Normal: Most likely task duration, like m in Chapter 8 Crash: Expedite an activity, by applying additional resources
Specialized or additional equipment More people (e.g., borrowed staff, temps)
Crashing buys time, but nothing comes free Potential cost areas
Additional equipment/material Extra labor Negative effects on other projects Reduced morale, from excessive hours/shifts Lower quality, from the pressure of time, inexperienced and tired staff
If you want it bad, youll get it bad . . .
expensive way to do it
Activity a b c d* e**
Predecessor a a a b
Activity
a
Slope ($/Day)
-40
b
c D
-60
-30
-70 (2 days)
9-12
Pros:
Can shorten project duration Can reduce product development cycles
Cons:
Can increase cost through redesigns, excessive
9-15
Assuming fixed performance specifications, tradeoff areas must be in time or cost Time-limited or resource-limited
If all three dimensions are fixed, the system is overdetermined
Normally, no tradeoffs are possible But, something has to give . . .
9-17
Resource loading: types and quantities of resources, spread by schedule across specific time periods
One project, or many
Identifies and reduces excess demands on a firms
resources
9-19
9-23
Resource leveling minimizes period-by-period variations in resource loading, by shifting tasks within their slack allowances Advantages
Less day-to-day resource manipulation needed Better morale, fewer HR problems/costs Leveling resources also levels costs, simplifies budgeting
and funding
Approaches to CRS
Heuristic Method Optimization Model
Heuristic Methods
Results are good enough for many purposes Used for large, non linear, complex problems
PERT/CPM
As soon as possible As late as possible Shortest task first Most Resources first Minimum slack first Most critical followers Most Successors Arbitrary
Minimum Schedule slippage Best utilization of facilities Minimum system occupancy time
Optimizing Method
Mathematical Programming Enumeration
Resource Utilization
Smoothes peaks and valleys of resourse usage Eliminate the concept of WAIT
In-Process Inventory
Amount of work waiting due to shortage of resources Requires trade off between cost of inprocess inventory and cost of resources
Heuristic Techniques
1. Resource Scheduling Method
dij= increase in duration resulting when activity j follows activity i =Max [0;EFi-LSj]
EFi= early finish of activity i; LSj= latest start of activity j
Priority= djrij
dj= duration of activity rij=per period requirement of resource i by activity j
The Problem:
The amount of resources is limited in successive scheduling periods
The Solution:
Find a schedule best satisfying sequence and resource constraints A schedule minimizing overall duration of entire network
Before allocation of resources, consider the quantity of resources available Weists heuristic allocates resources to activities in order of their early start times Depletion of resources before completing task lists results in delay of remaining task We may borrow resources or deschedule currently active noncritical task
The Problems
Thoughtless optimism
o o PMs dont accept lateness to be their fault Ignore risk management
Game playing
o o Workers add extra time, resource and budget to their portion of work Blaming each other
B1
20
A2
A3
B2
40
50
B3
60
B1
40
A2
A3
B2
50
30
B3
60
ADRESSING A PROBLEM
The present status of Quality in higher learning institutions of Pakistan is quite questionable. Pakistani Universities are not capable of meeting the international standards of higher education. Goal of International compatibility and competitiveness is not achieved.
Vision Statement:
Developing a viable and sustainable mechanism of quality assurance in higher learning sector to meet the rising challenges of transforming the country into a knowledge economy.
GOALS
Policy making and developing practical guidelines of quality assurance in cross cutting areas of higher learning.
Developing guidelines for establishing of Quality Enhancement Cells and Monitoring & Evaluation of these QECs.
Capacity building to enhance the standards of quality assurance in higher education at national level.
Location of Project:
Area to be served:
Cost Estimates:
Total annual recurring budget Rs.19,700,000 Break down of 10,000,000 for QECs @ 1,000,000 per QEC and 9,700,000 for QAA.
Functions of QAA
Developing practical guidelines and policies for establishing QECs at public sector universities.
Sr #
1 2
Item
Capital cost Annual recurring cost of QAA during execution
Estimated cost
3,660,000 9,400,000
Financial allocation
HEC and 10 relevant public universities HEC
10,000,000
23,060,000
Sr#
Items
1 2 3
Printers
10@ 1/QEC
100,000
150,000
5
6
Scanner
Furniture
As per requirement
As per requirement 200,000
1
As per requirement Cartridges for Professional Colour printer 1 1,500,000
20,000
200,000
Papers/catridges
200,000
200,000
8 9
1,000,000 2,160,000
Sr# 1 2
Number 01 01
3
4 5 6 7 8
Training Coordinator
Data Analyst P.A/Stenographer Naib-Qasid Driver Total salaries per month
01
01 01 01 01
25,000
10,000 8,000 3,0000 4,000 160,000
1,920,,000
Quality Assurance Agency (QAA) is engaged in systematic implementation of quality enhancement procedures/criteria to attain improved levels of international compatibility and competitiveness at institutional and program level.
Established in 2005, QAA is engaged in developing a viable and sustainable mechanism of quality assurance in the higher learning sector in order to meet the rising challenges of transforming the country into a knowledge economy.