Professional Documents
Culture Documents
Technical Note 5
Job Design and Work Measurement
John Doucette
Dept. of Mechanical Engineering
University of Alberta
http://www.mece.ualberta.ca/~doucette/mece513/
MEC E 513 – Production and Operations Management
Job Structure
John Doucette
2 Dept. of Mechanical Engineering
Lecture 04a TN5: 28 September 2006
MEC E 513 – Production and Operations Management
John Doucette
3 Dept. of Mechanical Engineering
Lecture 04a TN5: 28 September 2006
MEC E 513 – Production and Operations Management
John Doucette
4 Dept. of Mechanical Engineering
Lecture 04a TN5: 28 September 2006
MEC E 513 – Production and Operations Management
worker
worker at a Job interacting
fixed with other
Design
workplace workers
worker
interacting
with equipment
John Doucette
5 Dept. of Mechanical Engineering
Lecture 04a TN5: 28 September 2006
MEC E 513 – Production and Operations Management
Work Measurement
• Work measurement is a process of analyzing jobs for the
purpose of setting time standards
• Time study
– Timing all tasks required for the job
• Work sampling
– Random sampling of a worker’s activities
John Doucette
6 Dept. of Mechanical Engineering
Lecture 04a TN5: 28 September 2006
MEC E 513 – Production and Operations Management
Time Study
• The normal time (NT) is the how long it should take an
ordinary worker to complete the task:
NT = UT x PR
• Also: NT = TW x PR
# Units
John Doucette
7 Dept. of Mechanical Engineering
Lecture 04a TN5: 28 September 2006
MEC E 513 – Production and Operations Management
ST = NT x (1 + allowances)
• Also: ST = ___NT___
1 – allowances
John Doucette
8 Dept. of Mechanical Engineering
Lecture 04a TN5: 28 September 2006
MEC E 513 – Production and Operations Management
• What are the normal and standard times for this job?
John Doucette
9 Dept. of Mechanical Engineering
Lecture 04a TN5: 28 September 2006
MEC E 513 – Production and Operations Management
Work Sampling
• Use inferences to make statements about work activity
based on a random sampling of the activity
– Performance Measurement
• Relates work time to output (performance index)
– Time Standards
• How long does/should it take to perform each task?
John Doucette
10 Dept. of Mechanical Engineering
Lecture 04a TN5: 28 September 2006
MEC E 513 – Production and Operations Management
John Doucette
12 Dept. of Mechanical Engineering
Lecture 04a TN5: 28 September 2006
MEC E 513 – Production and Operations Management
John Doucette
13 Dept. of Mechanical Engineering
Lecture 04a TN5: 28 September 2006
MEC E 513 – Production and Operations Management
John Doucette
14 Dept. of Mechanical Engineering
Lecture 04a TN5: 28 September 2006
MEC E 513 – Production and Operations Management
John Doucette
15 Dept. of Mechanical Engineering
Lecture 04a TN5: 28 September 2006
MEC E 513 – Production and Operations Management
John Doucette
17 Dept. of Mechanical Engineering
Lecture 04a TN5: 28 September 2006
MEC E 513 – Production and Operations Management
John Doucette
18 Dept. of Mechanical Engineering
Lecture 04a TN5: 28 September 2006