Professional Documents
Culture Documents
Group 9 Bipul Megotia Gaurav Kataria Jammy Maisnam Kaavish Kidwai Neer Prajapati
Production Planning
Scheduling production Manufacturing production Controlling production activities
Capacity and Aggregate Production Plans End Item (SKU) Demand Master Production Scheduling
(Plan. Hor.: a few months, Time Unit: 1 week)
SKU-level Production Plans Manufacturing and Procurement lead times Part process plans Materials Requirement Planning
(Plan. Hor.: a few months, Time Unit: 1 week)
Component Production lots and due dates Shop floor-level Production Control
(Plan. Hor.: a day or a shift, Time Unit: real-time)
Solution Approaches
Graphical Approaches: Spreadsheet-based simulation Analytical Approaches: Mathematical (mainly linear programming) Programming formulations
A prototype problem
Forecasted demand: Jan: 1280 Feb: 640 Mar: 900 Apr: 1200 May:2000 Jun: 1400 On-hand Inventory: 500 Required on-hand Inventory at end of June: 600 Current Workforce Level: 300 Worker prod.capacity: 0.14653 units/day Working days per month Jan: 20 Feb: 24 Mar: 18 Apr: 26 May: 22 Jun: 15
Cost structure: Inv. holding cost: $80/unit x month Hiring cost: $500/worker Firing cost: $1000/worker
min(C H H t C F Ft C I I t )
s.t.
Wt ! Wt 1 H t Ft , t ! 1,...,6
Pt ! ( d t c) Wt , t ! 1,...,6
I t ! I t 1 Pt Dt , t ! 1,...,6
I 6 ! 600
Wt , H t , Ft , Pt , I t u 0, t ! 1,...,6
Problem area
complex production environments
plastic, petrochemical, chemical, pharmaceutical industries
batch/serial processing with time windows transition patterns (set-up times) by-products, co-products (re-cycling) non-ordered production (for store) alternatives
processing routes, production formulas, raw material
Task preparing a schedule for a given time period (not minimising the makespan) objective
maximising the profit (minimising the cost)
co-operative solving
integration of solving methods from different areas (OR, AI )
semantic foundation
amazingly clean and elegant languages
SCHEDULER
Schedule = allocated activities
marketing planning
what and when should be produced not planning in AI terminology
production planning
generation of activities allocation to departments
production scheduling
exact allocation of activities to machines over time sometimes new activities introduced
Activity generation what if appearance of the activity depends on the allocation of other activities?
alternatives transition patterns (set-ups) processing of by-products non-ordered production
ACTIVITY ALLOCATOR
Conceptual models
view of time? discrete time (time slices with equal duration) even-based time (activities)
time-line model
grouping activities?
per resource
order-centric model
resource-centric model
Expressiveness
What could be modelled? (problem area) What is easy/hard to express? (constraints)
transition constraints
activity transitions in single resource set-ups
dependency constraints
dependencies between different resources supplier-consumer relation
Time-line model
Storing (item 1) Storing (items 1&B) empty No production Production (item4) Production (item5)
comments
covers all the typical problems in complex production environments all the variables are known in advance
too many variables in large-scale industrial problems
resources
empty
Time slice
time
Order-centric model
a chain of activities per order (task)
time polymerizing storing extruding storin g resources polymerizing storing extruding storing
enhancement
activities in the production chain are generated during scheduling starting from the order (alternatives, set-ups) sharing activities between production chains (by-products)
set-ups
set-up slot is either empty or contains the set-up activity (depending on the allocation of the next activity)
by-products (re-cycling)
sharing activities between the production chains
non-ordered production
pre-processing (non-ordered production is planned in advance before the scheduling)
Resource-centric model
a sequence of activities per resource what the resource can process rather than how to satisfy the order
Production (item1) Change-over Production (item 2) Production (item 3) empty Production (item5) No order time
representation
a list of virtual activities transition constraints between successive activities
resources
empty
Comparison of models
Time-line Resource constraints Transitions Dependencies Non-ordered production Cycling Alternatives DRAWBACKS easy easy easy implicit implicit implicit too many variables Order-centric complicated complicated easy no (limited) limited limited limited capabilities Resource-centric easy easy complicated implicit implicit implicit
What s next?
ad-hoc implementation
dynamic constraints propagation (early detection of inconsistencies) labelling (incremental) heuristics (choice of alternatives)
theoretical foundation
structural constraint satisfaction (A. Nareyek)
parallelism
agent based scheduling
R.I.T.A.
Resilient I.T. Architecture - resilience built in capable of rapid change and extensibility Four basic dimensions Work the work performed by the organization Information the data needed to perform the work Applications the automated systems needed to manage the data Technology the computing and communication devices needed to run the systems
A CASE STUDY
cmpm A00267ppmmJun93E
- 33 -
SATURN: BACKGROUND
General Motors, Saturns Parent, Is the Worlds Largest Industrial Corporation and Leading Automobile Producer
Revenues for 1992 were $132.4 billion, and net income was $92 milliona Automotive Products generated $118.6 billion in sales, but experienced an operating loss of $3.2 billion (before accounting changes):
- Operating loss comes from North American operations:
International operations earned profit of $1.2 billion in sales of $30.8 billion
- Performance improved over 1991; sales increased 8.6% and losses decreased by 92%
Brands include GMC Truck, Chevrolet, Buick, Cadillac, Oldsmobile, Pontiac and Saturn GMs subsidiaries have been extremely profitable:
- GMAC, GMs vehicle financing subsidiary: $1.2 billion in profits - EDS: $600 million in profits - GM Hughes Electronics: $700 million in profits
Despite the poor performance of its parent, Saturn has grown at record pace, increasing its market share ten-fold from 1990 to 1991.
a. Including accounting changes, GM experienced net loss of $23.4 billion
cmpm A00267ppmmJun93E - 34 -
SATURN: BACKGROUND
60% 50%
40%
30% 20%
10%
1984
1985
1986
1987
1988
1989
1990
1991
Year
Source: Business Week, April 20, 1992, p. 32.
cmpm A00267ppmmJun93E - 35 -
SATURN: BACKGROUND
GM Faces Significant Challenges from Lean Manufacturers, Both Here and Overseas
Chrysler: New platforms New dealer awareness Ford: Successful platform teams Leaner systems Toyota: Best-in-Class production system:
- Level scheduling - Lower inventory - Supplier coordination
Competitive Pressures
cmpm A00267ppmmJun93E
- 36 -
SATURN: BACKGROUND
GMs Eroding Share Is Largely a Result of Outdated Production Paradigms and Business Processes
The buffer of dealers between consumer production and demand
Materials Flow:
Parts Supplier GM Dealer Inventory Dealer Operations Customers
Information Flow:
Supplier Requests Production Information Dealer Orders Demand Information
Customers
Production runs batched in stamping, body, paint, and trim Large inventory stocks at each station 10,000 suppliers in 1988 and 5,500 in 1991; all operating in batch mode
cmpm A00267ppmmJun93E
- 37 -
Information systems:
- No trading of real order data - No synchronization with supplier - Little adherence to ideal sequence
Manufacturing:
- Large setups - Focus on long runs and quotas
cmpm A00267ppmmJun93E - 38 -
cmpm A00267ppmmJun93E
- 39 -
Suppliers
Retailers
cmpm A00267ppmmJun93E
- 40 -
Planning Flexibility Aggregate plan 10% on model type 20% on options 5% on options Load plant, 5% exterior colors
23 weeks 1 week
cmpm A00267ppmmJun93E
- 42 -
Saturns Production Planning Process Is Integrated with Dealers, Suppliers, and Major Component Manufacturers
Places custom orders on pipeline Issues weekly budgets for dealer distribution Gives 12 weeks for Saturns 300 suppliers to react Suppliers own parts until car is finished Handles daily orders and deliveries on preplanned routes and scheduled dock times Demands flexible component manufacturing, with focus of efficiency only at bottlenecks
cmpm A00267ppmmJun93E
- 43 -
The Ideal System Pulls Requirements Exactly When Needed but May Need an Interior Buffer
Saturn and other lean manufacturers recognize need for buffer Goal, however, is to minimize buffers Ideally, buffers are at start and finish Efficiency important only at bottlenecks Minimize setups
cmpm A00267ppmmJun93E
- 44 -
SATURN: IMPLICATIONS
Saturns Solid Results Are Related to Managing the Entire Production and Supply Chain for the Benefit of Its Customers
Outstanding dealer satisfaction (second only to Lexus in 1991) Sixth in owner satisfaction overall; first in its class Second in sales and third in profit per outlet Significant reductions in inventory and suppliers Lower lead times for customers
cmpm A00267ppmmJun93E
- 45 -
SATURN: IMPLICATIONS