Roof Drains: Temple Emanu-El

Situation
10 roof drains encased in concrete pillars Badly corroded and leaking Multiple bends in the system

Benefits of Nu Flow Solution


Pipes were cleaned of all corrosion and restored to original diameter

Roof Drains: EEOB

Situation
Original pipes had almost entirely disintegrated Two 70 foot roof drains, each containing a double 45 degree bend

Benefits of Nu Flow Solution


Pipes are protected from corrosion and other problems with a long-term solution

Floor Drains: Coca-Cola


Situation
Syrup and high temperatures used in production caused corrosion of cast iron floor drains Equipment removal from the factory and production delay was no option

Benefits of Nu Flow Solution


Completed quickly without shutting down plant operations
High Heat and Corrosion Resistant Epoxy was used to ensure problem would not come back any time soon

Other: GSF Grand Banks Oil Rig


Situation
Pipe used in manual water measurement had a badly corroded access point A complete blockage had occurred Problems since conception

Benefits of Nu Flow Solution


Pipe was cleaned of corrosion and blockages Work was completed in less than one day

No downtime to GSF saving millions in lost production

Storm Drains: 101 West Broadway


Situation
8 storm drain with a length of 95 feet and a 6 storm drain with a length of 40 feet

Being almost 30 years old, the aged pipes had corrosion, cracks and leaks

Benefits of Nu Flow Solution


Nu Flows trenchless technologies permitted the installation of lining for cracked storm pipes that were above tellers desks in a bank The permanent structural liner will protect the pipes against future problems

Storm Drains: Congregation Beth Israel


Situation
Entire cast iron storm drain system was 50 years old and leaking

The leaks damaged the synagogues 100year-old organ


Pipe diameters were 4, 6 and 10

Benefits of Nu Flow Solution


Nu Flow cleaned and lined the roof drain system, even though it was located on several tiered roofs and in tight spaces We caused absolute minimal disruption and worked with the temples schedule The customer said Nu Flow saved them at least tens of thousands of dollars in damage and renovation costs

"It wasn't just about what Nu Flow saved us in money. It's what Nu Flow saved us in headache and worry." - Patrick Colbert, Facilities Manager, Congregation Beth Israel

Roof Drains: Maryland House of Delegates Office Building


Situation
Roof drains made of galvanized pipes that range from 3 to 5 in diameter

These original roof drains were leaking


Nu Flow had to do the work during the office buildings $9 million remodel

Benefits of Nu Flow Solution


Nu Flow cleaned and lined the roof drains with our patented structural liner to serve as a long-term solution against future problems We preserved the government building with our no-dig technology We saved the customer money and time We did not disrupt the other contractors during our work