Professional Documents
Culture Documents
PROGRESS
REPORT
ADMINISTRATION DEPARTMENT
RANHILL WATER SERVICES SDN BHD
LANGKASUKA
ROSLINAH ABU BAKAR
MENTOR
VOLUME
FUEL DATA
268,794.14
COMPLETED INSTALLATION
250,000.00 233,104.45
204,627.80 209,250
200,000.00 186,649.26 191,987.84
BEFORE
147,904.71
150,000.00
100,000.00
58,400.81 60,693.41 61,883.77 59,900.38 54,445.97
50,000.00 29,904.82 39,850.62
0.00
JUNE JULY AUG SEPT OCT NOV DEC
MONTH
RM KM
KM Project Details
3 Month Before Installation
To t a l Mo n e y(RM)
RM
55,500.00
55,032.67
55,000.00
54,500.00
53,880.95
54,000.00
53,476.84
53,500.00
53,000.00
52,500.00 MONTH
JUNE JULY AUG UST
KM Project Details
3 Months After Installation
To t a l Mo n e y(RM)
RM
50,000.00
44,157.20
45,000.00
40,000.00
35,000.00 32,149.15 31,314.42
30,000.00
25,000.00
20,000.00
15,000.00
10,000.00
5,000.00
MONTH
0.00
O C TO BER NO VEMBER DEC EMBER
KM Project details
Project question :
How many % cost saving been detected after using this method?
What is the positive impact from this implementation?
Does the equipment give impact to maintenance cost?
How long this equipment can last?
Is there any difference on cost saving between short distance (town
area) and long distance vehicles?
What type of vehicles are used in this project/analysis and number of
vehicles?
Recover period?
Year of vehicles?
Project title :
Cost Saving On Fuel Consumption For RWS Vehicles
KM Project Details
Positive Impact of this Implementation
* 20% - 40% fuel reduce ( depends on how the
vehicles drived and traffic condition)
* 20% upgrading engine perfomance
* Self installation and save on cost of installation
KM Project Details
Impact on Vehicles Repair & Maintenance
Drive Area In August Kota Tinggi,Mersing, JB to Kota Everyday Kota Tinggi,Mersing, JB to Kota Everyday
Driving Condition City and Long Distance Drive (Old road) City and Long Distance Drive (Old road)
Trafik Medium Medium
TOWN AREA DRIVING
Name Fadzil Gani
Department Leakage Jb
Model/cc/GearBox Perodua Rusa 1.6 Manual
Year 2005
Reg. No JJF 1158
Installation 4/8/2008
Fuel Petrol
Drive Area In August Sri Alam,Skudai,Bandaraya Johr Bahru Bandaraya Johor bahru
Driving Condition City and Highway Drive City and Highway Drive
Trafik LIGHT LIGHT
KM Project Details
Recovery Period
Month 1 2 3 Total
W W W W W W W W W W W W W W W W W W W W W W W W W W W W
INITIATIVES TARGET 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4
6 INSTALL ON 6 VEHICLE
1 TRAINED BY IKP(SUPPLIER) TO
2 INSTALL
* IKP
- TO FIND OTHER OPTION ON FUEL SAVING EQUIPMENT, HYDO FUEL OR NGV
GAS TO BE INSTALLED FOR RWS VEHICLES
ADMIN EXECUTIVE
* ROAD MAP
- PROPOSE TO MANAGEMENT TO SELECT ‘MAGSAVER’ TO BE INSTALLED TO 6
NOS OF VEHICLES AS OUR PILOT PROJECT
KNOWLEDGE MEASUREMENT
* STRUCTUAL DESIGN
GET OPINION AND SUGGESTION FROM PC MEMBERS ADMIN EXECUTIVE
* TECHNOLOGY
SHARE THE FINDINGS OR PROGRESS OF THE PILOT PROJECT BY EMAIL
KM Project details
Roadmap
PERSON (S)
MONTH POKM INITIATIVES RESPONSIBLES
* IKP
KNOLEDGE MEASUREMENT
* STRUCTUAL DESIGN
KM Project details
Roadmap
* IKP
* ROAD MAP
KNOLEDGE MEASUREMENT
* STRUCTUAL DESIGN
KM Project details
Roadmap
* IKP
* ROAD MAP
KEDAH
*TECHNOLOGY
KNOLEDGE MEASUREMENT
* STRUCTUAL DESIGN
- TO COLLECT ALL MONTHLY DATA AND MONITOR THE PROGRESS VEHICLE TECHNICIAN
TECHNOLOGY ADMIN EXECUTIVE
SHARE THE DATA IN PUBLIC AND EMAIL
% PETROL SAVING FOR ALL VEHICLES
KM Project details
K-Product