ELS AND NO-DIG DESIGN

15 July 2011

STANLEY CHAU
15 July 2011

THE NO-DIG CHALLENGE

without disrupting other aspects Maintaining the


of social, commercial and “arteries” of the cities
industrial life
2
15 July 2011

THE NO-DIG CHALLENGE

Conventional Open Cut Trenchless Method


Method
3
COST COMPARISON

4
TRENCHLESS TECHNIQUES FOR PIPELAYING

Pipe Ramming Hand Dug PipeJacking

Horizontal Directional Drilling Guided Auger Boring


5
TRENCHLESS TECHNIQUES FOR PIPELAYING 15 July 2011

Hand Shield
TBM

Segmental Pipe
Hand Dig

Jacking,

Page - 6 March 2010


15 July 2011

INSTALLING PIPES BY MICROTUNNELLING

7
SCHEMATIC OPERATION OF TBM 15 July 2011

8
GENERAL ILLUSTRATION OF THE DRILLING
FLUID CIRCULATION IN THE TBM

9
COMPONENT OF TBM

Hydraulic Jack Tunnelling Boring Machine Slurry Treatment Plant

Jacking Pipe Intermediate Jacking Station

10 Control Panel
16 March 2011

11
16 March 2011

12
13
DESIGN CONSIDERATION FOR
NO-DIG
Common Site Constraints
• Limited Space on Site, e.g. Works
Area, TTA
• Reliable Underground Condition, e.g.
Soil Condition, UUs
• Mixed Underground Structure,
Foundation, Manhole, B.C., Seawall

14
DESIGN CONSIDERATION

Yes

March 2010
EXAMPLE FOR RIVER CROSSING

16
GENERAL ILLUSTRATION OF THE DRILLING
FLUID CIRCULATION IN THE TBM

17
TYPCIAL TECHNICAL DIFFICULTTIES FACED IN
TRENCHLESS APPLICATION
• Limited Space on Site

18
16 March 2011

19
RECLAMATION & DEVELOPMENT IN HONG KONG

20
16 March 2011

AERIAL PHOTOS

Mixed Underground Structure, old seawall

1967 2009 21
22
BUILDING A WORLD OF DIFFERENCE®

Proposed DN1500
Twin Sewers

Page - 23
Proposed Sewer Crossings

As-built drawing 24
16 March 2011

25
ROCK FRAGMENTS TRAPPED IN THE CUTTERHEAD

26
27
28
JACKING PIPES 16 March 2011

BS EN 5911 29
DESIGN OF PIPE JACKING

March 2010
CALCULATION METHOD FOR JACKING FORCE
Jacking Force Penetration Resistance Force

Friction Resistance Earth Pressure Distribution


btw Soil & Pipe
March 2010
PREDICTION OF SETTLEMENT BY TBM

March 2010
PREDICTION OF SETTLEMENT BY TBM

March 2010
PREDICTION OF SETTLEMENT BY TBM

Distance Away from Working Pit (m)


0 2 4 6 8 10 12 14 16 18 20 22 24 26
0

Ground Settlement (mm)


8

12

16

20

21.3 mm
24

Bulk Excavation Dewatering

March 2010
SETTLEMENT MARKER

38
TUNNEL GUIDANCE SYSTEM FOR PIPEJACKING

39
LOSS OF SLURRY

40
HEADING TUNNEL METHOD

41
CONSTRUCTION FLOW OF HEAD TUNNEL
METHOD

42
Page - 43 March 2010
SAFETY TIPS – WORKING IN CONFINED
SPACES

Working Shaft

Tunnel
Source: Construction Phase Services ESH&S Field Guild, Safety Check List (Form FA321/11) and S&H Preplanning
Checklist [SH-WAM-001-B]
16 March 2011

FRONT FACE OF HEAD TUNNEL METHOD

44