You are on page 1of 32

PLTMG 30MW

Floating LNG Power Plant

Seram Island

1
KORINA
KORINA PROFESIONAL PARTNER
GROUP
GROUP

Executive Summary of Proposal


Preface / Introduction?? (letter of intent)

Why join with Korina? Additional advantage of drinking water supply.

@ Pengembangan Bisnis Korina Group 2019


Project Summary(1/2)

Project Developer : KORINA GROUP

End User : Shrimp Farm

Location : Seram Island

Project/Business Scheme :

Power Capacity : 30 MW (2+1 Base), Additional option for 40MW (Separate BMPP)

Type of Plant : Barge Mounted Power Plant (BMPP)

Delivery Term : 15 month after contract

Generator Type : MAN 14V 51/60DF or Equivalent

Scope of Supply : LNG Sourcing / Transportation / Receiving Storage / Re-gas / Power Supply

3
Project Summary(2/2)
Why BMPP?

● Possible to relocate and flexibly use the space.


(Easy to expand the capacity by constructing the additional BMPP)
● Does not require a large site scale.

● Flexibly use depend on various environment.


(Compliance with strict environmental standards)

● Short EPC period.

● Solution for remote areas (Small Island and place)

Additional Merit

● Using Cold Energy of LNG in the Cold Storage of Shrimp, and reducing the cost of operation
● Generating Fresh Water based on sea water to solve the water shortage problem

4
Location Information

Bontang

Seram
Island

LNG Source : Bontang Terminal


Transfer Method : Middle Scale LNGC
5
Project Status

 KORINA Group intends to build BMPP(Barge Mounted Power Plant) to supply


stable and economical power supply to Shrimp Farm in Seram Island.

 BMPP is designed to use Duel Fuel Engine and it will takes 15month of construction
time to produce electricity to customer.

 LNG is planned to be supply from Bontang Terminal, and Mini LNGC will be used to
transport LNG from Bontang to BMPP.

6
LNG Transportation Scenario(1/1)
√ LNG Supply Route
Route Bontang – Seram Island

Bontang LNG Loading Spot : Bontang, East Kalimantan

Storage Capacity Total 8,500 m3 (Type-C Tank)

√ Operating Condition
Vessel Speed NCR Base , 15 Kn
Means of
LNG Fuelled Ship
Transport

Seram √ Round Trip


Island
Distance Abt. 1,800 km
Loading-
1.5 day
Unloading
Sea Days 30 days, round trip, 10% sea margin

Voyage Days 28 days

Vessel Quantity One Vessel (Membrane NO96. PGN)

Cargo Tank Cap. TBD

7
LNG Property

The performance of the generator according to the MN applied in the above table. Need to be confirmed by generator supplier.

8
Generator Specification (1/3)

9
Generator Specification (2/3)
Planning Data – Gas Mode

10
Generator Specification (3/3)
Planning Data – Liquid Mode

11
Fuel Analysis (1/2)
Gas Consumption

12
Fuel Analysis (2/2)
Pilot Oil Consumption

13
BMPP Layout (1/4)
General Arrangement Concept

Principal Dimension
LOA : approx. 113.0m
Breadth (MLD.) : approx. 35.0m
Depth (MLD.) : approx. 8m
Operating Draught (MLD.) : 4.9m

4,250 M3
LNG S/T

Fuel Storage & Supply Part Generating Part Control Part

14
BMPP Layout (2/4)
General Arrangement Concept

Principal Dimension
LOA : approx. 113.0m
Breadth (MLD.) : approx. 35.0m
Depth (MLD.) : approx. 8m
Operating Draught (MLD.) : 4.9m

15
BMPP Layout (3/4)
Generating Factory Concept

16
Fuel Gas Supply Concept (1/3)
LNG Fuel Tank – Type C Cylindrical (8,500㎥)
Technical Specification
Applied Code ASME SEC, Vlll DIV.1

Gross Volume (㎥) Abt. 4,250 / set

Net Volume (㎥) Abt. 3,820 / set

Quantity Two

Design Pressure (barG) 3

Fluid LNG

Temperature (℃) -163

Insulation Type PUF

Insulation Thickness (mm) 320

PWHT N/A

Main Material 9% Ni

17
Fuel Gas Supply Concept (2/3)
General Drawing

18
Fuel Gas Supply Concept (3/3)
Process Flow

19
Fuel Gas Supply System
FGSS Control & Safety System

20
Master Schedule

21
Fresh Water Generator
Option for Customer

Utilization of LNG Cold Energy

22
Master Schedule
Electric Power and Water Shortage of Islands

1) Most of the islands of Indonesia have been suffered from shortage of the electric power and fresh
water in the present as well as in the near future.
2) The population of the islands will be continuously increased. So, the electric power and fresh water will
be valuable more and more.

- Ours Proposal can sufficiently supply the electric power and the fresh water
for more than five thousand families and any facilities in the island.
- Fresh water generator would be highly helpful to economically produce
the fresh water without any additional heat source from sea water.

23
System Flow Chart
Make up water

L.T H.T
Expansion Expansion
tank tank
Exhaust gas
Electricity Exhaust gas Water Water boiler &
silencer

Grid
L.T Cooling water

Electricity Hot L.O


DF Engine
L.T Cooling water
L.T
Cold L.O L.O cooler & filter Radiator

Fresh Water generator


H.T Cooling water

H.F.O feed H.F.O


pump booster Fresh Water
module Starting Air

Heavy Fresh Water tank


Fuel oil

L.O separator
H.F.O
H.F.O separator
service tank Sludge
Air tank

Sludge

Sea Water
Sludge tank
Drinking Tap Water In Plant
H.F.O supply H.F.O
pump settling tank Water Using

25
System Flow Chart

• More than 18.000 Freshwater generators in service

• 180 MT /day based on 50MW operation

Based on ships over 2000dwt


Alfa Laval: Nirex, Atlas
Other solutions: Bunker Water, Competing Products

26
Working Principle
1. Ready for operation
2. Sea water, cooling, vacuum and feed
3. Heating
4. Evaporation, separation
5. Condensation and freshwater extraction

27
Low Salinity Guaranteed

• Constant supply of fresh water with salinity below


2 ppm. (1.5 ppm for VSP unit)

• You can bunker less water.

• High quality technical water prolongs the lifetime


of equipment onboard.

• No corrosion problems, also reduces maintenance


requirements.

28
Component of Freshwater Generators

29
Utilization of LNG Cold Energy
Application Filed of Cold Energy

Natural Gas
Cold Storage

Ice Sports Stadium Food Freezing

LNG Temperature R&D for low


(-162 ℃) temperature

Ice Factory

Manufacturing Liquid R&D for ultra low


Hydrogen temperature

Cold Energy from LNG can be used in the upper temperature than
LNG -162 ℃.
(Cold Storage, Food freezing, Ice Sports Stadium, R&D for low temperature, etc)

30
Utilization of LNG Cold Energy
Current Use Status of LNG Cold Energy
Liquified Carbonic
Country Air Liquefaction Power Generation Cryogenic Mill Cold Storage
Acid
Korea 1 - 1 - 1
Japan 8 16 1 4 3
France, Australia,
3 - - - -
Taiwan
Total 1 16 2 4 4

Mechanical vs Cold Energy(LNG) Storage

1. Storage Area : 16,500 m2 x 3 Floor x 5 Storage (Total 247,500 m2)


2. Electric Equipment :
Comparison Condition
- Mechanical 31,000kw (Compressor : 18,000kw, Etc:13,000kw)
- Cold Energy(LNG):5,000kw (Compressor : 0kw, Liquid Pump 4,100kw, Etc:900kw)

Mechanical LNG Cold Energy Reduction Rate Reduction Cost


Section
(USD) (USD) (%) (USD)
Electric Charge 3.1 M/year 1.2 M/year 51 % 1.9 M/year
Maintenance Fee 0.9 M/year 0.3 M/year 67 % 0.6 M/year

Initial Investment Fee 609 M 554 M 9% 54.6 M

31
Utilization of LNG Cold Energy
System Flow Chart

LNG
BOG
NG
Cold Energy

Power
Generation
BOG
Compressor

Gas Supply

Liquefaction High Pressure


System LNG Pump
Vent Stack &
Silencer

Heater & Vaporizer I

Heater & Vaporizer II Cold Storage

Refrigerant
Supply