Transportation and Routes

• Two parts arriving at the machines to be processed, Part A = 12 min


and Part B = 15 min. The part are assigned in sequence to a machine
to be processed see below table,
Part A Part B
Turing 5 6
Milling 10 8
Paint 8 12

• Then the parts are routed to the correct station and are processed
with the same assigned process times. Once the processing times has
completed, the parts are then routed to the next station that will
accept all finished goods. Eventually disposed.
A ssign time and Turn Station Turning P rocess Route 3
P art 1 A rrical Route part 1
sequence 1
0 0

Mil Station Milling P rocess Route 4

0
P art 2 A rrival A ssign time and Route part 2
sequence 2
0
Paint Station P aint P rocess Route 5

Finished
Dispose 1
Products
0