Networking of IT Parks

07.07.2008
Networking of IT Parks

It would include the complete project development related to networking including


WAN setup and LAN setup of the IT companies in the IT Park. The process flow for
networking set up implementation is given below.

1.Requirements of Customer
2.Study of requirement and suggestion for changes if needed.
3.Preparation of Design Diagram of networking i.e. WAN and LAN Set up
4.Bill of materials required for setup
5. Proposal submission to the company
6.Implementation of network with Configuration of Devices
7.Testing of Network
8.Acceptance of Network by customers
9.Payment from Customer
10.Post implementation maintenance
I) Application form describing Requirements of Customer :

We have to collect requirements of customer for setting up new WAN and LAN set up

1. Organization Name & address:


2. Contact Persons: Management, Technical, Accounts
3. Office Area: in sq.ft.
4. Number of Employees
5. Network Requirements
i) IPLC /Leased Line /Broadband /VPN : Wireline / Wireless Connectivity
ii) Capacity of each
iii) Server Room requirements
iv) LAN requirements: number of computers in wireline / Wireless Connectivity
II) Feasibility Study of requirement and suggestion for changes if needed :

1. Feasibility Study for WAN/Lease Line Connectivity and suggestion of


appropriate ISP’s for bandwidth

2. Study of requirement of Mux, Racks, Modems, Routers, Firewall, Switches,


Servers and computers and structured cabling with their detailed specifications.

3. Study of single point failures


III Design of Network :

It covers Building Diagram, Entire Network Diagram including Server Room,


Hardware Information with detail specification.
The following items and their specification need to be considered during
designing WAN, Server room and LAN.
Design of WAN :
Modems as per bandwidth requirement
Requirement of MUX
Back up Connectivity from different ISP’s
Requirement of Router
Design of Server Room:
False Flooring
UPS backup requirement
AC requirement
Access Control System
Space requirement for MUX and Racks
Structured cabling requirements i.e. patch panel and patch cords
Networking Equipments
Type of Servers
Type of Racks
Type of Firewall
Type of Routers & Switches
Design of LAN:
Type of Topology
Type of machines required
IV) Bill of Materials :

We have to prepare sheet containing Item description, Make of Item, Unit Rate,
Quantity of Items Required and Total Amount of Items.
Racks
Modems
Routers
Patch Panel
Switches
Servers
Computers
Fibre/CAT-6 UTP Components : Wall mount Box, I/O Cat-6,Cable Cat-6,
Patch Cord Cat-6,Casing
Firewall : Hardware/Software
V Proposal submission :

Preparation of detailed proposal :

Design Diagram

Bill of materials

Contract terms and obligations and liabilities

Commercial terms

Approval from Director


VI Implementation :

Configuration of all devices

Installation of equipments as per design


VII Network Testing :

Testing of WAN Components : as per the testing parameter designed by STPI

Testing of Server Room Equipments

Testing of LAN components

Prepare Test Report


VIII Acceptance of Network :

Prepare acceptance form for particular network and attach test report to it.

Acceptance from customer


IX Payment :

Verification of Invoice by Technical Person before sending it to the customer.


X Escalation Chart :

Provide escalation chart

Preventive maintenance of network: Prepare Report Sheet after preventive


maintenance service

Trouble Calls : Prepare Report sheet after attending trouble calls