You are on page 1of 13

BANGALORE INSTITUTE OF TECHNOLOGY

Department of Mechanical Engineering

DESIGN AND FABRICATION OF HAND


OPERATED PENDULUM PUMP
Internal Guide:
Dr. B Gurudatt
Professor
Department of Mechanical Engineering
Bangalore Institute of Technology, Bangalore

Team Members:
1. Akash Sathish Shastri - 1BI14ME014
2. Chowda Reddy M Y - 1BI14ME040
3. Dileep Yadav K R - 1BI14ME045
4. Kaushik M D - 1BI14ME063
VIII SEMESTER B.E.
MECHANICAL ENGINEERING PROJECT BATCH NO:13
BATCH – 2014 - 2018
BANGALORE INSTITUTE OF TECHNOLOGY
Department of Mechanical Engineering

CONTENTS :

1. 3D Model
2. 2D Draft
3. Components of Pendulum pump
4. Cost summary
5. Calculations
6. Fabrication process
7. Finished model of power weeder
8. Conclusion

VIII SEMESTER B.E.


MECHANICAL ENGINEERING PROJECT BATCH NO:13
BATCH – 2014 - 2018
BANGALORE INSTITUTE OF TECHNOLOGY
Department of Mechanical Engineering

3D MODEL

VIII SEMESTER B.E.


MECHANICAL ENGINEERING PROJECT BATCH NO:13
BATCH – 2014 - 2018
BANGALORE INSTITUTE OF TECHNOLOGY
Department of Mechanical Engineering

2D DRAFT

VIII SEMESTER B.E.


MECHANICAL ENGINEERING PROJECT BATCH NO:13
BATCH – 2014 - 2018
BANGALORE INSTITUTE OF TECHNOLOGY
Department of Mechanical Engineering

VIII SEMESTER B.E.


MECHANICAL ENGINEERING PROJECT BATCH NO:13
BATCH – 2014 - 2018
BANGALORE INSTITUTE OF TECHNOLOGY
Department of Mechanical Engineering
Components of pendulum pump
Table 1: Brought out items

Sl.No Particulars Quantity Material

1 Reciprocating Pump 1 Cast Iron

2 Bearing 2 Case Hardened Steel

3 Non Return valve 1 Brass

4 Clamps 3 -

5 Hose pipes 2 -

6 Connectors 2 -
VIII SEMESTER B.E.
MECHANICAL ENGINEERING PROJECT BATCH NO:13
BATCH – 2014 - 2018
BANGALORE INSTITUTE OF TECHNOLOGY
Department of Mechanical Engineering

COST SUMMARY

Table 2: Cost Summary

Sl.No Particulars Cost (Rs)

1 Brought out items 1,500 /-

2 Raw material cost 1,000 /-

3 Fabrication 3,500 /-

Total 6,000 /-

VIII SEMESTER B.E.


MECHANICAL ENGINEERING PROJECT BATCH NO:13
BATCH – 2014 - 2018
BANGALORE INSTITUTE OF TECHNOLOGY
Department of Mechanical Engineering

SPECIFICATIONS:

1. Pump specification

i. Bore diameter (D) = 9.525 cm


ii. Stroke length (L) = 16.51 cm

2.Mathematical Calculations

i. Area of the cylinder = 0.0071255 m2


ii. Volume of cylinder (V) = Area*stroke length = 0.0071255*0.1651= 1.17643 x 10-3 m3
iii. Weight of water per stroke = 9810*1.17643*10-3 = 11.5368 N

VIII SEMESTER B.E.


MECHANICAL ENGINEERING PROJECT BATCH NO:13
BATCH – 2014 - 2018
BANGALORE INSTITUTE OF TECHNOLOGY
Department of Mechanical Engineering
FABRICATION PROCESS:

Operations Performed

 Cutting – Metal cutting is the process of removing material from the work piece using
a cutting tool.

 Drilling - Drilling is a machining process that uses a drill bit to cut a hole of circular
cross-section in solid materials.

 Welding - Welding is a materials joining process which produces coalescence of


materials by heating them to suitable temperatures.

 Grinding - Grinding is an abrasive machining process that uses a grinding wheel for
tool sharpening.

VIII SEMESTER B.E.


MECHANICAL ENGINEERING PROJECT BATCH NO:13
BATCH – 2014 - 2018
BANGALORE INSTITUTE OF TECHNOLOGY
Department of Mechanical Engineering

VIII SEMESTER B.E.


MECHANICAL ENGINEERING PROJECT BATCH NO:13
BATCH – 2014 - 2018
BANGALORE INSTITUTE OF TECHNOLOGY
Department of Mechanical Engineering
FINISHED MODEL

VIII SEMESTER B.E.


MECHANICAL ENGINEERING PROJECT BATCH NO:13
BATCH – 2014 - 2018
BANGALORE INSTITUTE OF TECHNOLOGY
Department of Mechanical Engineering

CONCLUSION:

1. On increasing the mass of pendulum, discharge of the given pendulum system increases.

2. On increasing the angle of swing, the discharge of the given pendulum system increases.

3. It was concluded that human effort is considerably reduced while pumping water by a
pendulum operated pump compared to a regular pump.

4. Simply designed and developed the structure for pumping water using pendulum
principle.

5. Getting continuous flow of water through pump.

VIII SEMESTER B.E.


MECHANICAL ENGINEERING PROJECT BATCH NO:13
BATCH – 2014 - 2018
BANGALORE INSTITUTE OF TECHNOLOGY
Department of Mechanical Engineering

THANK YOU

VIII SEMESTER B.E.


MECHANICAL ENGINEERING PROJECT BATCH NO:13
BATCH – 2014 - 2018

You might also like