GPS Functions

MOVE UP Key
MENU Key
MOVE DOWN Key

ENTER Key ON/OFF Key


GPS Views after turn ON

Press MENU
Press ON/OFF
How to set Site ID in GPS

ENTER Move
UP/DOWN

Next Next
Ma

ENTER
k it
r

Next OK
How to set Site Lat/Long in GPS

ENTER

ENTER
Move
UP/DOWN
Next Next
Next
Ma
k it

k it
r
Ma

OK
ENTER
How to save all i/p in GPS

ENTER

ENTER OK
Next Next

ENTER OK ENTER OK
How to shoot ID From GPS

ENTER

Move
UP/DOWN Move
ENTER UP/DOWN
ENTER
ENTER
M ENTER
k i ar
Next Next
Next
Ma

t M
k it

k i ar
r

t M
k i ar
t
How the Current Lat/Long Screen come on GPS
This image would
be captured by
Camera

Move Move Move Move Move


DOWN DOWN DOWN DOWN DOWN
Lat/Long View of GPS
Operator Id/Nominal Id.

Distance From Nominal

Nominal Direction

Current Lat/Long
Compass to Measure the Azimuth
Finding North Direction of Building
Building’s North/Site’s North(or 0°)
Obstacle Counting
Not Obstacles(Not within
Obstacles(Within 300meters)) 300meters))

Measure the obstacle Measure the obstacle


height by counting the no position in Degree with
of floors from the ground the reference of 0°.
Site/Building Rooftop
to the top.
Direction of 0°
Drawing Rooftop Layout or N with
respect to
building &
Mentioning the mention it.
site
name/operator ID.
Proposed Pole at 120°
Proposed Pole at with 27m height.
340° with 27m BTS
height. Room
Mentioning the
Proposed Pole at pole height from
230° with 27m rooftop.
height.
Mentioning the Mentioning the
BTS Room on rooftop level from
rooftop. Ground.

Mentioning the Mentioning the


Existing pole on drawing criteria of
rooftop. rooftop.
How panoramas are taken
Starting from North Side of Building or 0°

0° 30° 60° 90°

120° 150° 180° 210°

240° 270° 300° 330°


How Direction Pictures are taken
Fill Up the Cover Page of Report

Area in
which
site is Denote with the
situated priority basis

If all requirements are If no requirements are If all requirements are


available with the site with available with the site with available with the site with
no change and no all changes and many some change and some
obstacles. obstacles. obstacles.
General Info

Own Operator/The
Operator is Shared will
mark.
Contact Info

The Person with whom would


contact in future to access the
site. Ex. Caretaker/Manager
RF Engineering Info
Lat/Long on the site
(rooftop/Greenfield) showing
on GPS at the time of Survey

If site is within 50m


from nominal then
mark YES otherwise NO
(Taken from GPS)
Antenna Info
Exact height of antenna
Exact Azimuth of Exact Tilt of
from ground(Building
sector antennas sector antennas
Height + Tower/Pole Height)

Area Condition in front of Sector Antennas.


Ex. Residential/Commercial/Greenfield/Pond/Lake
Landmark Info

A famous thing(Building/Mosque/Lake/Shop)
around the site through which it is possible to
reach the site.
Observation

Decision Concluded for the Site and Around


Obstacles Info
Obstacles Height(If Under
Obstacles Position in Construction then future
Degree with respect height must be noted) and
to Site taking from 0° Distance from the Site.