Sl.No Date of receipt Date of Complaint Logged Plant/Line Part Name / Part Number Probem Details
17/09/2010
17/09/2010
PROSITY
2160
215
open
17/09/2010
17/09/2010
GRAINDING MARK
2160
100
10/9/2010
10/9/2010
ASSY LINE-2
GMI-WCC023
2016
9/9/2010
9/9/2010
PRESS SHOP
ITL-WTF004
469
21/08/2010
21/08/2010
PRESS SHOP
MSIL WCC046
1400
18/09/2010
18/09/2010
PAINT SHOP
MSIL WCC046
WRINKLES
830
500
BK THAKUR
10/9/2010
10/9/2010
RIM LINE
MSIL RCC023
TOOL MARK
1800
150
15/09/2010
15/09/2010
ASSY LINE-2
456
45
15/09/2010
15/09/2010
PRESS SHOP
M-200 DCC012
DISC PITTED
350
25
10
20/09/2010
20/09/2010
ASSY LINE-2
650
63
11
20/09/2010
INTERMITENT WELDING
900
12
20/09/2010
20/09/2010
ASSY LINE-2
M-200 WCC023
450
250
13
22/09/2010
22/09/2010
RIM LINE
M-200 WCC023
845
14
23/09/2010
23/09/2010
PAINT SHOP
M-200 WCC023
OIL DROPS
422
27
BK THAKUR
15
25/09/2010
25/09/2010
1350
48
16
24/09/2010
24/09/2010
PAINT SHOP
M-300 WCC047
850
45
BK THAKUR
17
1/9/2010
1/9/2010
ASSY LINE-2
M-200 WCC023
WELD SHIFT
1,460
100%
18
1/9/2010
1/9/2010
RIM LINE
M-200 WCC023
1,145
50%
RAJKUMA R/YOGES H
19
29/09/2010
29/09/2010
RIM LINE
1008
20
10/1/2010
10/1/2010
ASSY LINE-2
1008
21
30/09/2010
30/09/2010
RIM LINE
M-200 WCC023
1440
22
25/09/2010
25/09/2010
PRESS SHOP
WTF002
131
23
24
25
Corrective Actions: Detection can be done only by visual. 1. Associates at unpainted wheel inspection to be trained for requirements Yogesh Srinivasan
Preventive Actions: 1. Training to the associates on Wheel Defects Yogesh Srinivasan 2. Immediate Inspection after welding Machine operator 3. Incoming discs and Rim should be free from oil - Mr. Yogesh Srinivasan 4. Patrol Inspection - Mr. Alpesh & Mr. Karthikeyan
Corrective Actions: Detection can be done only by visual. 1. Associates at unpainted wheel inspection to be trained for requirements Yogesh Srinivasan
Preventive Actions: 1. Training to the associates on Wheel Defects Yogesh Srinivasan 2. Sensor for weld miss detection to be incorporated - Mr. Baskaran 3. Patrol inspection Mr. Alpesh & Mr. Karthikeyan
Corrective Actions: Detection can be done only by visual. 1. Associates at rim and unpainted wheel inspection to be trained for requirements Yogesh Srinivasan
Preventive Actions: 1. Training to the associates on rim Defects Yogesh Srinivasan 2. Associate at rim line to be taught on requirements - Mr. P. N. Bhatt & Mr. Rajkumar 3. Patrol inspection Mr. Alpesh & Mr. Karthikeyan
Corrective Actions: Detection can be done only by visual. 1. Associates at unpainted wheel inspection to be trained for requirements Yogesh Srinivasan
Preventive Actions: 1. Training to the associates on Wheel Defects Yogesh Srinivasan 2. Associate at rework to be taught on requirements - Mr. Anil Mishra 3. Patrol inspection Mr. Alpesh & Mr. Karthikeyan
Initiated by : B.K.Thakur
To reduce the Paint overflow, blackness & paint dust defects in MSIL wheels from 3.6% to1.0 %. Current Situation: . Presently we are getting 1.0% paint defect.
Correction Action: 1. Training given to all painters for manual spray painting after the auto reciprocator painting in manual booth.( WI W/WR/PP1/022) 2. Training given to operator for proper cleaning of wheels before painting. 3. Training given to painter for bore area cleaning & touch up painting before final inspection.(W/WR/PP1/51).
SIGN : DATE : Team members Leader : BKT, Mr. Vipul, Mr. Chintan, Mr. Kuldeep
Target Date :
31.10.2010
Actual Date :
Root cause : 1. Unskilled painter. 2. Line stoppage during the power failure & tea break.
SIGN : Attach sheets / Fish bone Diagram / Parts Analysis etc. if reqd. Correction Action : Sr. No. Action Training given to all painter 1 2 Stable painter (min. 6 no.)
DATE :21.09.2010
enviroment
man
painter touch up
Paint Defect ( overflow, blackness & bore Dust) manual gun paint viscosity application process Setting cleaning
material
method
Reciprocator
DATE : 08.10.10
CORRECTIVE ACTIONS / LONG TERM ACTION (At t ach Phot ographs of act ions t aken) Identified Root Cause from WHY-WHY analysis Gutter pit crack Corrective Actions Planned / taken 100% parts will be checked NA Error - Proofing Responsibility V ikas Garg
Date of Im plem entation
Next lot
MONITORING EFFECTIVENESS OF CORRECTIVE ACTIONS (REVIEW) Sr Corrective Actions Taken 100% parts will be checked Target 05.10.10 Actual 05.10.10 Results of Action taken Date of Review Status
7A
7B
PREVENTION/LESSONS LEARNED (List ot her similar processes & product s wit h t he pot ent ial for t he same defect ) Sr 1 Processes / Products Inspection shall be carried out 100% Corrective Actions Error - Proofing Responsibility V ikrant Date of Imple
# 1 2 3 4 5 6
PROBLEM CLOSURE & SIGN-OFF PROBLEM PROGRESS SUMMARY Phase Start Date Actual Date Problem Definition Containment Action Root Cause analysis Corrective Action Solution Confirmation Closure 17.09.10 17.09.10 17.09.10 17.09.10 17.09.10 17.09.10 17.09.10 17.09.10
Closure Sign-off Team Member Function Vikas Garg Vikrant Mfg Quality
Sign-0ff
= PA GE 2OF2
(Det erminat ion of root cause, correct ive act ion & monit oring effect iveness of implement at ion) MANAGEMENT VERIFICATION & CLOSURE Sign Date Name Head MFG
Prepared By Vikas Garg FORM AT NO : F/W R/M R/007 M onth& Year Of Release with Revision level
QA & Materials
Prodn
PPC
Tool Eng.
Approved By
Other
M ay'08/R0
DATE : 08.10.2010
17.09.2010
Feedback from
AMW PDI
Problem Awareness Problem Scope New Problem Severity Safety Regulatory Functional Existing Aesthetic Reliability Reopened Others PDI Field Com plaints Dom estic / Export Line
Wheel rim line no. 5
Problem Source
Yes
Yes
WHEEL RIM
% defect 1%
Part Nos
% defect
PROBLEM DEFINITION (At t ach Phot ographic det ails of failure, At t ach T rend dat a, Paret o analy sis, Warrant y et c)
Butt wel d Cr ack
Start Date
End Date
17.11.2010
Responsibility
AMW
Break Point
SHORT T ERM A CT I ON:Next lot w ill be t aken care by 100% inspect ion
2 Next lot AMW
(At t ach Ishi kaw a di agram -Cause & Ef f ect ) WHY ~ WHY... ANALYSIS Root Cause Root Cause
3 WHY ?
4 WHY ?
5 WHY ?
Approved By
M ay'08/R0
DATE : 08.10.10
CORRECTIVE ACTIONS / LONG TERM ACTION (At t ach Phot ographs of act ions t aken) Identified Root Cause from WHY-WHY analysis Butt weld Crack Corrective Actions Planned / taken Capacitor bank put in operation NA Error - Proofing Responsibility A run Tidke
Date of Im plem entation
Next lot
MONITORING EFFECTIVENESS OF CORRECTIVE ACTIONS (REVIEW) Sr Corrective Actions Taken Capacitor bank put in operation Target 05.10.10 Actual 05.10.10 Results of Action taken Date of Review Status
7A
7B
PREVENTION/LESSONS LEARNED (List ot her similar processes & product s wit h t he pot ent ial for t he same defect ) Sr 1 Processes / Products Inspection shall be carried out 100% Corrective Actions Error - Proofing Responsibility V ikrant Date of Imple
# 1 2 3 4 5 6
PROBLEM CLOSURE & SIGN-OFF PROBLEM PROGRESS SUMMARY Phase Start Date Actual Date Problem Definition Containment Action Root Cause analysis Corrective Action Solution Confirmation Closure 17.09.10 17.09.10 17.09.10 05.10.10 17.09.10 17.09.10 17.09.10 05.10.10
Closure Sign-off Team Member Function Prasshant Varia Vikrant Arun Tidke Mfg Quality Electrical
Sign-0ff
= PA GE 2OF2
(Det erminat ion of root cause, correct ive act ion & monit oring effect iveness of implement at ion) MANAGEMENT VERIFICATION & CLOSURE Sign Date Name Head MFG
Prepared By Prashant Varia FORM AT NO : F/W R/M R/007 M onth& Year Of Release with Revision level
QA & Materials
Prodn
PPC
Tool Eng.
Approved By
Other
M ay'08/R0
DATE : 08.10.2010
17.09.2010
Feedback from
AMW PDI
Problem Awareness Problem Scope New Problem Severity Safety Regulatory Functional Existing Aesthetic Reliability Reopened Others PDI Field Com plaints Dom estic / Export Line
Wheel rim line no. 5
Problem Source
Yes
Yes
WHEEL RIM
% defect 1%
Part Nos
% defect
PROBLEM DEFINITION (At t ach Phot ographic det ails of failure, At t ach T rend dat a, Paret o analy sis, Warrant y et c)
Butt wel d deep pi tti ng mar k
Start Date
End Date
17.11.2010
Responsibility
AMW
Break Point
SHORT T ERM A CT I ON:Next lot w ill be t aken care by 100% inspect ion
2 Next lot AMW
(At t ach Ishi kaw a di agram -Cause & Ef f ect ) WHY ~ WHY... ANALYSIS Root Cause Root Cause
2 WHY ?
3 WHY ?
4 WHY ?
5 WHY ?
Approved By
M ay'08/R0
DATE : 08.10.10
CORRECTIVE ACTIONS / LONG TERM ACTION (At t ach Phot ographs of act ions t aken) Identified Root Cause from WHY-WHY analysis Butt weld deep pitting mark Corrective Actions Planned / taken Reconditioning done for the top clamping blocks NA Error - Proofing Responsibility Prashant v aria
Date of Im plem entation
Next lot
MONITORING EFFECTIVENESS OF CORRECTIVE ACTIONS (REVIEW) Sr Corrective Actions Taken Reconditioning done for the top clamping blocks Target 05.10.10 Actual 05.10.10 Results of Action taken Date of Review Status
7A
7B
PREVENTION/LESSONS LEARNED (List ot her similar processes & product s wit h t he pot ent ial for t he same defect ) Sr 1 Processes / Products Inspection shall be carried out 100% Corrective Actions Error - Proofing Responsibility V ikrant Date of Imple
# 1 2 3 4 5 6
PROBLEM CLOSURE & SIGN-OFF PROBLEM PROGRESS SUMMARY Phase Start Date Actual Date Problem Definition Containment Action Root Cause analysis Corrective Action Solution Confirmation Closure 17.09.10 17.09.10 17.09.10 17.09.10 17.09.10 17.09.10 17.09.10 17.09.10
Closure Sign-off Team Member Function Prasshant Varia Vikrant Mfg Quality
Sign-0ff
= PA GE 2OF2
(Det erminat ion of root cause, correct ive act ion & monit oring effect iveness of implement at ion) MANAGEMENT VERIFICATION & CLOSURE Sign Date Name Head MFG
Prepared By Prashant Varia FORM AT NO : F/W R/M R/007 M onth& Year Of Release with Revision level
QA & Materials
Prodn
PPC
Tool Eng.
Approved By
Other
M ay'08/R0
DATE : 08.10.2010
WTK004 WTK004
17.09.2010
Feedback from
AMW PDI
Problem Awareness Problem Scope New Problem Severity Safety Regulatory Functional Existing Aesthetic Reliability Reopened Others PDI Field Com plaints Dom estic / Export Line
Wheel rim line no. 4
Problem Source
Yes
Yes
WHEEL RIM
% defect 1%
Part Nos
% defect
PROBLEM DEFINITION (At t ach Phot ographic det ails of failure, At t ach T rend dat a, Paret o analy sis, Warrant y et c)
T yr e seat ar ea bur r
Start Date
End Date
17.11.2010
Responsibility
AMW
Break Point
SHORT T ERM A CT I ON:Next lot w ill be t aken care by 100% inspect ion
2 Next lot AMW
(At t ach Ishi kaw a di agram -Cause & Ef f ect ) WHY ~ WHY... ANALYSIS Root Cause Root Cause
Jobs put in final roll form er without cleaning grinding dust. 1 WHY ?
2 WHY ?
3 WHY ?
4 WHY ?
5 WHY ?
Approved By
M ay'08/R0
DATE : 08.10.10
CORRECTIVE ACTIONS / LONG TERM ACTION (At t ach Phot ographs of act ions t aken) Identified Root Cause from WHY-WHY analysis Tyre seat area burr Corrective Actions Planned / taken Grinding dust will be cleaned before feeding jobs for final roll former. NA Error - Proofing Responsibility V ikas Garg
Date of Im plem entation
Next lot
MONITORING EFFECTIVENESS OF CORRECTIVE ACTIONS (REVIEW) Sr Corrective Actions Taken Grinding dust will be cleaned before feeding jobs for final roll former. Target 05.10.10 Actual 05.10.10 Results of Action taken Date of Review Status
7A
7B
PREVENTION/LESSONS LEARNED (List ot her similar processes & product s wit h t he pot ent ial for t he same defect ) Sr 1 Processes / Products Inspection shall be carried out 100% Corrective Actions Error - Proofing Responsibility V ikrant Date of Imple
# 1 2 3 4 5 6
PROBLEM CLOSURE & SIGN-OFF PROBLEM PROGRESS SUMMARY Phase Start Date Actual Date Problem Definition Containment Action Root Cause analysis Corrective Action Solution Confirmation Closure 17.09.10 17.09.10 17.09.10 05.10.10 17.09.10 17.09.10 17.09.10 05.10.10
Closure Sign-off Team Member Function Prasshant Varia Vikrant Mfg Quality
Sign-0ff
= PA GE 2OF2
(Det erminat ion of root cause, correct ive act ion & monit oring effect iveness of implement at ion) MANAGEMENT VERIFICATION & CLOSURE Sign Date
QA & Materials
Prodn
PPC
Tool Eng.
Approved By
Other
BOLT SHIFTED
45
BOLT SHIFTED
OVER PENETRATION
45
G DISC ASSY(WTR024)
65
Corrective Actions: Detection can be done only by visual. 1. Associates at final inspection to be taught on requirements - Resp. Mr.ChetanPatel 2. Incoming disc quality to be improved - Resp Mr.Anandha Perumal
Preventive Actions: Immediate Inspection after stiffener welding. 1. Incoming discs for stiffner welding should be free from oil-Resp.Mr.Anantha Perumal 2. Machine operator to be taught on requirements - Resp. Mr.Aravindhan 3. Patrol Inspection - Resp Mr.Chetan Patel
Corrective Actions: Detection can be done only by visual 1.Associates at rim line to be taught on requirements - Resp. Mr.Dilip 2.Associates at final inspection to be taught on requirements - Resp. Mr.ChetanPatel
Preventive Actions: Training to the operators on rim handling 1. Machine operator to be taught on requirements Resp.Mr.Dhanshuk 2. Patrol Inspection - Resp Mr.Chetan Patel
Corrective Actions: Detection can be done only by visual 1. Associates at lug welding to be taught on requirements - Resp. Mr.Dilip 2. Associates at final inspection to be taught on requirements - Resp. Mr.ChetanPatel
Corrective Actions: Detection can be done only by visual. 1. Associates at final inspection to be taught on requirements - Resp. Mr.ChetanPatel
Preventive Actions: Mistake proofing fixtures 1. Fixtures to be reconditioned - Resp Mr.Tharun / Mr.Aravindhan