Detailed Overview SAP Project System

@ Customer ABC

Presentation Index
Project System

Easy EC&O

Presentation Index

Topic
An Overview SAP Application & Modules Enterprise Structure Data in SAP An Overview Project Characteristics Project System Data Types Project System Organisation Structure Master Data Project Definition Master Data Work Breakdown Structure (WBS) Master Data Network Activity Network Activity Process Sequence Master Data Activity Elements Master Data - Milestones Related Master Data From Other Modules Project Characteristic & Phases Project Builder & Project Planning Board Date planning Resource Planning Cost planning Overhead allocation Revaluation at Actual Prices Cash management Budgeting Revenues Milestone Billing Sales Pricing & Resource Related Billing Assembly Processing Materials Commitment Management Confirmations Cross Application Time Sheet (CATS) BOM Transfer Status Management

Satyam 2008

Easy EC&O

Presentation Index Contd

Topic
Claims Management Project Versions Simulations Progress Analysis Results Analysis Period End Closing Mass Change Validation Substitution Interest Calculation Project Oriented Procurement (PROMAN) OPEN PS Archiving SAP PS Reporting Add Topics Here !! Add Topics Here !!

Satyam 2008

An Overview
SAP Application & Modules

Easy EC&O

SAP ECC 6.0 Application


Cross Application Industry Solutions

Financials

Logistics

HCM

Integrated solutions
MM

SD
Sales & Distribution

FI
Financial Accounting

Comprehensive functionality
CO

Open systems

PP

Materials Mgmt.

Controlling

AA

Production Planning

R/3
Client / Server ABAP
HR IS
Industry Solutions Human Resources

Asset Accounting

Client / server architecture

QM

PS
Project System

Designed for all types of business

Quality Mgmt. PM Plant Maintenance

WF
Workflow

Enterprise data model

Scalability

Agenda

Satyam 2008

Easy EC&O

SAP Technology Environment

Platform Independent Platform Dependent (Basis)

SAP Application Modules

R/3 Data Repository Commun ications Database User Interface

Operating System

Hardware Platform and Environment Enterprise Network


Agenda
Satyam 2008 7

Easy EC&O

Client Server Architecture

Agenda

Satyam 2008

Easy EC&O

Sample SAP System Landscape

Development
Database Servers

Testing

Production

Application Servers

Presentation Servers

Agenda

Satyam 2008

Easy EC&O

Integration ---- An Example

Projects SD Sales order

MM

MRP

FI / CO

Producti on

Purchase Req Purchase Order

Goods Receipt

Plant maintenance

Stock and consumption accounts updated


Agenda
Satyam 2008 10

SAP ECC 6.0


Enterprise structure

Easy EC&O

Enterprise Structure

Company

0001
0001 0002

Company code Purchasing organization Sales organization Plants


0001

1000

2000

3000

4000

0002

0003

0004

0005

Agenda

Satyam 2008

12

Easy EC&O

Organizational Units

Views

Levels
Group

Cost accounting External logistics

Controlling areas Sales organization Purchasing organiz.

Company codes Financial accounting Valuation areas Internal logistics


(MRP/Production)

Plants
Storage locations/batches/special stocks
Agenda
Satyam 2008 13

Inventory mgmt

Easy EC&O

Organizational Units
Operating Concern COPA

Controlling Area

COOM

COPC

ECPCA

Company Code

Focus on External Accounting

Sales Organization Focus on Sales


A A A

Plant

Focus on Manufacturing
Agenda
Satyam 2008 14

An Overview
Project - Characteristics

Easy EC&O

What is a Project?

Satyam 2008

16

Easy EC&O

Project Characteristics

Satyam 2008

17

Easy EC&O

Project Environment and Constraints

Satyam 2008

18

Easy EC&O

Project Characteristics

Projects are tasks with particular characteristics: They are usually complex, unique, and involve a high degree of risk. They have precise targets. They are limited in duration, and are cost and capacity intensive. Several departments are involved in a project. They are subject to specific quality requirements. They are of mostly strategic significance. Projects are usually an integral part of a business's commercial processes. To control all the tasks which occur as part of project execution, a projectspecific organizational form needed and it should be in a central position to the user departments involved.

Satyam 2008

19

Easy EC&O

Phases in Projects

Satyam 2008

20

Easy EC&O

Project System Functions

Project creation & structuring Planning Budgeting Controlling project status Scheduling Capacity planning Project versions Period end procedures Project reporting

Satyam 2008

21

Project System
Data Types

Easy EC&O

Data in SAP Project system

Configuration Data

Project , Budget & Settlement profiles,

Master Data

WBS Element, Network activities, Work Centre,

Transaction Data

Confirmations, POCs, Plan & Actual Dates

Agenda

Satyam 2008

23

Project System
Organisation Structure

Easy EC&O

Project System Organizational Units


RUNS ON OTHER ORG UNITS

NO ORGANISATIONAL UNITS OF ITS OWN

Project Definition

Controlling Area Company Code Business Area Profit Centre Plant

WBS Element
Controlling Area Company Code Business Area Profit Centre Plant Company Code Business Area Profit Centre Plant Technical Location Equipment Resp Cost Centre Investment Program Joint Venture

Network Header

Material Components
Purchasing Organization Purchasing Group Plant Storage Location

Internally Processed Activities


Plant Work Center Business Area Profit Center

Externally Processed Activities


Purchasing Organization Purchasing Group Plant Business Area Profit Center

General Cost Activities


Plant Business Area Profit Center

Agenda

Satyam 2008

25

Master Data
Project Definition

Easy EC&O

Project Definition:

The binding framework for all organizational element created within a project. Start and end dates for the project can also be defined. Project responsibility can be defined Carries default data for WBS Elements Specifies the Budget settings Specifies the project number and WBS Element numbering Allows / Dis-allows project specific stock valuation

Agenda

Satyam 2008

27

Easy EC&O

Project Definition

Numbering Project Numbering & Coding Masks

Project Definition

Settings Field Requirements Project Profile

Responsibilities Dates

Organisational Data

Satyam 2008

28

Easy EC&O

Project Definition & Work Breakdown Structure

Agenda

Satyam 2008

29

Easy EC&O

Project Coding Masks and Special Characters

Agenda

Satyam 2008

30

Easy EC&O

Project Profile

Satyam 2008

31

Master Data
Work Breakdown Structure (WBS) Element

Easy EC&O

Work Breakdown Structure

Organisation & Responsibilities

Work Breakdown Structures


Operative Indicators

Structure Objects

Documentation

Satyam 2008

33

Easy EC&O

WBS Element - Functions

Agenda

Satyam 2008

34

Easy EC&O

What Is a Work Breakdown Structure Used For?

Satyam 2008

35

Easy EC&O

Sample Project Structure

PROJECT DEFINITION (WBS #)

WBS LEVEL 1 (BUILD WHAREHOUSE)

WBS LEVEL 2 (Design)

WBS LEVEL 2 (Cost Estimate)

WBS LEVEL 2 (Build)

NETWORK (Site Prep)

NETWORK (Initiate Construction)

NETWORK (Evaluate Bids)

ACTIVITY (Grading)

ACTIVITY (Perk Testing)

Satyam 2008

36

Easy EC&O

WBS Elements Operative Indicators and Organizational Data

Agenda

Satyam 2008

37

Easy EC&O

Sample Project Structure with WBS

Agenda

Satyam 2008

38

Easy EC&O

Assigned Objects

Satyam 2008

39

Easy EC&O

Project Documentation

Satyam 2008

40

Easy EC&O

Different Ways of Creating Work Breakdown Structures

Satyam 2008

41

Easy EC&O

Derivation of the WBS Hierarchy Structure

Satyam 2008

42

Easy EC&O

Hierarchy Graphic

Agenda

Satyam 2008

43

Easy EC&O

User-Defined Fields in WBS Elements

Satyam 2008

44

Easy EC&O

WBS Master Data Process Flow

Satyam 2008

45

Master Data
Network activity

Easy EC&O

What Are Activities and Networks Used For?

Satyam 2008

47

Easy EC&O

Different Ways of Creating Networks

Satyam 2008

48

Easy EC&O

Standard Structures

Satyam 2008

49

Easy EC&O

Copying Projects from Templates

Satyam 2008

50

Easy EC&O

Templates of Project Structures

Standardization is one method of ensuring in the initial phase that projects are structured efficiently and economically. By defining standard projects and networks, we can standardize project management in a company by referring back to data that has been derived from existing projects. A further advantage of standardizing project structures is that it makes the processing of projects more transparent, enables the comparison of projects and subsequently facilitates project controlling. In Project System, there are several different standard structures that you can use as templates to create operative structures. Standard networks for creating networks, Standard project definitions for creating project definitions and Standard work breakdown structures for creating work breakdown structures.

Satyam 2008

51

Easy EC&O

Templates of Project Structures

Standard Project Definition

Standard WBS Hierarchy

Standard work breakdown structures are neutral project structures that can be used as templates to create other standard or operative work breakdown structures. A standard WBS has the individual tasks (WBS elements) by which the project is structured, as well as general organization data.
Satyam 2008 52

Easy EC&O

Network Type and Network Profile

Satyam 2008

53

Easy EC&O

Network Activities
External Processing:  Purchasing of work / services

Internal Processing:  Work / Services performed inhouse

Costs Activity:  Planning of additional primary costs

Services:  Purchasing of services with service specifications


Satyam 2008 54

Easy EC&O

Network Activities - Functions

Agenda

Satyam 2008

55

Easy EC&O

WBS Structure and Networks - Example

WBS
13 1000

Network
1100

13-1

13-2

13-3

13-4

1050 1060

3000

1140 13-1-1 13-1-2 13-2-1 13-2-2 2000 1050 1030 1060 1100 1080 3000 1120

1170

1000 1000 1080 1030 1120

1140

1170

2000

13 Elevator 13-1 Engineering 13-1-1 Elec.parts 13-1-2 Mech.parts

13-2 Procurement 13-2-1 Elec.parts 13-2-2 Mech.parts

13-3 Assembly 13-4 Insurance

1060Procurement::Motor 1000 Layout 1100Procurement: Elec. 1030 Engineering: parts Mech.parts 1140 Assembly 1050 Engineering: Elec.parts 2000 Acceptance 1120 Procurement:: Car 1170 Release 1080 Procurement: 3000 Insurance Mech.parts

Agenda

Satyam 2008

56

Easy EC&O

Project Structures Assignment

Satyam 2008

57

Easy EC&O

Assignment of WBS

Agenda

Satyam 2008

58

Easy EC&O

Networks

 Network represents the flow of a project or of a task within a project  Various structural elements can be graphically displayed for a project and their interdependencies in Project System.  Networks are used as a basis for planning, analyzing, controlling and monitoring schedules, dates and resources (such as people, machines, PRTs, materials, documents and drawings).  Networks can be assigned to a project or a sales document, such as a sales order.  A network is a special type of work order that has the same structure as production orders, maintenance orders, and inspection orders in the ERP system.  Network consists of the following:  Activities  Activity Elements  Relationships
Agenda
Satyam 2008 59

Easy EC&O

Network Structure

Agenda

Satyam 2008

60

Easy EC&O

Network Activities

Agenda

Satyam 2008

61

Easy EC&O

Network Structure with Activities

Satyam 2008

62

Easy EC&O

Sub Networks

Satyam 2008

63

Easy EC&O

Activity Relationships

Agenda

Satyam 2008

64

Easy EC&O

Network Maintenance Options

Satyam 2008

65

Easy EC&O

Network Structure Graphic

Agenda

Satyam 2008

66

Easy EC&O

Network Structure Graphic Additional Functions

Satyam 2008

67

Easy EC&O

Internal Activity Details and Work Center

Satyam 2008

68

Easy EC&O

External Processing Details

Satyam 2008

69

Network Activity
Process Sequence

Easy EC&O

Internal processing

Agenda

Satyam 2008

71

Easy EC&O

External Processing/Services

Satyam 2008

72

Master Data
Activity elements

Easy EC&O

Activities and Activity Elements

Four Types of Activities


Internal Processing External Processing Costs, services General Cost Activities
Internal External

Reference Dates from Activity


Start or Finish

Activity Elements
Work External Costs Service
General Costs Service

Satyam 2008

74

Easy EC&O

Activity Elements - Functions

Agenda

Satyam 2008

75

Master Data
Milestones

Easy EC&O

Milestone Functions (for WBS)

Agenda

Satyam 2008

77

Easy EC&O

Milestone Functions

Satyam 2008

78

Easy EC&O

Activity Milestones

Satyam 2008

79

Easy EC&O

Milestones Usage

Satyam 2008

80

Easy EC&O

PS Texts, Documents, Milestones

Agenda

Satyam 2008

81

Related Master Data


From other modules

Easy EC&O

Project System Master Data Integration

Related master data from other modules

Materials - MM Service Specifications - MM Work Centre - PP Production Resources & Tools - PP Activity Type - CO Cost, Revenue & Secondary Cost Elements - CO Statistical Key Figures - CO Cost Centers - CO Equipment - PM Functional Location - PM Employee master - HR
Agenda
Satyam 2008 83

Project Characteristics & Phases

Easy EC&O

Project System - Characteristics

Agenda

Satyam 2008

85

Easy EC&O

Aspects of Project Execution

Satyam 2008

86

Easy EC&O

Phases in a Project (Customer Project)

Agenda

Satyam 2008

87

Project Builder & Project Planning Board


Central transactions

Easy EC&O

Project Builder & Project Planning Board

Project Builder   Primarily used for creating & maintenance of structures Single window transaction

Project Planning Board:   Primarily used for scheduling and resource planning Based on Gantt chart

Agenda

Satyam 2008

89

Easy EC&O

Project Builder

Satyam 2008

90

Easy EC&O

Project Builder

Agenda

Satyam 2008

91

Easy EC&O

Project Planning Board

Agenda

Satyam 2008

92

Easy EC&O

Project Planning Board: Integration

Agenda

Satyam 2008

93

Project Processes
Date Planning

Easy EC&O

Date Planning

In this component you plan and check dates in the Project System. The purpose of date scheduling is to determine the duration, schedule dates, float times and critical paths. You enter dates in the work breakdown structures and individual networks. You can check and change them in all stages of a project.

  

Agenda

Satyam 2008

95

Easy EC&O

Where do you Maintain Dates in Project System

Project Dates
Project definition


BASIC DATES

WBS elements

  

BASIC DATES FORECAST DATES Scheduled dates Actual dates BASIC DATES Scheduled dates Actual dates CONSTRAINTS Earliest (scheduled) dates Latest (scheduled) dates Actual dates

Network header

  

Network activity

  

Activity element
SAP AG 2003

  

Earliest (scheduled) dates Latest (scheduled) dates Actual dates

BOLD = Manual planning dates Italics = Dates calculated by the system

Agenda

Satyam 2008

96

Easy EC&O

Function of Dates

Dates (1)
Planning form

Sets of dates
 Basic dates  Forecast dates  Actual dates

Scheduling

Scheduled start/finish

Check dates
WBS/ WBS WBS/ network

Planning different calendars


Monday Monday Monday May 30 Not a workday

Inherit

1
Extrapolation
+ +

Shift

SAP AG 2003

Agenda

Satyam 2008

97

Easy EC&O

Actual Dates

Satyam 2008

98

Easy EC&O

Scheduling

How is scheduling carried out in Project system?


 Scheduling the Work Breakdown Structure The system calculates the dates for an entire project or a portion of the project (sub tree) with all associated activities when you select the scheduling function. Scheduling the Overall Network In overall network scheduling, the system schedules all networks which are linked with relationships Project Scheduling In project scheduling you can schedule the project with all assigned activities, as in WBS scheduling. Additionally you can decide whether just networks are scheduled or whether service and maintenance orders are also scheduled. Network Scheduling Scheduling determines the earliest and latest start and finish dates for carrying out activities in the network and calculates the required capacity requirements as well as the slack time or "floats".

Agenda

Satyam 2008

99

Easy EC&O

Scheduling

Scheduling

Earliest/latest dates relationship


Scheduled start/finish Network header

Earliest/latest activity dates

Buffer
B A
E

- Forward scheduling - Backward scheduling - Scheduling from current date - No scheduling

Capacity requirements for each activity


Activity element Activity element

Requirements date Material


Scheduled date Milestone
SAP AG 2003

Earliest/latest dates activity element

Agenda

Satyam 2008

100

Easy EC&O

Scheduling

WBS / Overall Network Scheduling

Network scheduling

WBS scheduling

Scheduling of the overall network

SAP AG 2003

Agenda

Satyam 2008

101

Easy EC&O

Bottom-Up Planning
Project planning board
WBS
P
Extrapolate Dates Automatically

P1

P2

P1

P2

20 10 30 40 50

60 80 70

10 20 30 40 50 60 70 80
Basic dates in project definition
Satyam 2008 102

Network 1

Network 2

Easy EC&O

Scheduling Scenarios

Agenda

Satyam 2008

103

Easy EC&O

Scheduling Floats
20 3 3 10 1 1 2D 2 2 6D 8 8 50 9 9

30 3 4

2D 4 5

40 5 6

3D 7 8

3D 11 11

10 20 30 40 50 1 2 3 4 5 6 7 8 9 10 11 12 13 Days

Earliest Start Date

Earliest Finish Date

10 1 1
Latest Start Date

2D 2 2
Latest Finish Date

Legend
Satyam 2008 104

Easy EC&O

Time Constraints

1
Before

Start

2
Before

Start

Finish

After

After

For activities, time constraints set 1. An exact start / finish 2. The earliest value limit
( ( = must) = not before)

Satyam 2008

105

Project Processes
Resource Planning

Easy EC&O

Resources

This component is used to plan the resources required for the work that is carried out internally in a project. i.e. the work that is not procured externally via purchasing You specify the work and the work center where this work is to be carried out in the internally processed network activity. During scheduling the system determines the capacity requirements for the project. In projects the most important resource is the project staff. Workforce Planning enables you to distribute work from network activities to people, positions, and HR organization units according to periods.

   

Agenda

Satyam 2008

107

Easy EC&O

Resources

Agenda

Satyam 2008

108

Easy EC&O

Resource planning

Agenda

Satyam 2008

109

Easy EC&O

Workforce planning

Agenda

Satyam 2008

110

Easy EC&O

Internal Processing
Work: 500hrs Output provided to complete activities

1200
Organisational unit Where an activity is carried out or work output is provided.

Work Center

Scheduling Data

Capacity Available

Cost Center
Responsible Persons Cost Center Data

Satyam 2008

111

Easy EC&O

External Processing
Work Performed by a third party (Vendor) 1300
Description Material Group Purchasing Group Quantity & Unit Price per Unit
Entry of Services performed PO Processing Invoice Verfication

PR Committments
Purchase Requisition Bid Invitation

Actual Costs
Good Receipt / Service Receipt

Quotation Entry

Vendor Selection

Vendor
Purchase Order

1000

PO Committments

Satyam 2008

112

Project Processes
Cost Planning

Easy EC&O

Project Processes

Transactional data
Date Planning Resource Planning Cost Planning Budgets Sales Pricing & Resource Related Billing Revenues Purchasing Confirmations Time Booking (Cross Application Time Sheet) Milestone Billing BOM Transfers Status Management Claim Management Simulations Overhead Allocation Progress Analysis Result Analysis Project Closing & Period Settlements

Agenda

Satyam 2008

114

Easy EC&O

Cost planning

 

Purpose: To plan, monitor and control project costs Integration: The component is tightly integrated with other SAP Modules, such as 1. 2. 3. 4. CO - Controlling FI - Financial Accounting PP - Production Planning and Control MM - Materials Management

Agenda

Satyam 2008

115

Easy EC&O

Cost Planning in Projects

Agenda

Satyam 2008

116

Easy EC&O

Network Costing

Agenda

Satyam 2008

117

Easy EC&O

Network Costing Paths

Satyam 2008

118

Easy EC&O

Header-Assigned Networks

Satyam 2008

119

Easy EC&O

Activity-Assigned Networks

Satyam 2008

120

Easy EC&O

Project Cost Planning Using Activities

Satyam 2008

121

Easy EC&O

Cost Planning Using Cost Activities

Satyam 2008

122

Easy EC&O

Costs Activity Details

Satyam 2008

123

Easy EC&O

Invoicing Plan

Satyam 2008

124

Easy EC&O

Easy Cost Planning

Agenda

Satyam 2008

125

Easy EC&O

Execution Services

Satyam 2008

126

Easy EC&O

Planned Internal Activity Costs

Satyam 2008

127

Easy EC&O

Project: Assignment of Orders

Satyam 2008

128

Easy EC&O

Appended and Apportioned Orders

Satyam 2008

129

Easy EC&O

Tables for Order Values

Satyam 2008

130

Easy EC&O

Costing Parameters for: Network

Satyam 2008

131

Easy EC&O

Costing Variant: Valuation Variant

Satyam 2008

132

Easy EC&O

Order Categories and Order Types

Satyam 2008

133

Easy EC&O

Process Costs for Projects

Satyam 2008

134

Easy EC&O

Process - Definition and Rate

Satyam 2008

135

Easy EC&O

Cost integration using account assignment

Satyam 2008

136

Easy EC&O

Cost integration using account assignment

Satyam 2008

137

Easy EC&O

Cost Forecast : function

Satyam 2008

138

Project Processes
Overhead Allocation

Easy EC&O

Project Processes

Transactional data
Date Planning Resource Planning Cost Planning Budgets Sales Pricing & Resource Related Billing Revenues Purchasing Confirmations Time Booking (Cross Application Time Sheet) Milestone Billing BOM Transfers Status Management Claim Management Simulations Overhead Allocation Progress Analysis Result Analysis Project Closing & Period Settlements

Agenda

Satyam 2008

140

Easy EC&O

Overhead Calculation

Agenda

Satyam 2008

141

Easy EC&O

Overheads

Satyam 2008

142

Easy EC&O

Costing Sheet

Satyam 2008

143

Project Processes
Activity Type Revaluation at Actual Prices

Easy EC&O

Revaluation at Actual Prices

Satyam 2008

145

Easy EC&O

Revaluation at Actual Prices

Satyam 2008

146

Project Processes
Cash Management

Easy EC&O

PS Cash Management

Project Cash Management enables you to look at project-related payment flows by supplying information on the timing of payments into and out of your project. It also plans and monitors the payment flow from the project point of view. Project Cash Management thus differs from Cash Budget Management and Cash Management in Treasury (TR), which monitor the payment flow for the whole business.

 

Satyam 2008

148

Easy EC&O

PS Cash Management

Satyam 2008

149

Project Processes
Budgeting

Easy EC&O

Planning versus Budgeting

Planning
 Externally Financed Projects  Cost -oriented (cost elements , plan versions, period values)  Easily changed; line items created if desired  No availability check

Budgeting
 Internally Financed Projects Funds -oriented (original, supplements, returns , annual values)  Binding values; line items for each change  Availability check: For eg. Warning at 95% Error message at 110%

"FUNDS REQUESTED"

"APPROVED FUNDS"

Satyam 2008

151

Easy EC&O

Cost Planning and Budgeting

Agenda

Satyam 2008

152

Easy EC&O

Budgeting Overview

Agenda

Satyam 2008

153

Easy EC&O

Availability Control
No more Funds available!!

WBS 1.1.1

Business Events
Invoice

Budget Comm Actual Total 2003 2004 50 30 20 10 5 5 40 25 15

Availability check

Checks overall funds available

Purchase order Purchase Requisition

Satyam 2008

154

Easy EC&O

Availability Control
Budget 200 000

Budget 120 000 Actual 80 000

Budget

80 000 At 110% budget completion, An error message is Posted by the system and mail Sent to the responsible person.

76 000 Assigned 101 000

Commitments 25 000

Activities 76 000 At 95% budget completion, A warning message is Posted by the system. NOTE: Percentages differ across project processes

Actual costs 80,000

Commitments
(purchase order, purchase requisition, funds reservation)

Networks / Orders 76,000 Items within budget are Successfully posted.

25,000

CO

MM

PS

PM
Satyam 2008 155

Easy EC&O

Assigned Funds & Availability Control

Agenda

Satyam 2008

156

Easy EC&O

Budget Distribution from Investment Management

Satyam 2008

157

Project Processes
Revenues

Easy EC&O

Revenue Planning

Satyam 2008

159

Easy EC&O

Revenue Planning : Overview

Satyam 2008

160

Easy EC&O

Manual Revenue Planning

Satyam 2008

161

Easy EC&O

Creating Billing Plans

Satyam 2008

162

Easy EC&O

Billing Plan: Structure

Satyam 2008

163

Easy EC&O

Account Assignment in Sales Document

Satyam 2008

164

Easy EC&O

Sales Order and Billing Plan

Agenda

Satyam 2008

165

Easy EC&O

Sales Document Structure

Satyam 2008

166

Easy EC&O

Functions in Sales Orders

Satyam 2008

167

Easy EC&O

Item Categories

Satyam 2008

168

Easy EC&O

Requirements Determination

Satyam 2008

169

Easy EC&O

Requirement Class

Satyam 2008

170

Easy EC&O

Account Assignment Categories

Satyam 2008

171

Easy EC&O

SD: Account Assignment and Processes

Satyam 2008

172

Project Processes
Milestone Billing

Easy EC&O

Project processes

Transactional data
Date Planning Resource Planning Cost Planning Budgets Sales Pricing & Resource Related Billing Revenues Purchasing Confirmations Time Booking (Cross Application Time Sheet) Milestone Billing BOM Transfers Status Management Claim Management Simulations Overhead Allocation Progress Analysis Result Analysis Project Closing & Period Settlements

Agenda

Satyam 2008

174

Easy EC&O

Milestone billing

Agenda

Satyam 2008

175

Easy EC&O

Milestone billing

Agenda

Satyam 2008

176

Easy EC&O

Milestone Billing Plan in Projects

Satyam 2008

177

Easy EC&O

Billing Plan in Sales Documents

Satyam 2008

178

Project Processes
Sales Pricing & Resource Related Billing

Easy EC&O

Project processes

Transactional data
Date Planning Resource Planning Cost Planning Budgets Sales Pricing & Resource Related Billing Revenues Purchasing Confirmations Time Booking (Cross Application Time Sheet) Milestone Billing BOM Transfers Status Management Claim Management Simulations Overhead Allocation Progress Analysis Result Analysis Project Closing & Period Settlements

Agenda

Satyam 2008

180

Easy EC&O

Sales Pricing

Agenda

Satyam 2008

181

Easy EC&O

Sales Pricing Views

Satyam 2008

182

Easy EC&O

Dynamic Item Processor

Satyam 2008

183

Easy EC&O

Customizing: DIP Profile

Satyam 2008

184

Easy EC&O

Resource-Related Billing

Satyam 2008

185

Easy EC&O

Resource-Related Structure

Satyam 2008

186

Project Processes
Assembly Processing

Easy EC&O

Automatic Creation of WBS Elements Assembly Processing

Satyam 2008

188

Easy EC&O

Assembly Processing with WBS

Satyam 2008

189

Easy EC&O

Assembly Processing

Satyam 2008

190

Project Processes
Materials

Easy EC&O

Materials Planning

Purpose To monitor the material requirements and costs in projects, to control the flow of materials and for scheduling. Integration Material forms a link from a project to Sales, Materials Management (Purchasing and Inventory Management), and Production Planning and Control. Material requirements in projects form the basis for procurement, whether the material is produced in-house (production) or procured externally (purchasing). Materials can be attached to the activities  Directly  Through BOM

Agenda

Satyam 2008

192

Easy EC&O

Materials

Satyam 2008

193

Easy EC&O

Materials in Projects

Satyam 2008

194

Easy EC&O

Integration with MM and PP

Satyam 2008

195

Easy EC&O

Purchasing Process

Agenda

Satyam 2008

196

Easy EC&O

Direct Procurement

Satyam 2008

197

Easy EC&O

Purchasing Non-stock Components

Satyam 2008

198

Easy EC&O

Procurement Using Requirements Planning

Satyam 2008

199

Easy EC&O

Managing Stocks of Material Components

Satyam 2008

200

Easy EC&O

Collective Stock: Quantities and Values

Satyam 2008

201

Easy EC&O

Valuated Project Stock: Quantities and Values

Satyam 2008

202

Easy EC&O

Non-Valuated Project Stock: Quantities and Values

Satyam 2008

203

Easy EC&O

Third-Party Orders

Satyam 2008

204

Easy EC&O

Integration with MM
Definition 2000 3000 6000 4000 5000 Item Category
Material required for performing an activity or for manufacturing a product.

1000

Materials Materials Materials

Project Stock

Plant Stock

Non Stock

Stock Item L

Stock Item L

Non-Stock Item N

Purchase Req.

Reservation

Purchase Req.

MM
Satyam 2008 205

Easy EC&O

Services
2000 3000 6000 4000 5000

1000

Services
Allows you to define services to be procured. Individual service specifications can be created for each planned procurement in the Purchasing document.

Services
Description Material Group Purchasing Group Service Specifications

Service Number Planned Services Service Master Or text / value Unplanned Services

Value Limit

Vendor 1000
Purchase Order

Purchase Requisition

Value Check

Satyam 2008

206

Easy EC&O

External Services Management


2000 3000 6000 4000 5000
Actual Costs
Invoice Verification Purchase Requisition Bid Invitation

1000

PR Commitments

Services

Services Finally Complete

Item Category D
PO Processing

Quotation Entry

Service Entry Sheet

Vendor Selection

PO Commitments

Satyam 2008

207

Easy EC&O

Account Assignment Categories

Satyam 2008

208

Easy EC&O

Valuation of Project and Sales Order Stock

Satyam 2008

209

Easy EC&O

Tables for MM Integration

Satyam 2008

210

Easy EC&O

External Processing

Agenda

Satyam 2008

211

Project Processes
Commitment Management

Easy EC&O

Commitment Management
PS PS PS

2000 1000 4000 Materials Materials Materials

3000 6000 5000 1000

2000

3000 6000 1000

2000

3000 6000

4000 Services Materials Materials

5000

4000 Notifications Materials Materials

5000

Materials

Services

Claims Notifications

MM

Purchase Req

Purchase Order

WBS Element DS-0310001: General C/Elem 4000000 Committed 6000 Actual 5000 Assigned 11000
Satyam 2008 213

Easy EC&O
MM

Commitment Management

Purchase Requisition

WBS Element DS-0310001: Server C/Elem


Purchase Order

Committed 6000

Actual 5000

Assigned 11000

4000000

WBS Element DS-0310001: Server C/Elem


Goods Receipt

Committed 0

Actual 11000

Assigned 11000

4000000

Commitment management allows you an early recording and analysis of such commitments for their cost and financial effects.
Satyam 2008

214

Project Processes
Confirmations

Easy EC&O

Confirmation Options

Agenda

Satyam 2008

216

Easy EC&O

Confirmation
Confirmations document the state of processing for activities and activity elements in a network. It can be used to forecast progress in the future. Precise confirmations are very important for realistic and accurate project planning.

  

Features: You control the following business functions via confirmations:  Reduction of work center capacity load  Update of the actual costs based on the confirmed data  Update of network data, such as duration, work, and status  Update of dates for WBS elements  Copy actual dates to milestone (depending on degree of progress)  Removal of the billing block in the billing plan  Backflushing and unplanned withdrawals of material components  Posting of open reservations  Activation of milestone functions

Agenda

Satyam 2008

217

Project Processes
Cross Application Time Sheet (CATS)

Easy EC&O

Cross application time sheets (CATS)

Agenda

Satyam 2008

219

Project Processes
BOM Transfer

Easy EC&O

Project processes

Transactional data
Date Planning Resource Planning Cost Planning Budgets Sales Pricing & Resource Related Billing Revenues Purchasing Confirmations Time Booking (Cross Application Time Sheet) Milestone Billing BOM Transfers Status Management Claim Management Simulations Overhead Allocation Progress Analysis Result Analysis Project Closing & Period Settlements

Agenda

Satyam 2008

221

Easy EC&O

Transferring BOMs

Agenda

Satyam 2008

222

Project Processes
Status Management

Easy EC&O

System Status and User Status

Agenda

Satyam 2008

224

Easy EC&O

Status Function

Agenda

Satyam 2008

225

Easy EC&O

System Status

The following status are set by the system/user as the project goes through Its different stages: CRTD Created (Automatic) REL Released (Manual) LKD Locked (Manual) UNLK Unlock (Manual) BUDG Project Budgeted (Automatic) AVAC Availability Control Activated (Automatic) TECO (Manual)

Satyam 2008

226

Easy EC&O

Status Profile

Agenda

Satyam 2008

227

Project Processes
Claims Management

Easy EC&O

Project Processes

Transactional data
Date Planning Resource Planning Cost Planning Budgets Sales Pricing & Resource Related Billing Revenues Purchasing Confirmations Time Booking (Cross Application Time Sheet) Milestone Billing BOM Transfers Status Management Claim Management Simulations Overhead Allocation Progress Analysis Result Analysis Project Closing & Period Settlements

Agenda

Satyam 2008

229

Easy EC&O

Claims

Agenda

Satyam 2008

230

Easy EC&O

Claim Management Functions

Satyam 2008

231

Easy EC&O

Claim Data

Satyam 2008

232

Easy EC&O

Connecting a Cost Collector to a Claim

Satyam 2008

233

Easy EC&O

Customizing for Claims

Satyam 2008

234

Easy EC&O

Cost integration of claims

Agenda

Satyam 2008

235

Easy EC&O

Evaluation of Claims

Satyam 2008

236

Project Processes
Project Versions

Easy EC&O

Creating Project Versions

Satyam 2008

238

Easy EC&O

Versions in the Project System

Satyam 2008

239

Easy EC&O

Project Versions

      

A project version shows the state of the project at a certain point in time or at a certain status. Are the basis for statistical evaluations, for example, in earned value analysis. Can be used in Milestone Trend Analysis. Document (as a history) the state of the project in the past. Can be used for comparison purposes. Project versions are a "snapshot" of a project at a certain point in time. Plan versions are created in accounting and store the various costs plans for a project, such as best and worst case scenarios.

Satyam 2008

240

Project Processes
Simulations

Easy EC&O

Simulation Version

When you are planning complex projects, for instance in engineering-to-order, it is often necessary to simulate and save changes to a project, without affecting the operative project. To do so, you use simulation versions that can be changed, costed and scheduled.

Agenda

Satyam 2008

242

Easy EC&O

Simulation Versions - Flow

Agenda

Satyam 2008

243

Easy EC&O

Simulation Version Key & Profile

Satyam 2008

244

Easy EC&O

Version Keys and Simulation Profiles

Satyam 2008

245

Easy EC&O

Evaluation of Simulation Versions

Agenda

Satyam 2008

246

Project Processes
Progress Analysis

Easy EC&O

Project Progress

  

You use the planning phase of your project to plan how you want your project to progress. However, errors in planning or unforeseen events may cause the project to vary from the plan. The project objective will then only be achieved if project management identifies these variances early on and takes prompt action to correct them. To this end, project management requires constant access to current information about:  Project status The state of the project at a particular time, as derived from actual data on costs, dates, and capacities.  Project progress The progress of the project towards achieving its goal, as of a particular time, compared with planning Expected project development

Agenda

Satyam 2008

248

Easy EC&O

Progress Analysis : Basic Concepts

Agenda

Satyam 2008

249

Easy EC&O

Progress Value Determination: Measurement Methods

Agenda

Satyam 2008

250

Easy EC&O

Progress Determination : Function

Agenda

Satyam 2008

251

Easy EC&O

Project Progress / Analysis

Progress Analysis

 Progress Analysis/ Earned Value

 Cost-to-Complete Cost-to-Complete Milestond Trend Analysis Progress Tracking

 Milestone Trend Analysis

X X

 Progress Tracking

Agenda

Satyam 2008

252

Easy EC&O

Progress Analysis

 

Progress analysis is the tool used to determine planned and actual project progress values, and to compare the two sets of data. The system uses the overall planned costs to evaluate the work done, meaning that the evaluation is not dependent on the costs planned or posted by period.

Agenda

Satyam 2008

253

Easy EC&O

Earned Value Management (EVM)

Common terminologies in EVM  Planned POC : How far should my project progress by a particular point in time?         BCWS: Budgeted cost of work scheduled Actual percentage of completion (POC): How far has my project actually progressed? BCWP : What is the planned value of the actual work performed? ACWP: What costs have already been incurred for the project? SV = BCWP BCWS: Are schedule variances occurring? CV = BCWP ACWP : What are the costs resulting from schedule variances? CPI = BCWP /ACWP : How accurate was my planning? EAC: What are the total costs to be expected if the cost variance continues?
Agenda
Satyam 2008 254

Easy EC&O

Progress Analysis: Calculation

Agenda

Satyam 2008

255

Project Processes
Results Analysis

Easy EC&O

Result Analysis : Objective

Agenda

Satyam 2008

257

Easy EC&O

Overview of Result Analysis

Agenda

Satyam 2008

258

Project Processes
Period End Closing

Easy EC&O

Period End Closing Procedures

Agenda

Satyam 2008

260

Easy EC&O

Aspects of Settlement

Agenda

Satyam 2008

261

Easy EC&O

Settlement Scenarios

Agenda

Satyam 2008

262

Easy EC&O

Multi-Level Settlement : Direct Settlement

Agenda

Satyam 2008

263

Easy EC&O

Periodic Settlement Processing Investment Projects


2 Final Settlement to Fixed Assets

1 Periodic Settlement to AUC

Asset Under Construction

Final Asset

Satyam 2008

264

Easy EC&O

Generating Settlement Rule for a WBS

Satyam 2008

265

Easy EC&O

Determine Settlement Strategy for WBS Element

Satyam 2008

266

Easy EC&O

Deriving Settlement Rules for Activities

Satyam 2008

267

Easy EC&O

Indicators in the Settlement Profile

Satyam 2008

268

Easy EC&O

Settlement: Debit and Credit

Satyam 2008

269

Easy EC&O

Maintaining Settlement Rules

Satyam 2008

270

Easy EC&O

Settlement Structure

Satyam 2008

271

Easy EC&O

PA Settlement Structure

Satyam 2008

272

Easy EC&O

Assets Under Construction Flow Chart

START

Capital Project

Create Investement Profile on Project

Release

Is this a capital project?

Yes

Create AUC

Monthly Sttlmnt settles capital WBS to AUC

Monthly Sttlmnt settles non-capital to exp receiver

Create NonCapital WBS Elements

No

END

Closed and ready for depreciation

Project Completed

All asset under AUC final

Changes status from AUC to TECO

Finished Building

Satyam 2008

273

Easy EC&O

Project Closing Case Flow Diagram


Final Settlement from AUC to Assets Reduce released budget

Return Original Budget

Delete unused WBS Elements

Clear Project Stock

Update all WBS Elements to TECO

Close project definition

Perform Budget Return check


Satyam 2008 274

Easy EC&O

Schedule Manager

Satyam 2008

275

Project Processes
Mass Change

Easy EC&O

Mass Change

Satyam 2008

277

Easy EC&O

Mass Change

Satyam 2008

278

Project Processes
Validation

Easy EC&O

Validation

Satyam 2008

280

Project Processes
Substitution

Easy EC&O

Substitution

Satyam 2008

282

Project Processes
Interest Calculation

Easy EC&O

Interest Calculation

Satyam 2008

284

Project Processes
Project Oriented Procurement (PROMAN)

Easy EC&O

Project- Oriented Procurement Proman

Satyam 2008

286

Project Processes
Open PS

Easy EC&O

Open PS

Satyam 2008

288

Project Processes
Archiving

Easy EC&O

Benefits of Archiving

Satyam 2008

290

Easy EC&O

Purpose of Archiving Objects

Satyam 2008

291

Easy EC&O Archiving Steps

Satyam 2008

292

Easy EC&O

Deleting Without Archiving

Satyam 2008

293

Easy EC&O

Archiving Objects

Satyam 2008

294

Reports & Analysis


SAP PS reporting

Easy EC&O

Project System Information System

Agenda

Satyam 2008

296

Easy EC&O

Information Systems

Purpose
   The Project Information System is a flexible, comprehensive information System. you can use to monitor and control your project data. You can evaluate individual projects, partial projects, or multiple projects.

Features  You can run recurring standard reports and create your own reports to meet your specific information needs and tasks.  You can display all data in the information system immediately after entering it or can run the reports in the background.  This also includes reports offering different degrees of detail, summarizations, and views of current data, version data, and archive data for: Structures Controlling Progress Resources Material
Agenda
Satyam 2008 297

Easy EC&O

Structure Overview and Individual Overviews

Satyam 2008

298

Easy EC&O

Structure Information System: Functions

Agenda

Satyam 2008

299

Easy EC&O

Structure Information System : Graphical Evaluation and Data Export

Agenda

Satyam 2008

300

Easy EC&O

Hierarchy Reports

Satyam 2008

301

Easy EC&O

Cost Element Reports

Agenda

Satyam 2008

302

Easy EC&O

Evaluation Using Cost Reports

Satyam 2008

303

Easy EC&O

SAP Business Information Warehouse

Satyam 2008

304

Easy EC&O

Line Item Reports

Agenda

Satyam 2008

305

Easy EC&O

Information Systems

Satyam 2008

306

Easy EC&O

Level of Detail

Satyam 2008

307

Easy EC&O

Evaluation Using Cost Reports

Satyam 2008

308

Easy EC&O

Agenda

Satyam 2008

309

Easy EC&O

Thank you!

Indrajit

+91 9052230808

Indrajit_Das@satyam.com

Chinnababu

+91 9000525299

Chinnababu_Chavakula@satyam.com

Agenda

Satyam 2008

310

Easy EC&O

Safe harbor

Satyam 2008
This is solely for the use of Satyam only. Without prior permission, no part of it may be circulated, quoted or reproduced outside of the organization. satyam.com

Agenda

Satyam 2008

311