Edificios Comerciales e Institucionales Instalaciones Nuevas, as como ya Existentes
Pasos
Caso base vs caso propuesto Pasos: Combustible & programacin Caractersticas de las instalaciones(energa + costos) Resumen (energa) Anlisis de emisin Anlisis financiero
Schedule Description Temperature - space heating Temperature - space cooling Temperature - unoccupied Occupancy rate - daily Monday Tuesday Wednesday Thursday Friday Saturday Sunday Occupancy rate - annual
Unit
Schedule 2 Occupied 21.0 24.0 Unoccupied 3.0 Occupied h/d 18.0 18.0 18.0 18.0 18.0 18.0 18.0 6,570 75%
Schedule 3 Occupied
Schedule 4 Occupied
Schedule 5 Occupied
Schedule 6 Occupied
C C +/-C
0 0%
0 0%
0 0%
0 0%
Facility characteristics
Show data Incremental initial costs $ 0 0 60,000 Fuel cost savings $ 0 0 28,659 Incremental O&M savings $ 0 0 0 Include measure?
Show: Fuel saved Heating system Boiler Cooling system Air-conditioning Building envelope Appartment building Ventilation Lights Electrical equipment Hot water Other Total
Heating GJ 0 2,686
Cooling GJ 0 0
Electricity GJ -
2,686
60,000
28,659
2.09
Summary
Show data Fuel Fuel consumption unit Fuel rate m $ 0.400 Base case Fuel consumption 160,194.2 Proposed case Fuel consumption 88,546.3 Fuel cost savings Fuel cost savings 28,659 28,659
$ $
Energy Energy - base case Energy - proposed case Energy saved Energy saved - % Benchmark Energy unit Reference unit User-defined Benchmark Energy Energy - base case Energy - proposed case Energy saved
Cooling GJ 0 0 0
7,500 2,000 Cooling kWh/m 0.0 0.0 0.0 Electricity kWh/m 0.0 0.0 0.0 Total kWh/m 155.7 86.1 69.6
Seccin de Resumen
Resumen de combustible Verificacin del proyecto Valores de Referencia
Mtodo 2
RETScreen Energy Model - Energy efficiency measures project
Fuels & sche dules Fuel Fuel type Fuel consumption - unit Fuel rate - unit Fuel rate Show data Fuel type 1 Electricity MWh $/kWh 0.100 Fuel type 2 Natural gas - m m $/m 0.400 Fuel type 3 #N/A #N/A Fuel type 4 #N/A #N/A Fuel type 5 #N/A #N/A Fuel type 6 #N/A #N/A Schedule Description Temperature - space heating Temperature - space cooling Temperature - unoccupied Occupancy rate - daily Monday Tuesday Wednesday Thursday Friday Saturday Sunday Occupancy rate - annual Unit
Schedule 5 Occupied
Schedule 6 Occupied
C C +/-C
Notes/Range
Unoccupied Occupied h/d Unoccupied
Emission Analysis GHG emission factor (excl. T&D) tCO2/MWh 0.211 5,256
Base case electricity system (Baseline) Country - region Canada Electricity exported to grid GHG emission Base case Proposed case Gross annual GHG emission reduction GHG credits transaction fee Net annual GHG emission reduction GHG reduction income GHG reduction credit rate
h/yr % C d d
Facility characteristics
is equivalent to
218
Show : Fuel saved Heating system Boiler Cooling system Air-conditioning Building envelope Appartment building Ventilation Lights Electrical equipment Hot water Other Total
Heating GJ 0 2,686
3.0 Initial costs (credits) Occupied Feasibility study h/d h/d Feasibility study 24 18.0 Sub-total: 24 18.0 Development 24 18.0 Development 24 18.0 Sub-total: 24 18.0 Engineering 24 18.0 Engineering 24 18.0 Sub-total: 8,760 6,570 Energy efficiency measures 100% 75% Incremental initial costs 16.0 Balance of system & miscellaneous 242 Spare parts 123 Transportation Training & commissioning User-defined Show data Contingencies Interest during construction Incremental Sub-total: Cooling Electricity initial costs Total initial costs GJ 0 0 GJ $
Unit
Quantity
Unit cost
Occupied h/d
Amount $ $ $ $ $ $ $ 60,000
Relative costs
0.0%
Method 1 cost
0 0%
Method 2 0 Method 3 0%
0 0%
0 0%
21 310
RETScreen Financial Analysis - Energy efficiency measures project % $ Base case system GHG summary (Baseline) Financial parameters Project costs and savings/income summary
$ General $ CO2 emission Fuel cost escalation rate $ Fuel60,000 $ mix Inflation rate factor $ Fuel type % Discount rate kg/GJ $ 60,000 $ Project life Incremental Include Natural gas Enter number of months 100.0% $ O&M measure? Total savings Simple payback 100.0% 60,000 Finance $
$ yr
$/tCO2
0.00
Annual costs (credits) 0 O&M O&M (savings) costs 0 Parts & labour User-defined 60,000 Contingencies Sub-total: Fuel cost - proposed case Natural gas Sub-total:
60,000
Unit
Quantity
Amount
2.1
$ % $ $
88,546
$ CO2 Debt interest rate emission Debt $ Fuel mix term factor $ % Debt-payments kg/GJ $ 100.0% 100.0% Income tax analysis 0.400
Effective income tax rate $ Loss carryforward? 35,419 Depreciation method Depreciation tax basis
35,419
2,686
28,659
Financial Analysis Financial parameters Inflation rate Project life Debt ratio Debt interest rate Debt term Initial costs Incremental initial costs Other Total initial costs Incentives and grants Annual costs and debt payments O&M (savings) costs Fuel cost - proposed case Debt payments - 10 yrs Other Total annual costs Annual savings and income Fuel cost - base case Electricity export income Other Total annual savings and income Financial viability Pre-tax IRR - equity Pre-tax IRR - assets Simple payback Equity payback
Summary
160,194
% yr % % yr
Fuel Base case Periodic costs (credits) Fuel User-defined consumption Fuel unit Fuel rate consumption Fuel cost m $ 0.400 End of project life 160,194.2 $ 64,078 $ 64,078 Fuel consumption unit m Heating GJ 4,204 2,324 1,880 44.7% Fuel consumption historical Fuel consumption Base case 160,194.2 Electricity GJ 0 0 0 Fuel consumption variance
Tax holiday available? Energy yr tCO2 Proposed caseefficiency measures cost savings Tax holiday duration Fuel
Depreciation 0.400 $ rate 64,078 Years of Base case Depreciation period 64,078 occurrence $ GHG emission
project
Unit cost
Year
Unit cost
$ $
$ Fuel cost income Annual $ savings Electricity export income 28,659$ Electricity exported to grid 134 28,659 Electricity export rate
Electricity export income Electricity export escalation rate GHG reduction income
1 to -1
Amount
299
yes/no % %
tCO2 MWh
$/MWh $ %
$ $ $ $
4,000,000 4,000,000
Energy Energy - base case Energy - proposed case Energy saved Energy saved - %
Cooling GJ 0 0 0
Net GHG reduction Net GHG reduction - 40 yrs GHG reduction credit rate GHG reduction income GHG reduction credit duration Net GHG reduction - 0 yrs GHG reduction credit escalation rate Customer premium income (rebate) Electricity premium (rebate) Electricity premium income (rebate) Heating premium (rebate) Heating premium income (rebate) Cooling premium (rebate) Cooling premium income (rebate) Customer premium income (rebate) Other income (cost) Energy Rate Other income (cost) Duration Escalation rate Clean Energy (CE) production income CE production CE production credit rate CE production income CE production credit duration CE production credit escalation rate
Benchmark Energy unit Reference unit User-defined Benchmark Energy Energy - base case Energy - proposed case Energy saved
7,500 2,000 Cooling kWh/m 0.0 0.0 0.0 Electricity kWh/m 0.0 0.0 0.0 Total kWh/m 155.7 86.1 69.6
$ $ $ $ $
0 398,657 451,217
% $ % $ % $ $
Yearly cash flows Year Pre-tax # $ -60,000 29,232 29,817 30,413 0.0% $ 0 4 31,022 0.0% $ 0 5 31,642 100.0% $ 60,000 6 32,275 0 0.0% $ 0 7 32,920 60,000 100.0% $ 60,000 8 33,579 N2O emission Fuel GHG emission 9 34,250 Incentives and grants $ factor 0 10 34,935 factor consumption GHG emission 11 35,634 kg/GJ 0 MWh tCO2/MWh tCO2 Annual costs and debt payments 12 36,347 922 0.179 165 O&M $ 0 13 37,074 922 0.179 165 Fuel cost - proposed case $ 35,419 14 37,815 T&D losses Total 165 Debt payments - 0 yrs $ 0 15 38,571 No Total annual costs $ 35,419 16 39,343 Declining balance 17 40,130 Yes Periodic costs (credits) 18 40,932 $ 0 19 41,751 Gross annual Net annual $ 0 20 42,586 GHG emission GHG credits GHG emission 15 End of project life - cost $ 0 21 43,438 reduction transaction fee reduction No 22 44,306 % tCO2 Annual savings and income tCO2 23 45,193 134 Fuel cost - base case $ 64,078 134 24 46,096 Electricity export income $ 0 25 47,018 GHG reduction income - 0 yrs $ 0 26 47,959 $ 0 27 48,918 is equivalent0to Customer premium income (rebate) trucks not used 27.2 Cars & light 0.00 Other income (cost) - yrs $ 0 28 49,896 0 CE production income - yrs $ 0 29 50,894 Total annual savings and income $ 64,078 30 51,912 31 52,950 32 54,009 0 33 55,089 134 Financial viability 34 56,191 5,342 Pre-tax IRR - equity % 50.7% 35 57,315 Pre-tax IRR - assets % 50.7% 36 58,461 0 37 59,631 After-tax IRR - equity % 50.7% 38 60,823 0 After-tax IRR - assets % 50.7% 39 62,040 40 63,281 Simple payback yr 2.1 41 0 Equity payback yr 2.0 42 0 43 0 0 Net Present Value (NPV) $ 225,387 44 0 Annual life cycle sav ings $/yr 27,340 45 0 0 46 0 Benefit-Cost (B-C) ratio 4.76 47 0 0 Debt service coverage No debt 48 0 0 Energy production cost $/MWh -791.21 49 0 GHG reduction cost 50 0 $/t 2 CO (205 )
N2O emission Feasibility study 2.0% factor 2.0% Development 12.0% Engineering kg/GJ
40
Initial costs
Power system Heating system Cooling system User-defined Energy efficiency measures Balance of system & misc. Total initial costs
Fuel 0.0% consumption 0.0% MWh 0.0% 0.0% 1,668 0.0% 1,668
After-tax $ -60,000 29,232 29,817 30,413 31,022 31,642 32,275 32,920 33,579 34,250 34,935 35,634 36,347 37,074 37,815 38,571 39,343 40,130 40,932 41,751 42,586 43,438 44,306 45,193 46,096 47,018 47,959 48,918 49,896 50,894 51,912 52,950 54,009 55,089 56,191 57,315 58,461 59,631 60,823 62,040 63,281 0 0 0 0 0 0 0 0 0 0
Cumulative $ -60,000 -30,768 -951 29,463 60,484 92,126 124,401 157,321 190,900 225,150 260,086 295,720 332,066 369,140 406,955 445,527 484,869 524,999 565,931 607,682 650,268 693,706 738,012 783,205 829,301 876,320 924,279 973,196 1,023,093 1,073,987 1,125,899 1,178,849 1,232,858 1,287,948 1,344,139 1,401,454 1,459,916 1,519,546 1,580,370 1,642,409 1,705,690 1,705,690 1,705,690 1,705,690 1,705,690 1,705,690 1,705,690 1,705,690 1,705,690 1,705,690 1,705,690
Cumulative cash flows graph 0 1,800,000 1,600,000 922 0 1,200,000 Cumulative cash flows ($) 1,000,000 800,000 600,000 400,000 200,000 0 0 -200,000 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 1,400,000
$ $ $ $
0 788,400 788,400
% % yr yr
Year
Year
Preguntas?