MEP Design Review

KIS Philosophy and Goals of Energy Efficiency, Operational Safety, Long Life of
Systems and Equipment with Minimal Maintenance Requirements
Mechanical Systems
 Building Heating and Ventilation
 Office HVAC
 Independent HVAC systems for ISD Areas
 Computer Room Redundant HVAC with Front Aisle Supply and Rear Aisle Exhaust

Electrical Systems
 5KV Incoming Service from RK-65D
 Building Distribution One-Line Diagram
 Interior and Exterior Lighting and Control Systems
 350 KW Diesel Emergency Generator
 UPS System
 Fire Alarm system
 Voice and Data Provisions
 CCTV and Access Control

Plumbing Systems
 #2 Fuel Oil Utilized with Capability to Convert to Natural Gas
 Hot Water Heating
 Bathrooms and Kitchens
 Interior and Exterior Hose Bibbs