-17 59.72 61.61

2017-18 198.36 11.52 91


DINDI LIFT IRRIGATION SCHEME
Preamble:

• The dindi lift irrigation scheme envisages to provide irrigation and drinking water to the most
severely affected areas by flouride and the drought prone areas in three districts nalgonda,
bhongiri, and nagar kurnool covering 2 constituencies in each district, 18 mandals, and 199
villages by lifting 30 TMC of flood water from the foreshore of srisailam reservoir to existing
dindi project at 0.5 TMC per day for 60 days filling 5 new reservoirs with gross capacity
21.213 TMC.

• The government have accorded administrative approval to the dindi lift irrgation scheme for
an amount of rs. 6190 crores vide GO MS No. 107, I&CAD (Project-I) Dept Dated.
11.06.2015, to irrigate an ayacut of 3.41 lakh acres, in two mandals of nagar kurnool district
and 15 mandals of nalgonda district and one mandal in yadadri bhuvanagiri district. Detailed
surveys for main canal have been conducted by engineering staff college of india (ESCI).

92
• Irrigation Potential:

SI. No. Year New Stabilized

1 2014-15 -- --
2 2015-16 -- --
3 2016-17 -- --
4 2017-18 -- --

• Budget Details :

Year Allocation(Crores) Expenditure Incurred


(Crores)

2014-15 -- --

2015-16 -- --

2016-17 -- 94.59

2017-18 500.00 106.58 93


PALAMUR RANGA REDDY LIFT IRRIGATION
SCHEME
Preamble:
• Palamuru-Rangareddy L.I. Scheme is envisaged to provide drinking water to enroute 1428
villages in 76 mandals , Hyderabad city and water for industrial use in Nagarkurnool,
Wanaparthy, Mahabubnagar, Vikarabad, Rangareddy and Nalgonda Districts in 1st phase.
• To provide irrigation facilities for 10.00 Lakh acres in upland areas and proposed to enhance
to 12.30 Lakh Aces in Nagarkurnool, Wanaparthy, Mahabubnagar, Vikarabad, Rangareddy
and Nalgonda Districts.
• Drawing 90 TMC of flood water in 60 days from foreshore of Srisailam Reservoir on Krishna
River.
• The water is lifted in Five Stages through Pumping Stations from +240.00M from foreshore
of Srisailam Reservoir at Yellur (V), Kollapur (M) to the elevation of +670.00M at K.P.
Lakshmidevipalli (V), Kondurg (M), near Shadnagar Town.

94
• Irrigation Potential:

SI. No. Year New Stabilized

1 2014-15 -- --
2 2015-16 -- --
3 2016-17 -- --
4 2017-18 -- --

• Budget Details :

Year Allocation(Crores) Expenditure Incurred


(Crores)

2014-15 -- 4.56

2015-16 100.00 5.72

2016-17 -- --

2017-18 4029.00 1182.42 95


MUSI PROJECT
Preamble:
• The music Project was constructed across the Musi River, which is a tributary to the Krishna
River. The project is located near the Bopparam Village, Kethepally Mandal. Nalgonda
District to irrigate a total ayacut of 31,429 acres (29,742 acres ID and 1687 acres wet in
Rabi) in the district of Nalgonda and provides Drinking water to Suryapet town Municipality of
Suryapet Mandal in Nalgonda District.

96
• Irrigation Potential:

SI. No. Year New Stabilised

1 2014-15 -- --
2 2015-16 -- --
3 2016-17 -- --
4 2017-18 -- --

• Budget Details :

Year Allocation(Crores) Expenditure Incurred


(Crores)

2014-15 3.00 0.25

2015-16 3.00 0.00

2016-17 4.00 0.00

2017-18 30..00 0.13 97


98
Kaleshwaram Project
 Kaleshwaram is a multipurpose project providing 40 TMC drinking water, 16 TMC
Industrial water and to cater for 18,25,700 Acres New Ayacut and 18,83,000 Acres
Stabilisation benefiting Karimnagar, Sirisclla, Siddipet, Medak, Yadadri, Nalgonda,
Sangareddy, Nizamabad, Jagtial, Kamareddy, Nirmal, Medchal & Peddapally
Districts.
 Principal components
• 3 Barrages on River Godavari at Medigadda, Annaram & Sundilla
Pump houses : 3 nos
• Approach & Link canal : 40.9 Km, Tunnel length : 155 , Pressure main :122 km,
Gravity canal : 657 km
• Total Power Required : 4627 MW and 13558 MU
• No of Reservoir : 19 nos, Total Storage Capacity: 141 TMC
• Estimated Cost : Rs 80,500 Crores
 It is programmed to feed Mid Manair Reservoir with Godavari water through
Kaleshwaram Project by June, 2018 and provide partial benefits of the project by
stabilizing the ayacut under existing projects. 99
Kaleshwaram Project
Medigedda Pump House Annaram Pump House

Sundilla Pump House

100
PALAMURU – RANGAREDDY L.I. SCHEME
 Palamuru-Rangareddy L.I. Scheme is envisaged to provide drinking water to enroute
1428 villages in 76 mandals , Hyderabad city and water for industrial use in
Nagarkurnool, Wanaparthy, Mahabubnagar, Vikarabad, Rangareddy and Nalgonda
Districts in 1st phase.

 To provide irrigation facilities for 10.00 Lakh acres in upland areas and proposed to
enhance to 12.30 Lakh Aces in Nagarkurnool, Wanaparthy, Mahabubnagar,
Vikarabad, Rangareddy and Nalgonda Districts.

 Drawing 90 TMC of flood water in 60 days from foreshore of Srisailam Reservoir on


Krishna River.

 The water is lifted in Five Stages through Pumping Stations from +240.00M from
foreshore of Srisailam Reservoir at Yellur (V), Kollapur (M) to the elevation of
+670.00M at K.P. Lakshmidevipalli (V), Kondurg (M), near Shadnagar Town.

101
PLANNING FOR MISSION KAKATIYA

▪ Identification and phasing of tanks for rehabilitation.

▪ Gramsabhas and rural local body meetings conducted.

▪ Capacity building of technical staff.

▪ Construction and Quality control & quality assurance


guidelines standardized.

▪ State level and District level committees constituted for inter


departmental coordination

102
WORKS PROPOSED UNDER MISSION KAKATIYA

▪ De-silting

▪ Restoration of Feeder Channels

▪ Re-sectioning of Irrigation Channels

▪ Repairs to cross masonry and cross drainage


structures.

▪ Repairs to Bund , Weir & Sluices

▪ Raising of Full Tank Level, wherever possible to


increase tank capacity.

103
MISSION KAKATIYA AT A GLANCE

 Total identified water bodies under Minor Irrigation are 46,531.

 All M.I Sources are programmed to be Restored under Mission


Kakatiya in 5 Phases.

 So far 25,964 no. of water bodies have been taken up


in four phases for an amount of Rs. 8,270 Cr. for restoring an
ayacut of 20.00 Lakh Acres.

 So 16,584 tanks are restored with an expenditure of


Rs. 3,000 Cr.

 Further Rs. 2,000 cr. are required for completion of sanctioned


works in the financial year 2018-19
104
OUTCOMES OF MISSION KAKATIYA

• So far with the public participation 2324 Lakhs cubic meters of silt has been removed from
25964 Tanks resulting in a saving of 900 Cr. To the Government.
• The overall water storage capacity restored by around 8.25 TMC so far.
• The Ayacut stabilized so far due to restoration of 16584 Tanks is around 12 Lakh Acres
resulting in increased Agriculture Production.
• 27 Crores of Fingerlings Dropped In 3939 Tanks resulting in approximate production
of 85, 000 tonnes of fish accruing an income of 480 Cr to the fisherman community during
the year 2016-17.
• Toddy Tappers To Get More Income Through Plantation On Tank Bunds and along the
periphery of the tanks (Eetha Planted 20 Lakhs On 8 Thousand Bunds).
• Increased the availability of Drinking water for livestock during Summer.
• One tank in each Assembly Constituency is taken up & developed as Mini Tank Bund for
providing Aesthetic space to the rural population and for promoting Cultural, Traditional
105
& Tourist Activities.
DESILTING

Before

During

After

106
TANK BUND

After

Strengthening of bunds affected by jungle growth , erosion, scouring of slopes,


gully formation on slopes, damaged stone revetment, and seepages through bund.
107