PRODUCTIVITY TECHNIQUES
MEANING OF PRODUCTIVITY
PRODUCTIVITY IS OFTEN ASSOCIATED WITH PRODUCTION HIGHER PRODUCTION IS NOT HIGHER PRODUCTIVITY INCREASE IN PRODUCTION CAN BE ACHIEVED BY INCREASING QUANTUM OF INPUT BUT THAT DOES NOT INCREASE PRODUCTIVITY HIGHER PRODUCTIVITY RESULTS IF PRODUCTION PER EMPLOYEE OR PER MACHINE INCREASES ALONGSIDE WITH QUALITY PRODUCTIVITY IS CREATING SURPLUS THRU PRODUCTIVE OPERATIONS WHERE OUTPUT IS ALWAYS GT INPUT PRODUCTIVITY IS DEFINED AS OUTPUT WITHIN DEFINED TIME AND AS PER QLTY NORMS/INPUT
MEANING OF PRODUCTIVITY
BOTH OUTPUT AND INPUT SHOULD BE QUANTIFIED IN TANGIBLE MONETARY TERMS PRODUCTIVITY CAN BE IMPROVED BY -INCREASING OUTPUT WITH SAME INPUT -INCREASING OUTPUT MORE THAN THE INCREASE IN INPUT -DECREASING INPUT FOR THE SAME AMOUNT OF OUTPUT -INCREASING OUTPUT WHILE DECREASING INPUT PRODUCTIVITY IMPLIES EFFECTIVENESS AND EFFICIENCY IN INDIVIDUAL AND
DEFINITION OF PRODUCTIVITY
PRODUCTIVITY IS THE RATIO BETWEEN OUTPUT OF WEALTH TO THE INPUT OF RESOURCES USED IN THE PROCESS OF MFG PRODUCTIVITY = OUTPUT OF WEALTH/INPUT OF RESOURCES INPUTS ARE MATERIAL , MONEY , MACHINES , PEOPLE ANOTHER PARAMETER OFTEN USED IS PERFORMANCE WHICH IS (ACTUAL ACHIEVEMENT IN TERMS OF EFFECTIVE WORK DONE)/(STANDARD TARGET OF ACHIEVEMENT) * 100
DEFINITION OF PRODUCTIVITY
PERFORMANCE IS EXPRESSED AS PERFORMANCE INDEX WHICH IS % OF STANDARD TARGET OR EFFECTIVENESS OF PRODUCTIVITY .PRODUCTIVITY = OUTPUT/INPUT = PERFORMANCE ACHIEVED/RESOURCES CONSUMED = EFFECTIVENESS/EFFICIENCY PRODUCTIVITY CAN BE APPLIED TO MATERIAL , EQUIPMENT,MEN,CAPITAL MATRL = 1 TONNE OF HOT ROLLED STEEL PRODUCES 0.8 TONNE OF COLD ROLLED STEEL REST IS SCRAP. PRODUCTIVITY WAS 80%. THE ENGINEERS AT TISCO STUDIED THE PROCESS AND THRU METHOD STUDY INCREASED PRODUCTIVITY TO 90% BY REDUCING SCRAP
DEFINITION OF PRODUCTIVITY
MACHINE = RATED THROUGHPUT OF POWER PLANT WAS 100 MWH. ACTUAL THROUGHPUT(PLF) WAS 72% WHICH MEANT THE POWER PLANT HAD 28% LOSSES.AFTER STUDYING HEAT LOSSES AND INSTALLING PREHEATERS AND REGENERATORS THE HEAT LOSS WAS REDUCED BY 8%.HENCE PRODUCTIVITY OF POWER PLANT ROSE TO 80% MAN = STANDARD OUTPUT OF TRAINED 1 YEAR EXPERIENCED ORACLE PROGRAMMER IS 80 DEBUGGED LINES OF CODE PER DAY. ON A PARTICULAR DAY MR X PRODUCED 60 LINES. HIS PRODUCTIVITY WAS 75%
MYTHS IN PRODUCTIVITY
PRODUCTION IMPROVEMENT MEANS PRODUCTIVITY IMPROVEMENT EFFICIENCY IMPROVEMENT GUARANTEES PRODUCTIVITY IMPROVEMENT IMPROVEMENT IN SALES REVENUE ENSURES PRODUCTIVITY IMPROVEMENT QUALITY IMROVEMENT ENHANCES PRODUCTIVTY
PARTIAL PRODUCTIVITY
DEFINED AS RATIO OF TOTAL OUTPUT TO ANY ONE TYPE OF INPUT eg MATERIAL , MONEY ,LABOUR , ENERGY LABOUR PRODUCTIVITY = TOTAL OUTPUT/LABOUR COST eg 1000 cr/300cr = 3.3 MATERIAL PRODUCTIVITY =TOTAL OUTPUT/MATRL COST eg 1000cr/200cr 5.0 CAPITAL PRODUCTIVITY = TOTAL OUTPUT/CAPITAL COST eg 1000cr/300 = 3.3 CAN ALSO BE CALLED FIXED ASSET PRODUCTIVITY ENERGY PRODUCTIVITY =TOTAL OUTPUT/ENERGY COST eg 1000cr/100cr = 10
PARTIAL PRODUCTIVITY
PARTIAL PRODUCTIVITY GIVES MEASURE OF IMPACT OF TYPE OF INPUT ON OVERALL PRODUCTIVITY PARTIAL PRODUCTIVITY HELPS IN DETERMINING IMPORTANCE OF TYPE OF INPUT ON EFFECTIVENESS OF PROCESS
COMPARITIVE PLANT FIGURES OF ENERGY CONSUMPTION PER VEHICLE IN HERO HONDA PLANTS
2009
PLANT VEH KWH/VEH 35.85 31.12 24.63 GURGAON 15.59L DHARUHERA 15.99L HARIDWAR 6.30L
2010
VEH 15.93L 15.33L 14.04L KWH/VEH 36.97 32.09 17.31
TOTAL PRODUCTIVITY
TOTAL PRODUCTIVITY IS THE RATIO OF TOTAL OUTPUT TO THE SUM OF ALLINPUT FACTORS MEASURE WHICH TAKES INTO CONSIDERATION THE JOINT IMPACT OF ALL INPUT RESOURCES ON OUTPUT SUCH AS MATERIAL,MACHINES,CAPITAL,ENERGY etc MEASURE VERY POPULAR IN INDUSTRY
CONSIDERS ALL QUANTIFIABLE OUTPUT AND INPUT FACTORS AND IS THEREFORE A MORE ACCURATE REPRESENTATION OF THE REAL ECONOMIC PICTURE OF THE COMPANY PROFIT CONTROL THRU THE USE OF THESE INDICES IS OF BENEFIT TO THE MGT IF USED IN CONJUNCTION WITH PARTIAL PRODUCTIVITY CAN DIRECT MGT ATTENTION IN AN EFFECTIVE MANNER SENSITIVITY ANALYSIS IS EASIER TO PERFORM EASILY RELATED TO TOTAL COSTS MULTIPLE GOALS CAN BE ACHIEVED SIMULTANEOUSLY BY INCREASING TOTAL PRODUCTIVITY OF A COMPANY USING THE RELATIONSHIP BETWEEN PROFIT AND TOTAL PRODUCTIVITY A FIRM CAN OBJECTIVELY PLAN ITS PROFIT LEVEL BASED ON ITS ABILITY TO REACH A CERTAIN PRODUCTIVITY LEVEL USING THE CONCEPT OF BREAK EVEN POINT OF TOTAL PRODUCTIVITY A FIRM CAN DETERMINE IF ITS TOTAL PRODUCTIVITY LEVEL IS A VALUE THAT YIELDS PROFITS MGT IS FORCED INTO A LONG TERM ACTION ON QLTY,PROFITABILITY etc
KEY PARAMETERS
MARKETING ACCURACY OF DEMAND FORECASTING -COST LEADERSHIP -SERVICING SPEED AND EFFECTIVENESS -OPTIMISED PRODUCT MIX PRODUCTION -INVENTORY CONTROL -JUST IN TIME -PROCUREMENT COST -SAFETY
WORK MEASUREMENT INCLUDING METHOD STUDY , TIME STUDY , MOTION STUDY JOB DESIGN JOB EVALUATION AND JOB SAFETY
INEFFECTIVE TIME
ALL INTERRUPTIONS WHICH CAUSE STOPPAGE IN OPERATION IS REGARDED AS INEFFICIENT TIME BECAUSE NO WORK EFFECTIVE TOWARDS COMPLETION OF OPERATION IN HAND IS BEING DONE DURING PERIOD OF INTERRUPTION INEFFECTIVE TIME DUE TO SHORTCOMINGS BY MGT.TIME DURING WHICH MAN/MC IS IDLE BECAUSE MGT FAILED TO PLAN DIRECT OORDINATE OR CONTROL EFFICIENTLY
Exhibit S6.8
WASTE MANAGEMENT
Introductory Quotation
Waste is anything other than the minimum amount of equipment, materials, parts, space, and workers time, which are absolutely essential to add value to the product.
What is WASTE?
Any Activity that DOES NOT increase the Market Form or Function of the Product or Service based on the Critical Customer Requirements.
61
DEFINITION OF WASTE
THE OXFORD DICTIONARY DEFINES WASTE AS UNPURPOSEFUL OR EXTRAVAGANT ACTIVITY WHICH RESULTS IN UNPRODUCTIVE END RESULTS WASTE IS A PRODUCT,ACTIVITY OR SERVICE FOR WHICH AN EXTERNAL CUSTOMER IS UNWILLING TO PAY FOR CASE OF SECURITY CESS IN RAILWAYS WASTE IS ONLY NUISANCE VALUE TO CUSTOMER
WASTE MANAGEMENT
WASTE EXISTS EVERYWHERE FROM INDUSTRY TO HUMAN ACTIVITIES IN ANY PROCESS WASTE ACCOUNTS FOR A VERY LARGE AMOUNT OF NON VALUE ADD ACTIVITY MGT NEEDS TO CONTROL ACTIVITIES BETTER THRU TIGHTER CONTROL WASTE MGT IMPROVES COSTS AND PRODUCTIVITY AND REDUCES CYCLE TIMES
Eliminate Waste
Muda anything that does not add value for the customer
Products in storage Products being inspected Products waiting in queues Defective products Unnecessary movement of materials or workers - 2 TYPES OF WASTES TYPE 1 WASTE WHICH IS
ESSENTIAL NON VALUE ADD ACTIVITIES AND TYPE 2 WASTE WHICH IS ELIMINATABLE eg INSPECTION
65
Idle machine run Waiting for parts Counting parts Overproduction Moving parts over long distances Storing inventory Looking for tools Machine breakdown 66 Rework
Examples of Waste
Excess Downtime
Tooling condition Unreliable equipment Long changeovers Incapable process
Waiting unbalanced work loads, slow system response, incomplete information, approvals
Not Utilizing Employees old guard thinking, politics, high turnover, low investment in training
PRODUCING DEFECTS
DEFECTS IN PRODUCT / SERVICE ARE MAJOR SOURCE OF WASTE COSTS OF WASTE INCLUDE WARRANTY COSTS,ATTENDING COMPLAINTS AS WELL AS REWORK,INSPECTION CASE OF DELL COMPUTERS PRODUCT DEFECTS TO BE ELIMINATED BY QUALITY ASSURANCE IN DESIGN ELIMINATING NEED TO INSPECT OR REWORK DEFECTS INCREASE PRODUCTION COSTS AND LEAD TIME OF MANUFACTURE DEFECTS DUE TO WRONG OPERATING PROCEDURES,VARIATIONS IN OPERATIONS RESULTING IN M/C WEAR,DEFECTIVE RAW MATRL,OPERATOR ERROR etc
INVENTORY
INVENTORY AS PER TOYOTA IS ONE OF THE SEVEN SINS INVENTORY REPRESENTS ITEMS WAITING FOR SOMETHING TO HAPPEN (JUST IN CASE) INVENTORY IS CARRIED TO PREEMPT DELAYS IN DELIVERY OF PROCESS INPUT OR TO PROVIDE FOR CUSHION STOCKS TO TAKE CARE OF MFG REWORK/SCRAP (SOME CUSHIONS ACCOUNT FOR AS MUCH AS 5% OF RAW MATERIAL) WASTES ASSOCIATED WITH HOLDING COSTS, DEPRECIATION, EXPIRY DATES , DETERIORATION. PILFERAGE ETC JUST IN TIME IS THE REMEDY FOR EFFECTING ZERO INVENTORY
OVERPRODUCTION
EXCESS PRODUCTION BECAUSE OF WRONG SALES FORECASTS OR ATTEMPT TO KEEP FACILITIES RUNNING MFG OF EXCESS PRODUCTION IS WASTE CASE OF ALL SALES OF READY MADE GARMENTS WASTE FROM OVERPRODUCTION IS REFLECTED IN UNSOLD STOCKS WHICH ADD TO FINISHED GOODS INVENTORY
WAITING
WASTE OF WAITING IS EASY TO IDENTIFY WAITING IS A RESULT OF UNBALANCED PROCESS SEQUENCE OR BREAKDOWN IN BOTTLENECK PROCESS INCLUDES WAITING FOR ORDERS, RAW MATERIAL, POWER, SPARES, LABOUR OR EVEN FUNDS TO PROCURE RESOURCES WAITING ALSO INCLUDES ITEMS FROM PRECEDING PROCESSES EXAMPLE OF PILE UP OF WIP OR PERISHABLES AWAITING CUSTOMS CLEARANCE
WAITING
WAITING MINIMIZED BY BUSINESS PROCESS ACTIVITY IMPROVEMENT OR MINIMIZATION OF LEAD TIME TO PROCURE THROUGH VENDOR MANAGED INVENTORY OR OTHER INITIATIVES WAITING ALSO MINIMIZED BY GOOD MAINTENANCE PRACTICES SUCH AS CBM RESULTING IN MAXIMIZED EFFECTIVENESS
PROCESSING
PROCESS MAY CONTAIN ACTIVITIES WHICH ARE INEFFECTIVE OR UNNECCESARY PROCESSING WASTE CAN BE ELIMINATED BY MINIMIZING MOTION REQUIRED TO PERFORM WORK ACTIVITY ANALYSIS DONE TO DETERMINE PROCESS UTILISATION TIME AND THEREAFTER PROCESS IMPROVEMENT DONE TO ELIMINATE DELAYS AND NON VALUE ADDED ACTIVITIES
MOTION
BEING IN MOTION IS INCORRECTLY CONNOTED TO BE AT WORK MOTION AND WORK ARE NOT THE SAME WORK IS CONSIDERED A PARTICULAR KIND OF MOTION THAT ADDS VALUE AN APPARENTLY BUSY PERSON MAY ACTUALLY PRODUCE VERY LITTLE WORK INHERENT HANDICAP AT RIGHT HANDED WORKPLACE FOR LEFTHANDERS MOTION UNREQD TO DO WORK IS WASTE EXCESSIVE MOTION CAUSES FATIGUE AND LOSS OF PRODUCTIVITY AND INCREASE OF WASTE CASE OF BEARING LIFETIME INVERSELY PROPORTIONAL TO RPM
REMEDY
JIT/PULL PRODUCTION PROCESS ACTIVITY STUDY MOTION STUDY METHOD STUDY JUST IN TIME MOTION STUDY ROOT CAUSE ANALYSIS AND FMECA
OFFICE WASTES
ERRORS IN DOCUMENTS DOING UNREQUIRED WORK NOT REQUESTED PROCESS OF GETTING APPROVALS AND NEEDLESS LEVELS OF APPROVALS BACKLOG OF WORK UNREQUIRED STATIONERY FILES PAPERS AT WORKPLACE UNCLEAR JOB DESCRIPTIONS RESULTING IN UNDEFINED OUTCOMES EXCESS DEBIT CREDIT NOTES DUE TO ERRONEOUS PO INVOICE OBSOLETE DATABASES TYPOGRAPHICAL ERRORS UNREQUIRED COMMUNICATION
LEVELS OF WASTE
FOUR LEVELS OF WASTE -BUSINESS LEVEL WASTES -PLANT LEVEL WASTES -PROCESS AND METHOD WASTES -OPERATING LEVEL WASTES
Over Production
Over enthusiastic incentive - Wrong Forecast
Excess Inventory
Obsolete Stocks - Wrong Forecast - Customer amendments/cancellation Poor Quality - Market Condition
Unrequired Motions
Over use of paper/distribution - Excess Walking - Excess Motions
Transportation
Layout - wait time to travel
Wait Time
Poor Scheduling - Imbalance in prodn line - Inadequate labor resource
BUSINESS PROCESSES
EVERYTHING WE DO IS A PROCESS AND CONSISTS OF INPUTS PROCESSING AND OUTPUT PROCESS TAKES INPUT FROM SUPPLIERS,ADDS VALUE AND DELIVERS OUTPUT TO CUSTOMER CUSTOMER COULD BE INTERNAL OR EXTERNAL AND SUPPLIER COULD BE THE SAME AS CUSTOMER PROCESSES ARE SET OF LOGICALLY RELATED ACTIVITIES LINKED BY RULES WHICH COMBINE TO DELIVER VALUE TO CUSTOMERS ACROSS FUNCTIONAL LINES . THEY USE PREDETERMINED LOGIC RULES TO PROCESS INPUTS PROCESSES USE INPUTS FROM SUPPLIERS SUCH AS INFORMATION SKILLS TRAINING PEOPLE,EQUIPMENT,MATERIAL,PROCEDURES METHODS SPECIFICATIONS SERVICES KNOWLEDGE AND VOICE OF CUSTOMER PROCESS PROCESSES INPUTS AS PER THE BUSINESS RULES AND ACTIVITY DEPENDENCIES PROCESSES OUTPUT PRODUCTS SERVICES INFORMATION TO CUSTOMERS OUTPUTS RESULT IN OUTCOMES WHICH ARE MEASURES OUTCOMES ARE COMPARED WITH TARGETS AND RESULT IN
PROCESS MECHANICS
INPUTS
PROCESS OUTPUTS
MATERIALS PROCEDURES METHODS DATA PEOPLE WITH SKILLS KNOWLEDGE MANAGEMENT TRAINING EQUIPMENT FINANCE
INPUTS
OUTPUTS
CUSTOMER
VOICE OF PROCESS
ACTIVITIES IN AN ORGANIZATION
EVERY THING WE DO IN A COMPANY IS A PART OF A LARGER PROCESS WHICH IS EXECUTED TO ACHIEVE BUSINESS RESULTS PROCESS COMPRISES OF SUB PROCESSES SUB PROCESS IS DIDIDED INTO ACTIVITIES WHICH CAN BE // OR IN SEQUENCE ACTIVITIES CAN BE DIVIDED INTO INDIVISIBLE TASKS
PLAN TO PRODUCE
DELIVER INDENT TO PR RECEIVE CASH OPTIONAL PO TO TENDER TENDER TO PO OR PR TO PO DELY TO ACCEPT ACCEPT TO INVOICE INVOICE TO PAY
PROCURE TO PAY
DESPATCH PO
APPROVE PO
ACTIVITY
N
REQD TO PRODUC E O/P
Y
REAL VALUE ADD
Y
ESSENTIAL NON VALUE ADD NON VALUE ADD
PROCESS WASTE
WASTE MANAGEMENT
WASTE EXISTS EVERYWHERE FROM INDUSTRY TO HUMAN ACTIVITIES IN ANY PROCESS WASTE ACCOUNTS FOR A VERY LARGE AMOUNT OF NON VALUE ADD ACTIVITY MGT NEEDS TO CONTROL ACTIVITIES BETTER THRU TIGHTER CONTROL WASTE MGT IMPROVES COSTS AND PRODUCTIVITY AND REDUCES CYCLE TIMES
LEVELS OF WASTE
FOUR LEVELS OF WASTE -BUSINESS LEVEL WASTES -PLANT LEVEL WASTES -PROCESS AND METHOD WASTES -OPERATING LEVEL WASTES
LEVELS OF WASTE
FOUR LEVELS OF WASTE: -LEVEL 1 refers to business related wastes. It includes wastes due to cross functional issues, poor communication and coordination between vendors, customers and even poor investment decisions -LEVEL 2 refers to plant level wastes. It includes faulty production planning and control, poor layout resulting in un required movement and WIP It includes poor m/c capability resulting in rework, scrap and rejection. It also includes poor maintenance policies
LEVELS OF WASTE
FOUR LEVELS OF WASTE (CONTD): -LEVEL 3 refers to process or method related work and includes issues like excess time spent or setup activities adjustment and alignment. It covers poor workplace design and unsafe methods -LEVEL 4 refers to wastes within processes. Includes issues such as improper postures at workplace and lack of standard operating procedures
OFFICE WASTES
ERRORS IN DOCUMENTS DOING UNREQUIRED WORK NOT REQUESTED PROCESS OF GETTING APPROVALS AND NEEDLESS LEVELS OF APPROVALS BACKLOG OF WORK UNREQUIRED STATIONERY FILES PAPERS AT WORKPLACE UNCLEAR JOB DESCRIPTIONS RESULTING IN UNDEFINED OUTCOMES EXCESS DEBIT CREDIT NOTES DUE TO ERRONEOUS PO INVOICE OBSOLETE DATABASES TYPOGRAPHICAL ERRORS UNREQUIRED COMMUNICATION
TOYOTA 7 WASTES
PRODUCTION DEFECTS TRANSPORTATION INVENTORY OVER PRODUCTION WAITING PROCESSING MOTIONS AND EFFORT
OTHER(canon) WASTES
WASTED CAPACITY WASTED ENERGY WASTE FROM LOST OPPORTUNITY WASTE FROM UNREQD EXPENSES WASTE FROM UNUTILISED TALENT WASTE FROM LOSSES DUE TO EFFICIENCY,STARTUP,IDLING, BATCH CHANGEOVER WASTE DUE TO COMMN LOSSES OR INEFFECTIVENESS OF COMMN WASTED PLANNING EFFORTS WASTED INVESTMENTS WASTED OVERSTAFFING WASTE IN DISPOSAL
ELIMINATION OF 3M
3M STAND FOR MUDA MURA AND MURI MUDA MEANS WASTES OF ALL KINDS SUCH AS REWORK,TRANSPORTATION,DELAYS MURA MEANS INCONSISTENCES SUCH AS NON CONFORMANCE TO QLTY AND STD OPERATING PROCEDURES MURI MEANS NON RATIONALITY OR DISCREPANCY ie UNSCIENTIFIC WAY OF DOING THINGS
ELIMINATION OF 3M
3M EXERCISE DONE TO -ELIMINATE WHOLE ACTIVITY -REDUCE STEPS IN ACTIVITY -CHANGE AND SIMPLIFY ACTIVITY -REDUCE THE TIME COST AND FATIGUE INVOLVED IN ACTIVITY
MUDA
MUDA MEANS WASTE WASTE IS ANY ACTIVITY THAT DOES NOT ADD VALUE SUCH ACTIVITIES CONTRIBUTE TO COST OF POOR QUALITY MUDA IS TOTAL COST OF EXTERNAL PRODUCT/SERVICE FAILURE PLUS THE COST OF PREVENTIVE MEASURES MUDA DEFINED IN TOYOTA 7 WASTES AND CANON 9 WASTES ELIMINATING MUDA REDUCES COST OF PRODN , ENHANCES PRODUCTIVITY , REDUCES CYCLE TIME , AND LEADS TO BETTER CUSTOMER SATISFACTION
8 types of Muda
3. Muda of transport
4. Muda of processing 5. Muda of inventory 6. Muda of motion 7. Muda of repair/rejects
MURI
MURI MEANS UNREASONABLE OR IRRATIONAL APPROACH TO ANY OPERATION KAIZEN CHECKLIST TRIES TO LOOK INTO IMPROVEMENT BY IDENTIFYING AND ELIMINATING THE UNREASONABLENESS IN AREAS SUCH AS MANPOWER,TECHNIQUE,METHOD,TIME,FACILITIES,TOOLS, MATERIALS,INVENTORY,PLACE,PRODUCTION,,QUANTITY, QUALITY, etc MURI LOOKS FOR IRRATIONALITY WITH FOUR MAJOR APPROACHES
Muri
Muri = Physical Strain Bend to work? Push hard? Lift weight? Repeat tiring action? Wasteful walk? All this is Muri
4 APPROACHES OF MURI
THINGS OR ACTIVITIES THAT ARE EXTREMELY DIFFICULT TO DO AND AT THE MOMENT BEYOND REACH SHOULD BE IDENTIFIED AND ELIMINATED FROM ACTIVITIES DO NOT PURSUE ACTIVITIES THAT DO NOT ADD VALUE IDENTIFY AND REFINE REASONS FOR PERFORMING ACTIVITIES ELIMINATE IRRATIONAL OPERATIONS THAT CAUSE FATIGUE
MURA
INCONSISTENCY IN OPERATIONS DEVIATION FROM STANDARDS LEADING TO INCONSISTENCY MURA CALLS FOR MINIMUM DEVIATION BETWEEN BEST AND WORST PRODUCT BY MINIMIZING RANGE OF STD DEVIATION USING SPC
Over Production
Over enthusiastic incentive - Wrong Forecast
Excess Inventory
Obsolete Stocks - Wrong Forecast - Customer amendments/cancellation Poor Quality - Market Condition
Unrequired Motions
Over use of paper/distribution - Excess Walking - Excess Motions
Transportation
Layout - wait time to travel
Wait Time
Poor Scheduling - Imbalance in prodn line - Inadequate labor resource
VALUE ENGINEERING
DEFINITION OF VALUE
VALUE IS A WORD USED WITHOUT UNDERSTANDING THE MEANING DIFFERENT DEPTS OF SAME COMPANY HAVE VARIED MEANING DESIGNER RELATES VALUE WITH RELIABILITY MFG RELATES WITH COST OF MFG PURCHASE RELATES WITH COST OF RM SALES RELATES TO THE PRICE CUSTOMER IS WILLING TO PAY
DEFINITION OF VALUE
VALUE IS THE RELATIONSHIP BETWEEN COST AND QLTY VALUE = QUALITY/COST VALUE IS PLACED FOR VARIOUS ATTRIBUTES MORE POPULARLY KNOWN AS FUNCTIONS OF A PRODUCT TWO TYPES OF FUNCTIONS -PRIMARY SECONDARY PRIMARY FUNCTIONS ARE THOSE ATTRIBUTES FOR WHICH A PRODUCT IS PURCHASED AND MEANT TO BE USED eg THE PRIMARY FUNCTION OF A CAR IS TO SAFELY TRANSPORT PEOPLE BETWEEN TWO POINTS WITH FUEL ECONOMY SECONDARY FUNCTIONS ARE THOSE ATTRIBUTES WHICH ARE NOT PRIMARY FUNCTIONS BUT WHICH PEOPLE WISH TO SEE AS ATTRIBUTES OR FUNCTIONSS IN A PRODUCT eg IN A CAR WE ALSO WISH TO HAVE A/C AND OTHER ACCESSORIES
VALUE ENGG/ANALYSIS
ENGINEERING IS A PROCESS OF ASSESSMENT OF A PRODUCT DURING DESIGN PHASE ANALYSIS IS ASSESSMENT OF A PRODUCT DURING USAGE OBJECTIVE IS TO ELIMINATE UNREQD FEATURES AND FUNCTIONS IN PRODUCT DESIGN MOST ACTIVITIES PERFORMED IN ANALYSIS PHASE VA TEAM ASSIGNS A VALUE TO EACH FUNCTION AND FINDS COSTS TO DELIVER FUNCTION AND RATIO OF VALUE TO COST IS CALCULATED RATIO IMPROVED BY REDUCING COST OF ITEM OR INCREASING WORTH
VALUE ENGG/ANALYSIS
VALUE ANALYSIS IS A MGT TECHNIQUE FOR REDUCING MFG COSTS AND ///LY IMPROVING QLTY AND RELIABILITY OF PRODUCT VALUE ENGG IS USED TO COVER THE INITIAL DESIGN STAGE VALUE MEANS DIFFERENT THINGS TO DIFFERENT PEOPLE AT DIFFERENT TIME VALUE OF AN ITEM DETERMINED ON THE BASIS OF VARIOUS ASPECTS:
TYPES OF VALUE
COST VALUE IS SUM OF ALL COSTS INCURRED IN MFG OF PRODUCT eg MATRL LABOUR TOOLING O/H USE VALUE IS THE COST INCURRED TO MAKE PRODUCT FUNCTIONAL eg QLTY COSTS INCURRED TO ENSURE A/C COOLS TO REQD TEMPERATURE ESTEEM VALUE IS THE COST INCLUDED INTO PRODUCT TO ENHANCE CUSTOMER APPEAL Eg IN SOME CASES THE MOTOR CAR ESTEEM VALUE > USE VALUE IN TERMS OF FUEL CONSUMPTION LIKE IN THE CASE OF A MERCEDES BENZ WHICH GIVES ONLY 6 KM/LTR AGAINST THE AVERAGE 1518KM/LTR IN OTHER BRANDED CARS EXCHANGE VALUE IS THE VALUE OF PROPERTIES WHICH ENABLES AN ITEM TO BE EXCHANGED FOR SOMETHING ELSE .EXCHANGE VALUE IS GENERALLY RESALE VALUE. Eg REAL ESTATE EXCHANGE VALUE IS INFLATED BY 20% EVERY YEAR PLACE VALUE IS VALUE OF PROPERTY/EQUIPMENT WHICH VARIES IN PRICE WRT LOCATION eg IN MUMBAI REAL ESTATE IS MORE EXPENSIVE IN WESTERN SUBURBS THAN IN EAST TIME VALUE IS PROPERTY OF PRODUCT/SERVICE RENDERED AT THE RIGHT TIME eg THE TIMING OF AN EMERGENCY OPERATION IS CRITICAL FOR SURVIVAL OF THE PATIENT
VALUE ENGG/ANALYSIS
ECONOMIC WORTH = COST VALUE + EXCHANGE VALUE + USE VALUE + ESTEEM VALUE + PLACE VALUE + TIME VALUE REAL WORTH = ECONOMIC WORTH/COST VALUE REAL WORTH = WORTH/LIFE CYCLE COST FOCUS OF VE TO INCREASE REAL VALUE OF PRODUCT PROCESS OR SERVICE VE/VA GENERALLY RESULTS IN COST REDUCTION
WHEN TO APPLY VA
PRODUCTS ARE LOSING THEIR MKT SHARE AND THERE IS DECLINE IN SALES PRODUCTS ARE PRICED HIGHER THAN COMPETITION IN A PRICE SENSITIVE MKT OR PRODUCT COST IS > SALES PRICE OF COMPETITION NEW DESIGNS TO BE UNDERTAKEN RISING MFG COSTS
DIFFERENCE BETWEEN VE AND OTHER COST REDUCTION TECHNIQUES ORIENTED TRADITIONAL TECHNIQUES ARE POST PRODUCTION
AND CONCENTRATION IS ON THE PART OR ELEMENT IN CONTRAST TO VALUE ANALYSIS WHICH IS FUNCTION ORIENTED OTHER TECHNIQUES TRY TO REDUCE THE COST BY EXISTING METHOD WHEREAS VA NEVER CONSIDERS ANY PROCESS METHOD OR ELEMENT GRANTED AND IT ANALYSES BY FUNCTION RATHER THAN PART OR ELEMENT COST REDUCTION CAN REDUCE THE COSTS UPTO 10% WHEREAS VA CAN REDUCE COSTS UPTO 40-50% WITHOUT SACRIFICING QLTY AND PERFORMANCE VALUE ANALYSIS QUESTIONS THE VERY EXISTENCE OF PARTS OR PROCESS BY ANALYSIS OF ITS DESIGN SPECIFICATIONS, MATRLS AND PROCESS OF MFG COST REDUCTION IS COST ORIENTED AND CONCENTRATES ON FINDING THE CHEAPER COST WHEREAS VALUE ANALYSIS IS FUNCTION ORIENTED AND TRY TO PRODUCE THE PRODUCT AT LOWEST COST WITHOUT SACRIFICING QLTY AND PERFORMANCE
VA PROCEDURE
IDENTIFY ITEMS TO BE ANALYSED DIFFERENTIATE WHETHER ITEM OR PROCESS IDENTIFY INTERNAL AND EXTERNAL CUSTOMERS IDENTIFY BASIC FUNCTIONS IDENTIFY SECONDARY FUNCTIONS WHICH SUPPORT BASIC TO PRIORITISE DETERMINE VALUE OR IMPERTANCE TO CUSTOMER OF EACH FUNCTION BREAK ITEM/PROCESS INTO CONSTITUENT COMPONENTS BY USING FLOWCHART ASSOCIATE COMPONENTS WITH FUNCTIONS LOOK FOR COMPONENTS WHICH CAN BE MODIFIED OR ELIMINATED
OPTIONS IN VA/VE
MODIFY INTEGRATE SUBSTITUTE SIMPLIFY
Productivity Technique
163
Introduction
Definition: Work Study is the systematic examination of the methods of carrying on activities so as to improve the effective use of resources and to set up standards of performance for the activities being carried out.
Work Study succeeds because it is systematic both in the investigation of the problem being considered and in the development of its solution.
164
Continue.
If work study results in cutting down the time of performing a certain activity by 20 per cent Merely as a result of rearranging the sequence or simplifying the method of operation Without additional expenditure Then productivity will go up by a corresponding value, that is by 20 per cent.
165
WORK STUDY
OPERATIONS MGT IS ABOUT ADDING VALUE IN ACTIVITIES AND PRODUCING RESULTS AS DESIRED BY THE CUSTOMER. ACTIVITIES HAVE INPUTS WHICH ARE IN VARIOUS FORMS. THEY ALSO HAVE BUSINESS RULES AND METHODS BY WHICH THEY HAVE TO BE PERFORMED.THEY ALSO PRODUCE RESULTS WHICH SHOULD CONFORM TO CUSTOMERS REQUIREMENT WORK STUDY DEFINED AS SCIENCE OF EXAMINATION OF HUMAN WORK IN ALL CONTENTS WHICH LEADS TO SYSTEMATIC INVESTIGATION OF ALL FACTORS WHICH AFFECT EFFICIENCY GENERIC FORM OF TECHNIQUES WHICH ARE USED TO EXAMINE HUMAN WORK IN ALL ASPECTS AND WHICH SYSTEMATICALLY LEAD TO THE INVESTIGATION OF ALL
WORK STUDY
WORK STUDY INVESTIGATES AND CRITICALLY EXAMINES WORK DONE AND FINDS THE BEST AND MOST EFFECTIVE WAY OF USING RESOURCES TO AHIEVE BEST QUALITY RESULTS IN THE LEAST TIME AND COST CRUX OF WORK STUDY IS TO OPTIMIZE USAGE OF INPUT RESOURCES AND TO MAXIMIZE PRODUCTIVITY WORK STUDY HELPS IN DECIDING RESOURCE REQUIREMENTS AT THE
Operational Time
Definition: The time taken by a worker or a machine to carry out an operation or to produce a given quantity of a certain product . Basic work content of product and/or operation
Work content added by poor product design or material utilization Work content added by inefficient methods of manufacturing or operation.
Ineffective time resulting from human resources contribution
168
Work measurement :The application of techniques designed to establish the time for a qualified worker to carry out a task at a defined rate of working.
169
Work study
Work Measurement
To determine how long it should take to carry out
Higher Productivity
170
Work Measurement
-Determine the time required to perform the operation and its elements -Comprises of Motion and Time study
METHOD STUDY
METHOD STUDY
DEFINED AS SYSTEMATIC AND SCIENTIFIC ANALYSIS OF PROPOSED METHOD OF DOING A JOB IN ORDER TO DEVELOP A SIMPLE EFFICIENT EFFECTIVE AND LESS FATIGUING PROCEDURE OF DOING THE SAME JOB AT A LESSER COST BY OPTIMIZING INPUT RESOURCES IT USES DIFFERENT PROCESS MAPPING TECHNIQUES TO IDENTIFY AND ERADICATE THE NON VALUE ACTIVITIES OBJECTIVE OF METHOD STUDY IS TO IMPROVE PROCESS OF VALUE ADDITION .THIS IS DONE BY MAXIMIZING VALUE ADDED OPERATIONS AND MINIMIZING OR ELIMINATING DELAY STORAGE
METHOD STUDY
METHOD STUDY INVOLVES THE STUDY OF HOW ACTIVITIES ARE PERFORMED AND ATTEMPTS TO REMOVE NON VALUE ADDED ACTIVITIES AS WELL AS IMPROVE THE PROCEDURE AND WAY IN WHICH THE ACTIVITY IS PERFORMED SO THAT THE TIMING TO EXECUTE MAY BE REDUCED AND THE ACTIVITY IS PERFORMED IN LESSER TIME WITH LESSER EFFORT. Eg DENNIS LILEE BOWLING ACTION AFTER BACK OPERATION
METHOD STUDY
METHOD STUDY IS SYSTEMATIC RECORDING AND CRITICAL EXAMINATION OF WAYS OF DOING THINGS OBJECTIVE OF METHOD STUDY IS TO IMPROVE ACTIVITY ACTIVITY CAN BE IMPROVED THROUGH PROCESS REENGINEERING BY ELIMINATING NVA ACTIVITIES OR BY REDUCING EXISTING TIMINGS OF ACTIVITIES THROUGH BETTER WAYS NEED TO DRAW PROCESS CHARTS AND ACTIVITY CHARTS WITH MOVEMENT,STORAGE,DELAY,INSPECTION,ACTIVITY,DECI SION ALONG WITH TIMINGS
TIME STUDY
TIME STUDY
TIME STUDY CAN BE DEFINED AS THE APPLICATION OF SCIENTIFIC TECHNIQUES TO MEASURE WORK CONTENT OF ACTIVITY IN A NORMAL DEFINED SITUATION AND ESTABLISH TIME REQUIRED TO EXECUTE JOB BY VARIOUS SKILLS AT A DEFINED LEVEL OF PERFORMANE. FALLACY LIES IN DEFINING STD TIME FOR ALL LEVELS OF CAPABILITY AND EXPERIENCE
TIME STUDY
ALSO CALLED WORK MEASUREMENT IT DETERMINES THE TIME TAKEN TO DO A JOB DECIDES MANPOWER REQUIRED (QUANTITY VS QUALITY) DECIDES EQUIPMENT REQUIRED PROVIDES VALUABLE INFO FOR PRODN PLANNING IN TERMS OF TIME ESTIMATION FOR EACH STEP IN THE ROUTING INDICATES REALISTIC LABOR BUDGETING PROVIDES BASE FOR STD COSTING (CHECK CHANGING PARAMETERS) RESULTS IN EFFECTIVE LABOUR CONTROL
TIME STUDY
CONSISTS OF A WIDE VARIETY OF PROCEDURES FOR DETERMINING THE AMOUNT OF TIME REQD UNDER CERTAIN STD CONDITIONS OF MEASUREMENT A TERM WORK MEASUREMENT IS ALSO USED FOR TIME STUDIES
189
ALLOWANCES
ALLOWANCES ARE ADDED TO NORMAL TIME TO ARRIVE AT STANDARD TIME TYPES OF ALLOWANCES INCLUDE PROCESS ALLOWANCE AND PERSONAL ALLOWANCE PROCESS ALLOWANCE ARE ALLOCATED TO COVER ENFORCED IDLE TIME OR SPECIAL CASES WHICH ARE NOT PART OF WORK CYCLE BUT ARE ESSENTIAL FOR PERFORMING WORK eg BEAM CHANGE IN WEAVING OR MACHINE SET UP TIME OR INTERFERENCE ALLOWANCE WHEN WORKER HANDLES MORE THAN ONE MACHINE eg WEAVER HANDLES 8/16 MACHINES PERSONAL ALLOWANCES INCLUDE TIME ALLOWED FOR FATIGUE , CALLS OF NATURE , DIFFICULT WORKING CONDITIONS etc. VARIES FROM 15% TO 30% DEPENDING ON SITUATIONS
MOTION STUDY
MOTION STUDY
ANALYSIS OF AN OPERATION IN TERMS OF INDIVIDUAL MOTIONS OF A WORKER AS WELL AS WORKPLACE LAYOUT AND ERGONOMICS FOR ACHIEVING HIGH PRODUCTIVITY PURPOSE OF MOTION ANALYSIS IS TO DESIGN AN IMPROVED METHOD WHICH ELIMINATES UNNECESSARY MOTIONS AND EMPLOYS HUMAN EFFORTS MORE PRODUCTIVELY OBJECTIVE IS ALSO TO MINIMIZE FATIGUE TO OPERATORS AND AT THE SAME TIME MAXIMIZE PRODUCTIVITY
MOTION STUDY
MOTION STUDY CONSISTS OF A WIDE VARIETY OF PROCEDURES FOR SYSTEMATIC ANALYSIS AND IMPROVEMENT OF WORK PROCESS AND ORDER OF WOR METHODS CONSIDERING RAW MATRL,DESIGN OF PHYSICAL OUTPUTS,SERVICES,TOOLS WORKPLACE AND EQUIPMENT REQUIRED FOR EACH STEP IN THE PROCESS;HUMAN ACTIVITY REQUIRTED TO PERFORM EACH STEP AIM IS TO ESTABLISH AND DESIGN (SOP) CRITERION IS EFFECTIVENESS OF ACTIVITY,ACCURACY,RELIABILITY AND ECONOMY OF A PREFERABLE WORK METHOD
ANALYSIS OF MOTION
ANALYSIS OF AN OPERATION FOR ATTAINMENT OF END OBJECTIVE IS CARRIED OUT IN TERMS OF INDIVIDUAL MOTIONS OF A PERSON AS WELL AS THE WORK PLACE LAYOUT AND ERGONOMICS FOR ATTAINMENT OF HIGHEST LEVEL OF PRODUCTIVITY PURPOSE OF MOTION ANALYSIS IS TO ELIMINATE UNNECESSARY MOTIONS TO REDUCE FATIGUE AND EFFORT AND MAKE HUMAN EFFORT MORE PRODUCTIVE eg WEIGHT LIFTING
PLANT LAYOUTS
PLANT LOCATIONS
HISTORICALLY CERTAIN INDUSTRIES GREW IN CERTAIN AREAS DUE TO A NUMBER OF FACTORS PLANT LOCATIONS ARE PRIMARILY DECIDED BY PROXIMITY TO THE SOURCE OF RAW MATERIAL THOUGH NOT ANYMORE. OTHER FACTORS WHICH INFLUENCE THE CHOICE OF LOCATION INCLUDE -INFRASTRUCTURE AVAILABILITY -TRANSPORTATION FACILITY -AVAILABILITY OF SKILLED LABOUR AND RAW MATERIAL AND ECONOMICS OF COSTING eg HIGH LABOUR COSTS -AVAILABILITY OF POWER -PROXIMITY TO MARKETS BOTH INPUTS AND FINISHED GOODS - POLITICAL COMPULSIONS FINALLY CERTAIN TECHNICAL ISSUES MAY DETERMINE
Facility Design
Facility layout: Arrangement of machines, storage areas, and/or work areas usually within the confines of a physical structure, such as a retail store, an office, a warehouse, or a manufacturing facility. Factors that influence layout
Volume, weight of items to be produced. Nature of the service to be provided. Cost of the building to house the operation. The product mix that must have a facility. The fragility of the product or component.
INTRODUCTION
Plant layout planning includes decisions regarding the physical allocation of the economic activity centers in a facility.
An economic activity center is any entity occupying space. The objective of plant layout planning is a more effective work flow at the facility, allowing workers and equipment being more productive.
Facility layout techniques apply to the case where several physical means have to be located in a certain area, either industrial processes or services. The objective of the chapter is not only Plant layout but re-layout also (most common situation for a company). To carry out an appropriate plant layout, its important to take into account the business strategic and tactical objectives
INTRODUCTION
To make a decision about layout planning, 4 different questions must have an answer:
Which centers do we have to consider? How much space and capacity is required for each center?
If there is not enough space, productivity may be reduced. Too much space is expensive and may also reduce productivity.
INTRODUCTION
The plant layout process starts at an aggregate level, taking into account the different departments. As soon as we get into the details, the different issues arise, and the original configuration may be changed through a feedback process. Most (if not all of them) layouts are designed properly for the initial conditions of the business, although as long as the company grows and has to be adapted to internal and external changes, a relayout is necessary.
INTRODUCTION
The reasons for a re-layout are based on 3 types of changes:
Changes in production volumes. Changes in processes and technology. Changes in the product.
The frequency of the re-layout will depend on the requirements of the process.
INTRODUCTION
Lay Out
Types of Plant Layout
Product Layout Process Layout Fixed Position Layout Cellular Layout
All these factors will not be reached simultaneosly, so the best solution will be a balance among them.
The final solution for a Plant Layout has to take into account a balance among the characteristics and considerations of all factors affecting plant layout, in order to get the maximum advantages. The factors affecting plant layout can be grouped into 8 categories:
Materials Machinery Labor Material Handling Waiting Time Auxiliary Services The building Future Changes
Material Handling
Material handling does not add value to the product; its just waste. Objective: Minimize material handling as well as combining with other operations when possible, eliminating unnecessary and costly movements.
The auxiliary services represent around 30% of the space at a facility. The space dedicated to auxiliary services is usually considered as waste.
Its important to have efficient services to insure that their indirect costs have been minimized.
Types of normally determines the type of Plant Layout The production process
plant layout to be applied to the facility:
Fixed position plant layout
Product Layout
Product A Product B
Step 1
Step 2
Step 3 Step 4
Step 1
Step 2 Step 3
Step 4
Product C
Step 1
7-14
Product Layout
This type of plant layout is useful when the production process is organized in a continuous or repetitive way.
Continuous flow: The correct operations flow is reached through the layout design and the equipment and machinery specifications. Repetitive flow (assembly line): The correct operations flow will be based in a line balancing exercise, in order to avoid problems generated by bottle necks.
The plant layout will be based in allocating a machine as close as possible to the next one in line, in the correct sequence to manufacture the product.
Process Layout
Process Layout
Grouping together of machines and/or workers doing similar tasks. Applicable to both manufacturing and non manufacturing operations. Advantages
Flexibility: equipment and personnel can be used where they are needed. Smaller investment in equipment: duplication is not necessary unless volume is large. Expertise: supervisors for each department become highly. knowledgeable about their functions Diversity of tasks: changing work assignments make work more satisfying for people who prefer variety.
228
Fixed-Position Layout
Used when product is large Product is difficult or impossible to move, i.e. very large or fixed All resources must be brought to the site Scheduling of crews and resources is a challenge
Work cells
Definition:
Cellular Layout
Group of equipment and workers that perform a sequence of operations over multiple units of an item or family of items.
Group Technology
Grouping outputs with the same characteristics to families, and assigning groups of machines and workers for the production of each family.
Cellular Layout
Process (Functional) Layout Group (Cellular) Layout
T T M M
T T M M
T T D D
CG SG D D
A cluster CG or cell T
SG D SG D
T M
M D
T
M CG SG
M D D
D
CG
WAGE INCENTIVES
Classification Of Incentives
Labour vs. Management
Incentives may differ depending on whether the employee provides only labour or labour plus management to the operation With a managerial incentive, the employee has control over much of the day to- day decisions Labour incentives can be divided further into skilled or semi-skilled labour Physical vs. Economic Incentives can be based on physical production or a share of the income
Classification Of Incentives
Gross vs. Net
Income incentives can be further divided into incentives that are based on gross income or net income. Gross income incentives are usually easier to figure, but net income incentives tie the incentive to profits. Farm vs. Enterprise Incentives can be based on the entire farm business or an individual enterprise such as hogs or dairy. Whether an incentive is based on the performance of the whole farm or just one enterprise depends on the employees responsibilities.
Types of Incentives
Day work Worker is paid the same constant hourly rate (guaranteed minimum wage GMW), regardless of performance
Piecework (incentive with 100% participation) Worker is paid directly for each piece produced (i.e. directly proportional to performance) Standard hour plan Day work up to 100% performance, piecework (or a sharing plan) above 100% performance
Types of Incentives
Measured day work A progressive record of a worker's performance is used determine base pay for the next pay period. Regardless of the person's performance during that period, that person will receive the new base rate. Ex. Worker performance = actual output/expected output = 175/160 = 1.09 New base rate = base rate 1.09 = Rs. 100 1.09 = Rs. 100.90 If the worker's performance deteriorates, the new base rate also drops. However, some companies will maintain a lower threshold (at least the GMW), below which the base rate can not drop. With this plan, day-today pressures are taken off the worker. However, the incentive is not as strong as for other plans, and it requires extra bookkeeping.
Types of Incentives
Group incentive schemes Group output is measured and used to determine each group members pay
Especially useful for work cells or situations where individual performance can't be easily measured (e.g. shipbuilding, construction, etc.) These schemes have advantages in allowing greater flexibility, reducing competition and encouraging group spirit On the other hand, the individual incentive is reduced and better workers may become discouraged
JOB EVALUATION
JOB ANALYSIS
BASIC PROCEDURE USED TO DEFINE DUTIES , RESPONSIBILITIES AND ACCOUNTABILITY OF A JOB. IT INVOLVES -DETAILED DESCRIPTION OF JOB AND CAPABILITY IN VARIOUS ATTRIBUTES WHICH GO TOWARDS MAKING THE JOB DESCRIPTION SUCCESSFUL -DETERMINING DEPENDENCY AND RELATIONSHIP OF JOB WITH OTHER JOBS IN THE ORG -EXAMINING KNOWLEDGE QUALIFICATION FOR THE JOB
JOB ANALYSIS
JOB ANALYSIS IS A PROCESS THRU WHICH JOB DESCRIPTION AND JOB SPECS ARE DETERMINED AND EVALUATION IS PERFORMED JOB DESCRIPTION IS A DESCRIPTION OF THE JOB CONTENT ENVIRONMENT AND CONDITIONS OF WORK.IT SHOULD CLEARLY DEMARCATE THE BOUNDARIES OF AUTHORITY AND RESPONSIBILITY JOB SPECIFICATION STATES THE MINIMUM ACCEPTABLE PERSONAL PROFILE IN TERMS OF SKILLS ,KNOWLEDGE ,EXPERIENCE AND CAPABILITIES. IT IS A TECHNIQUE THAT SYSTEMATICALLY DETERMINES THE RELATIVE WORTH OF JOBS IN RELATION TO OTHER JOBS IN THE ORG
JOB ANALYSIS
JOB ENRICHMENT IS INCREASING DEPTH OF A JOB SO THAT EMPLOYEES EXPERIENCE GREATER JOB AUTONOMY THRU MPLOYEE EMPOWEMENT AND HENCE ALSO TEND TO GET MORE INVOLVED IN THEIR JOBS JOB INVOLVEMENT IS THE DEGREE TO WHICH EMPLOYEES INVOLVE THEMSELVES IN THE JOB AND INVEST TIME AND ENERGY AND VIEW WORK AS A CENTRAL PART OF THEIR LIFE
EMPLOYEE INVOLVEMENT IS A MATTER OF ASKING PEOPLES OPINION BEFORE MAKING DECISIONS THAT AFFECT THEM EMPLOYEE INVOLVEMENT INVOLVES FORMING GROUPS LIKE QLTY CIRCLE,TPM CIRCLE ETC ALL EMPLOYEES ENCOURAGED TO GIVE CREATIVE AND INNOVATIVE SOLUTIONS (KAIZENS) DEVELOPING MUTUAL TRUST RESPECT BETWEEN EMPLOYER AND EMPLOYEE-EMPL PARTICIPATION IN MGT INVOLVES GIVING OWNERSHIP OF QLTY TO WORKERS ,LISTENING TO THEIR IDEAS AND EMPOWERING THEM TO MAKE MORE DECISIONS IN THE BETTERMENT OF QLTY CONFLICT SITUATIONS TACKLED DIRECTLY CROSS FUNCTIONAL TRAINING AND GREATER CUSTOMER FOCUS EMPHASISE IMPORTANCE OF QLTY IN COMPANY ADVANTAGE BASE INCENTIVES ON QLTY RATHER THAN QUANTITY TEI = LEADERSHIP + TEAM + EMPOWERMENT + COMMITMENT + COMMUNICATION + CONSENSUS
EMPOWERMENT
EMPOWERMENT MEANS GIVING POWER TO LINE LEVEL PEOPLE TO DO WHAT IS REQD TO SATISFY CUSTOMERS AND TRUSTING THE JUDGEMENT OF EMPLOYEES NATURAL EXTENSION OF EMPLOYEE INVOLVEMENT INVOLVES WORKERS PARTICIPATION IN DECISION MAKING EMPOWERMENT ADVOCATED BY DEMING OBJECTIVE OF EMPOWERMENT IS TO TAP THE INTELLECTUAL ENERGY OF ALL EMPLOYEES
IMPORTANCE OF EMPOWERMENT
EMPLOYEES FEEL THEY ARE GIVEN THE OPPORTUNITY TO TAKE DECISIONS AND HENCE IDENTIFY CLOSER WITH THE COMPANY THEY BELIEVE THEIR OPINIONS COUNT THEY GET COMMITED TO QUALITY THEY CONNECT THEIR WORK TO THE COMPANYS GOALS,MISSION AND VISION
FAILURE OF EMPOWERMENT
EMPOWERMENT IS USED AS A TOOL TO MAKE WORKERS VULNERABLE USED AS A MANIPULATIVE TOOL TO CRITICISE AND VICTIMISE MANAGERWS ABDICATE RESPONSIBILITY AND BLAME OTHERS FOR FAILURE NO FEEDBACK CONTROL SYSTEM
262
CHECK SHEETS
SIMPLE TOOLS FOR DATA COLLECTION DATA SHEETS USE COLUMNAR FORMS TO RECORD DATA
Checklist
Simple data check-off sheet designed to identify type of quality problems at each work station; per shift, per machine, per operator
264
HISTOGRAM
GRAPHICALLY SHOWS FREQUENCY OR NUMBER OF OBSERVATIONS OF A VARIABLE RANGE OF HORIZONTAL SCALE SHOULD EXTEND OVER THE FULL RANGE OF ACTUAL OBSERVED VALUES INTERVALS MUST BE OF EQUAL WIDTH THERE MUST NOT BE TOO MANY OR TOO FEW INTERVALS HISTOGRAMS DO NOT SUGGEST CAUSES OF VARIATION NOR DO THEY SHOW DATA VARIATION OVER TIME DATA SHOULD BE INDICATIVE OF TYPICAL PROCESS CONDITIONS AND LARGE ENOUGH TO PROVIDE GOOD CONCLUSIONS
Histograms
A chart that shows the frequency distribution of observed values of a variable like service time at a bank drive-up window Displays whether the distribution is symmetrical (normal) or skewed
Wiley 2007
268
PARETO ANALYSIS
PARETO DISTRIBUTION IS ONE IN WHICH THE CHARACTERISTICS OBSERVED ARE ORDERED FROM LARGEST FREQUENCY TO SMALLEST OFTEN USED TO ANALYSE DATA COLLECTED IN CHECK SHEETS
Pareto Analysis
Technique that displays the degree of importance for each element
Wiley 2007
271
88%
93%
Frequency (Number)
12 5 4
Contamination
2
Misc.
20% 0%
72%
Porosity
Nicks
3%
272
Cumulative Percent
54
72%
SCATTER DIAGRAM
Scatter Diagrams
A graph that shows how two variables are related to one another Data can be used in a regression analysis to establish equation for the relationship
Wiley 2007
274
RUN CHART
SHOWS RESULT OF INSPECTION TAKEN AT PRESCRIBED INTERVALS LINE GRAPH WHERE DATA PLOTTED AGAINST TIME RESULTS ARE PLOTTED AGAINST TIME TO SEE IF EXCESSIVE RESULTS OR PATTERNS EXIST CONSTRUCTING CHART INVOLVES FOLLOWING STEPS: -COLLECT DATA -EXAMINE RANGE OF DATA -PLOT POINTS ON CHART AND CONNECT THEM -COMPUTE AVERAGE OF ALL PLOTTED POINTS AND DRAW AS A HORIZONTAL LINE THROUGH DATA
Process Chart
Shows sequence of events in process Depicts activity relationships Has many uses
Identify data collection points Find problem sources Identify places for improvement Identify where travel distances can be reduced
277
PROCESS FLOWCHART
USED TO HELP ANALYSE A PROCESS OR PIN POINT A PROBLEMBY SEQUENTIALLY SHOWING RELEVANT STEPS IN A PROCESS AND HOW THEY ARE INTER RELATED ALL ACTIVITIES MUST BE SHOWN INCLUDING NON VALUE ADD
D On desk
75 D To buyer
Method Drill
Slow
Tired Overtime
Old Lathe Too many defects
Machinery
280
Cause-and-Effect Diagrams
Called Fishbone Diagram Focused on solving identified quality problem
281
Exhibit S6.8
QUALITY CIRCLES
QUALITY CIRCLE
PARTICIPATORY MGT PROCESS IN WHICH A SMALL GROUP OF PEOPLE AT GRASS ROOT LEVEL ARE INVOLVED QC IS A QLTY,PRODUCTIVITY,SAFETY IMPROVEMENT TECHNIQUE QC IS A HRD AND A PROBLEM SOLVING TECHNIQUE AND IS BASED ON THE FACT THAT SUGGESTIONS AFFECTING WORKPLACE SHOULD BEST COME FROM PEOPLE WHO WORK THERE QC IS A GROUP OF PEOPLE FROM DIFFERENT WORK AREAS WHO MEET ON A REGULAR BASIS FOR RESOLVING PROBLEMS RELATED TO QLTY , PRODUCTIVITY, COST REDUCTION,SAFETY,CUSTOMER SERVICE QC IDENTIFIES PROBLEMS OR OPPORTUNITIES FOR FURTHER IMPROVEMENT THRU ANALYSIS OF DATA RELATED TO WORK PEOPLE EXPERIENCE AUTONOMY AT PLACE OF WORK AND CONTROL DECISIONS THAT AFFECT THEM
Quality Circle
Presentation
Implementation Monitoring
Organization
8-10 members Same area Supervisor/moderator
Training
Group processes Data collection Problem analysis
Solution
Problem results
Problem Identification
List alternatives Consensus Brainstorming
Problem Analysis
Cause and effect Data collection and analysis
CHARACTERISTICS OF QC
SMALL GROUPS FORMED IN WORKPLACE WITH MEMBERSHIP BEING VOLUNTARY MEMBERS TRAINED IN PROVBLEM SOLVING TECHNIQUES ENABLES MEMBERS TO USE HIDDEN TALENTS,SKILLS ENHANCES JOB SATISFACTION THRU CHALLENGES FACED BY WORKERS QC EFFORTS RECOGNISED BY MGT MINIMISES BOREDOM IN WORKPLACE
OBJECTIVES OF QC
IMPROVE QLTY AND PRODUCTIVITY THUS CONTRIBUTING TO IMPROVING AND DEVELOPING ERNTERPRISE REDUCE COSTS OF PRODUCTS BY WASTE REDUCTION,SAFETY,EFFECTIVE UTILIZATION OF RESOURCES,MINIMIZING DEFECTS AND ELIMINATING NON VALUE ADDED ACTIVITIES IDENTIFY AND SOLVE WORK RELATED PROBLEMS MAXIMIZE CREATIVE INTELLIGENCE OF PEOPLE DEVELOP INDIVISUALS AND ASSISTANCE IN SELF ACTUALIZATION INCREASE EMPLOYEE COMMITMENT AND LOYALTY SHARING OF IDEAS AND EXPERTISE
QC OPERATION CYCLE
BASIC PURPOSE OF QC IS TO IDENTIFY AND SOLVE WORK RELATED PROBLEMS EACH PROBLEM PASSES THRU STAGES SUCH AS: -IDENTIFICASTION SELECTION ANALYSIS -IDENTIFICATION OF SOLUTION WITH ALTERNATIVES -EVALUATION OF RISKS AND PROBABILITY -SELECTION OF SOLUTION -PREPARE ACTION PLANS WITH DESIRED OUTCOMES AND RETURNS -PREPARE BUDGETS FOR RESOURCES DURING IMPL -ALLOCATE RESOURCES TO PROJECT -IMPLEMENTATION,REVIEW AND FOLLOW UP
QC METHODOLOGY
WORKER PARTICIPATION IN QC ON VOLUNTARY BASIS FACILITATORS PROVIDED TO ASSIST TEAMS TRG PROVIDED FOR SUPERVISORS AND TEAM MEMBERS PROJECTS INITIATED BY ALL MEMBERS QC ISSUES CHOSEN BY MEMBERS
STRUCTURE OF QC
STEERING COMMITTEE WHICH INCLUDES TOP MGT(CEO,VP,GM,HOD) COORDINATORS(I/F BETWEEN TOP MGT AND LINE OPERATORS) FACILITATORS(SHIFT MGR) CIRCLE LEADERS(SR.FOREMAN) CIRCLE MEMBERS(LINE LEVEL WORKERS) INVITEES AND NON MEMBERS
QC IN ASHOK LEYLAND
SELECTION OF PROBLEM WITH MATERIAL LOSS IN WKSHOP QC FORMED TO SOLVE PROBLEM AND MINIMIZE MATRL WASTAGE AND CONSUMPTION FIGURES RELATED TO LOSSES BEFORE/AFTER QC IMPL BEFORE IMPL AFTER IMPL EXP CONS YRLY 105KG 105KG ACTUAL CONS YRLY 210KG 165KG LOSS KG 105KG 60KG LOSS RS 1.785LACS RS 1.02 LAC RS
QC IN ASHOK LEYLAND
USING QC CAUSES RELATED TO MAN,M/C,MATRL,METHOD DETECTED CAUSES RELATED TO MAN :-LACK OF KNOWLEDGE OF MATRL IMPROPER WK INSTR -EXCESS OPER LACK OF KNOWLEDGE OF OPS/TOOLS CAUSES RELATED TO MACHINES -SUB OPTIMUM CONDITIONS FRICTIONAL WEAR OF PARTS MISALIGNMENT OF PARTS CAUSES DUE TO METHODS -IMPROPER MATRL HANDLING/STORAGE -LACK OF PROPER STD OPER INSTR CAUSES RELATED TO MATERIALS -IMPROPER SPECS TO SUPPLIERS INADEQUATE INSP METHODS REASONWISE % ATTRIBUTABLE FOR LOSS -MAN 35.7% -M/C 28.6% -METHODA 21.4% -MATERIAL 14.3%
BENEFITS OF QC IN BHEL
PERIODIC MEETING OF SHOP FLOOR WORKERS TO SOLVE THEIR WORK RELATED PROBLEMS AND DEVELOP MUTUAL TRUST AND COOPERATION BETWEEN MGT AND WORKERS AND INVOLVES WORKERS IN DECISION MAKING PROCESS IN THEIR AREAS QC LEADS TO ENHANCED PRODUCTIVITY DEVELOPS KNOWLEDGE MGT CULTURE AND PEER KNOWLEDGE IS SHARED
BENEFITS OF QC IN BHEL
QC EFFORTS IMPROVES QLTY OF PRODUCTS AND SERVICES TO CUSTOMER PRODUCTIVITY IMPROVEMENT RESULTS IN REDUCED TIME TO DELIVER AND REDUCED MFG COSTS ENSURES BETTER HOUSE KEEPING QC INCREASES PROFITABILITY BY REDUCTION OF WASTE ENRICHED QLTY OF WORK LIFE BETTER INTER PERSONAL COMMN
QC IN TOYOTA
WIDE USAGE OF QC MEETING ONCE A WEEK FOR 1 HR PEOPLE ENCOURAGED TO GIVE SUGGESTIONS PRINCIPLE OF KAIZEN FOLLOWED PROBLEMS ADDRESSED INCLUDE SAFETY,COST REDN,QLTY,PRODUCTIVITY,EQPT PERFORMANCE CERTAIN AREAS ARE OFF LIMIT EG WAGES,COMPANY OPERATING PRINCIPLES,HR POLICIES,SUPPLIER SELECTION,SALES AND MKTNG POLICIES AND PERSONALITIES HOWEVER PRIVATE SUGGESTIONS IN ABOVE AREAS COULD BE OFFERRED AS KAIZEN CREATION OF ANGER VENTING ROOM
ERGONOMICS
ERGONOMICS
The word Ergonomics comes from the Greek words Ergos--(work) and Namos-- (natural law).
DEFINITION OF ERGONOMICS
APPLICATION OF THE HUMAN BIOLOGICAL SCIENCES IN CONJUNCTION WITH ENGG SCIENCES TO THE WORKER AND HIS WORKING ENVT TO OBTAIN MAX SATISFACTION FOR WORKER AND ENHANCE PRODUCTIVITY OBJECTIVE IS TO ENSURE WORKER SATISFACTION AND ENHANCE PRODUCTIVITY ERGONOMICS ACHIEVES THE ABOVE BY STUDY OF CONDITIONS IN WHICH PEOPLE WORK EFFECTIVELY AND COMFORTABLY IT ENTAILS MAKING WORKING CONDITION SYNERGETICAL TO HUMAN ACTIVITIES
DEFINITION OF ERGONOMICS
ALSO CALLED HUMAN ENGINEERING DEFINED AS THE SCIENTIFIC STUDY OF RELATIONSHIP BETWEEN MAN AND HIS WORKING ENVIRONMENT ERGONOMICS IMPLIES FITTING THE JOB TO THE WORKER COMBINES THE KNOWLEDGE OF PSYCHOLOGIST ANATOMIST AND BIO METRICIAN
ERGONOMICS
Definition:
u Ergonomics is an interdisciplinary approach
toward adapting the manmade environment around man, rather than man around the environment.
ERGONOMICS
Definition:
u Ergonomics is the study of how human beings relate to their work environment. The result of ergonomics is the adaptation of the workstation design and work tools to suit the individual performing a particular job function. The application of ergonomic principles to workstation design can result in increased effectiveness, work quality, health and safety, and job satisfaction.
SCOPE OF ERGONOMICS
SUGGEST BEST WAY OF USING HUMAN BODY THRU METHOD STUDY SUGGEST BEST WAY OF ARRANGING WORKPLACE SUGGEST THE BEST DESIGN OF TOOLS AND EQUIPMENT
OBJECTIVES
Provide basic training regarding the identification, evaluation, and control of ergonomic exposures and hazards. This will include: The role of ergonomics Ergonomics-related injuries and their causes Proper workstation arrangement Controlling ergonomic hazards
DEFINITION OF QUALITY
-JURAN-QLTY IS FITNESS FOR USE -CROSBY-CONFORMANCE TO REQMT FROM THE USERS POINT OF VIEW QLTY IS MEETING NEEDS AND WANTS OF THE USER. USER NOT ONLY EXPECTS PRODUCT/SERVICE TO MEET HIS FUNCTIONAL REQUIREMENTS-PRIMARY&SECONDARY BUT ALSO HIS EMOTIONAL REQUIREMENTS QUALITY MEANS -DEGREE OF EXCELLENCE -CONFORMANCE WITH REQUIREMENTS -ABILITY OF FUNCTIONALITIES TO SATISFY STATED OR IMPLIED NEEDS -FREEDOM FROM DEFECTS IMPERFECTION -SATISFYING AND DELIGHTING CUSTOMERS QUALITY IS PRODUCT/PROCESS/SERVICE ORIENTED
DEFINITION OF QUALITY
QUALITY IS - DEFINED BY CUSTOMER - MEASURE OF ACHIEVEMENT OF CUSTOMER SATISFACTION. - FULFILING CUSTOMER NEEDS & WANTS - VALUE FOR MONEY - DEFECTLESS PRODUCT TRADITIONAL WAY IN WHICH QUALITY IS EXPRESSED QUANTITATIVELY IS AQL (ACCEPTABLE QUANTITY LEVEL) WHICH IS EXPRESSED AS A % OF DEVIATION FROM STD. E.G. 1% AQL ON AN ORDER OF 1000 PRODUCT QTY TO BE MFG IS 10 DEFECTIVE OR PRODUCT NUMBERS NOT CONFORMING TO SPECIFICATIONS. AQL IS OFTEN FORCED ON SUPPLIERS BY CUSTOMERS ANOTHER MEASURE OF QUANTITATIVE EXPRESSION OF QUALITY IS SIGMA.
QUALITY BARRIERS
LACK OF TOP MGT COMMITMENT POOR UNDERSTANDING OF QLTY FUNCTIONAL BOUNDARIES CUSTOMER EXPECTATIONS SPEED OF ACTION GAP BETWEEN PROCESS EXPECTATION AND ACHIEVEMENT VENDOR CAPABILITY COST
CUSTOMER FOCUS
ORGS DEPEND ON CUSTOMERS AND SHOULD UNDERSTAND CURRENT AND FUTURE NEEDS, MEET CUSTOMER REQUIREMENTS AND STRIVE TO EXCEED EXPECTATIONS COMMUNICATION WITH CUSTOMERS CUSTOMER CARE MANAGEMENT COMMITMENT
CONTINUAL IMPROVEMENT
CONTINUAL IMPROVEMENT OF ORG OVERALL PERFORMANCE SHOULD BE A PERMANENT OBJECTIVE CONTINUAL IMPROVEMENT REFLECTED THRU REQMNT ADDRESSING: -IMPROVEMENT PROCESSES -IDENTIFYING PROCESSES -REVIEWING DOCUMENTATION OF PROCESSES
PEOPLE INVOLVEMENT
PEOPLE AT ALL LEVELS ARE ESSENCE OF ORG AND THEIR FULL INVOLVEMENT ENABLES ABILITIES TO BE USED FOR ORG BENEFIT INVOLVES: -PARTICIPATION IN DESIGN REVIEWS -DEFINING OBJECTIVES RESPNSBLTS AUTHORITIES -CREATING ENVT OF MOTIVATION -INTERNAL COMMUNICATION -IDENTIFYING COMPETENCY NEEDS
FACTUAL APPROACH
MGT BY FACT IS CORNERSTONE VALUE FOR EFFECTIVE PLANNING OPERATIONAL DECISION MAKING AT ALL LEVELS EMPLOYEE INVOLVEMENT EMPOWERMENT AND LEADERSHIP DATA ON WHICH DECISIONS ARE BASED SHOULD BE FACTUAL ACCURATE TIMELY RELIABLE AND CONSISTENT DATA SHOULD NOT BE BASED ON INTUITION OR GUT FEEL EFFECTIVE DECISIONS BASED ON ANALYSIS OF DATA
FACTUAL APPROACH
PRINCIPLE IS REFLECTED THRU REQMNT ADDRESSING: -REVIEWS MEASUREMENT AND MONITORING TO OBTAIN FACTS -CONTROL OF MEASURING PROCESSES -ANALYSIS TO OBTAIN FACTS FROM INFO -RECORDS FOR DOCUMENTING FACTS -APPROVAL BASED ON FACTS
SYSTEMS APPROACH
IDENTIFYING UNDERSTANDING AND MANAGING INTERRELATED PROCESSES AS A SYSTEM CONTRIBUTING ORG EFFECTIVENESS AND EFFICIENCY IN ACHIEVING OBJ SYSTEMS APPROACH REFLECTED THRU THE REQMNT ADDRESSING: -ESTABLISHMENT IMPLEMENTATION AND MAINTENANCE OF MGT SYSTEM -INTERCONNECTING INTERRELATING AND SEQUENCING OF PROCESSES AND ESTABLISHMENT OF LINKS BETWEEN PROCESSES -ESTABLISHING MEASUREMENT PROCESSES
PROCESS APPROACH
DESIRED RESULT ACHIEVED MORE EFFICIENTLY WHEN RELATED RESOURCES AND ACTIVITIES MANAGED AS A PROCESS PROCESS APPROACH IS ABOUT MANAGING PROCESSES -THAT HAVE A CLEARLY DEFINED OBJ THAT IS BASED ON NEEDS -THAT ARE DESIGNED TO ACHIEVE OBJ THRU TASKS THAT USE CAPABLE RESOURCES HUMAN,PHYSICAL,INTELLECTUAL,INFORMTNL AND FINANCIAL -PRODUCE OUTPUTS THAT SATISFY CUSTMRS -MEASURE REVISE CONTINUALLY IMPROVE PROCESS EFFICIENCY AND EFFECTIVENESS
LEADERSHIP
ESTABLISHES UNITY OF PURPOSE AND DIRECTION FOR ORG LEADERS SHOULD CREATE AND MAINTAIN INTERNAL ENVT IN WHICH PEOPLE ARE FULLY INVOLVED IN ACHIEVING ORG OBJECTIVE LEADERSHIP PRINCIPLES INVOLVE -SETTING OF OBJECTIVES -PLANNING - INTERNAL COMMN -CREATING EFFECTIVE WORKING ENVT
COMPONENTS OF LEADERSHIP
Failures in an org are faults of systems controlled by mgt. Work must be analysed and improved Process must be standardised to minimize variation in output Customer focus external and internal Improved relations with suppliers
COMPONENTS OF LEADERSHIP
Emphasis on process improvement Total employee commitment
COMPONENTS OF LEADERSHIP
Emphasis on process improvement Total employee commitment
EDWARD DEMING
STRESSES ON IMPROVING QLTY IN MFG THRU USE OF SQC TECHNIQUES AND SHOWED HOW PRODUCTIVITY PROFITABILITY ROI CAN BE IMPROVED THRU QLTY IMPROVMNT QLTY OF DESIGN,QLTY OF CONFORMANCE,QLTY OF SALES AND QLTY OF SERVICE APPROACH PROPOSED THRU 14 PRINCIPLES OF QLTY MGT WHICH FOCUS ON -CONFORMANCE TO REQUIREMENTS -TOP MGT COMMITMENT TO QLTY -PROCESS DESIGN AND CONTROL -CONTINUOUS CORRECTION OF QLTY PROBLEMS -EMPHASIS ON QLTY RATHER THAN COST -EMPLOYEE PARTICIPATION IN QLTY MGT -QUALITY INFDORMATION SYSTEMS -SYSTEM OF PREVENTION AND NOT APPRAISAL OF QUALITY -ZERO DEFECT AS THE IDEAL PERFORMANCE STANDARD -PRICE OF NON CONFORMANCE AS A MEASURE OF QUALITY
14 PRINCIPLES OF DEMING
CREATE STRATEGY TOWARDS IMPROVEMENT OF PRODUCT WITH AN AIM TO BE COMPETITIVE CREATE LEADERSHIP FOR CHANGE MGT ELIMINATE NEED FOR INSPECTION BY BUILDING QLTY INTO PRODUCT AWARD BUSINESS ON QLTY NOT PRICE COST REDN THRU CONTINUOUS IMPROVEMENT OF QLTY CONTINUOUS TRG FOR EMPLOYEES QLTY MGT SHOULD BE AN IMPORTANT CRITERIA FOR PERSONNEL APPRAISAL ENCOURAGE PEOPLE TO CONTRIBUTE EFFECTIVELY BREAK DOWN INTER DEPT BARRIERS ELIMINATE SLOGANS AND CLICHES IN WORKPLACE CORELATE WORK STDS TO QLTY STDS TARGETS SHOULD INCLUDE QUANTITATIVE AND QUALITY MEASURES CONSTITUTE SELF IMPROVEMENT PROGRAMS INVOLVE EVERYBODY IN ORG TO ACCOMLISH BUSINESS PROCESS QLTY IMPROVEMENT
1. Plan
Identify problem and develop plan for improvement.
3. Study/Check
Assess plan; is it working?
2. Do
Implement plan on a test basis.
DEMING PDCA
PDCA IS PLAN DO CHECK ACT PLAN -IDENTIFY PROBLEM BY FACTS AND DATA -COLLECT DATA AND DETERMINE GOALS TO BE ACHIEVED -ANALYSE PROBLEM AND POSSIBLE CAUSES AND ISOLATE ROOT CAUSE DO -REMEDIAL STEPS FOR ERADICATION OF ROOT CAUSE OF PROBLEM CHECK -CHECK,MEASURE,ANALYSE AND MONITOR RESULTS ACT -STANDARDISE IMPROVEMENTS -CONTINUOUS REVIEW AND IMPROVEMENT
JOSEPH JURAN
DEFINES QUALITY AS FITNESS FOR USE FITNESS ACHIEVED THRU QUALITY OF DESIGN,QLTY OF CONFRMNCE AVAILABILITY AND SERVICE DETAILED 3 STEPS FOR QLTY CTRL -QLTY CTRL:GAIN CONFORMANCE THRU PREVENTION OF DEFECTS -QLTY IMPROVEMENT:CONTINUOUS IMPROVEMENT OF QLTY AND INCREASED ADHERENCE TO CONFORMANCE -SETTING GOALS,ESTABLISHING PLANS FOR MEETING GOALS AND EXECUTING PROJECTS TO ATTACK PROBLEMS
JOSEPH JURAN
JURAN EMPHASISES ON QLTY PLANNING,QLTY THRU PRODUCT DESIGN,QLTY AUDIT,QLTY COSTS TEN STEPS TO QLTY IMPROVEMENT:
JOSEPH JURAN
DEFINES QUALITY AS FITNESS FOR USE FITNESS ACHIEVED THRU QUALITY OF DESIGN,QLTY OF CONFRMNCE AVAILABILITY AND SERVICE DETAILED 3 STEPS FOR QLTY CTRL -QLTY CTRL:GAIN CONFORMANCE THRU PREVENTION OF DEFECTS -QLTY IMPROVEMENT:CONTINUOUS IMPROVEMENT OF QLTY AND INCREASED ADHERENCE TO CONFORMANCE -SETTING GOALS,ESTABLISHING PLANS FOR MEETING GOALS AND EXECUTING PROJECTS TO ATTACK PROBLEMS
JOSEPH JURAN
JURAN EMPHASISES ON QLTY PLANNING,QLTY THRU PRODUCT DESIGN,QLTY AUDIT,QLTY COSTS TEN STEPS TO QLTY IMPROVEMENT:
JURANs TRILOGY
QUALITY PLANNING A PROCESS FOR PRESENTING THE QUALITY GOALS AND PREPARATIONS TO MEET THESE GOALS QUALITY CONTROL THE PROCESS OF ENSURING THAT GOALS ARE ACHIEVED QUALITY IMPROVEMENT PROCESS OF BREAKING THROUGH TO HIGHER LEVELS OF QUALITY AND MEETING THE NEEDS OF CUSTOMERS FOE SUPERIOR PERFORMANCE
AJAY PIRAMAL GROUP MAHINDRA AND MAHINDRA OTIS ELEVATORS MUKAND INDUSTRIES TATA GROUP BOMBAY DYEING MARICO LTD PUNJAB TRACTORS LTD
QUALITY ASSURANCE
PRIMARY CONCERN IS QUALITY ASSURANCE EMPHASIS ON PRODUCTION LINE AND QUALITY FROM THE FIRST STAGE QUALITY SYSTEMS DEVELOPMENT IMPLEMENTATION OF QFD, COST OF QUALITY, FMECA, VALUE ANALYSIS MOTTO IS DO THE RIGHT THING ALWAYS ELIMINATE NON VALUE ACTIVITIES AND FUNCTIONALITIES
QUALITY ASSURANCE
QUALITY ASSURANCE IS A PREVENTIVE BASED SYSTEM WHICH IMPROVED PRODUCT/ SERVICE BY ELIMINATING THE ROOT CAUSE OF PROBLEM LASTING AND CONTINUOUS IMPROVEMENT IN QUALITY CAN BE ACHIEVED BY DIRECTING ORG EFFORTS TOWARDS PLANNING AND PREVENTING PROBLEMS FROM OCCURING AT SOURCE QA FOCUSES ON PROVIDING CONFIDENCE THAT QLTY REQMNTS WILL BE FULFILED (ISO 9000:2000)
QUALITY ASSURANCE
ADDL FEATURES REQD WHEN PROGRESSING FROM QC TO QA ARE QMS TO INCREASE CONFORMITY, SEVEN QLTY CONTROL TOOLS, SPC, FAILURE MODE EFFECT ANALYSIS AND QLTY COSTS ACCENT IS ON PREVENTION OF NON CONFORMANCE EMPHASIS IS ON DESIGN IMPROVEMENT, PROCESS CONTROL IMPROVEMENT, ETC. QA IS A PREVENTION BASED SYSTEM WHICH INCREASES PRODUCTIVITY BY EMPHASISING ON DESIGN ASPECTS OF PRODUCT / SERVICE
QUALITY ASSURANCE
BY INTEGRATING QLTY INTO PLANNING & DESIGN STAGE IT STOPS NON CONFORMITY FROM OCCURING PROACTIVE APPROACH WHICH LOOKS AT PROCESS CONFORMITIES RESULTING IN PRODUCT CONFORMITIES SIX SIGMA ADVOCATES A METHODOLOGY CALLED PDCA QLTY CREATED AT DESIGN STAGE CHANGING FROM DETECTION TO PREVENTION REQUIRES NEW OPERATING PHILOSOPHY SUCH AS CROSS FUNCTIONAL TEAMS AND ROOT CAUSE ANALYSIS
COST OF QUALITY
MOST IMPORTANT CONSIDERATION IN TQM PROVIDES ABILITY TO ENHANCE CORPORATE PROFIT COST OF QLTY IS CARDINAL FOR JUDGEMENT OF PROCESS EFFECTIVENESS QLTY COSTS ARE DIRECTLY PROPORTIONAL TO THE QLTY CONFORMANCE OF THE PRODUCT MEASUREMENT OF COSTS HELPS TO HIGHLIGHT IMPORTANCE OF PRODUCT QLTY;FORMS BASIS OF DECISION MAKING;IDENTIFIES AREAS NEEDING IMPROVEMENT;MEASURES EFFECTS OF ACTIONS TAKEN; QLTY COSTS ARE CATEGORIZED INTO 4 MAJOR CATEGORIES-PREVENTION COSTS;APPRAISAL COSTS;FAILURE COSTS(INTERNAL AND EXTERNAL)
QLTY COSTING
QUALITY COSTS ARE INCURRED DURING THE ENTIRE PRODUCT LIFECYCLE eg DESIGNING,IMPLEMENTING,OPERATING,MAINTAINING, COSTS INCURRED IN MAKING CONTINUOUS IMPROVEMENT TO PRODUCT/PROCESS AND SUSTAINING QLTY COSTS INCURRED IN PRODUCT/SERVICE FAILURE QLTY COSTS CAN RANGE FROM 5% TO 25% OF SALES ALMOST 90% TO 95% OF THESE COSTS COME FROM APPRAISAL AND FAILURES REDUCING FAILURE COSTS BY ELIMINATING CAUSES OF FAILURE CAN LEAD TO REDUCTION OF APPRAISAL COSTS USAGE OF ACTIVITY BASED COSTING THRU COST DRIVERS MAKES IT EASIER TO GATHER QLTY RELATED COSTS ABC BREAKS DOWN COSTS INTO ELEMENTS CALLED COST DRIVERS eg m/c set up FOR EACH COST DRIVER AN OVERHEAD RATE IS DETERMINED COST DRIVERS RESULT IN MORE ACCURATE COSTING AND ENABLES QLTY COST ASSOCIATED WITH AN ACTIVITY TO BE IDENTIFIED
APPRAISAL COSTS
COSTS INCURRED TO MEASURE EXTENT OF CONFORMANCE AND INCLUDE COSTS MENTIONED BELOW -MEASURING,INSPECTING,TESTING AND AUDITING PERFORMANCE TO DETERMINE CONFORMANCE WITH STDS -QUALIFICATION TESTS FOR DESIGN REQUIREMENTS -EVALUATING PURCHASED ITEMS AND INSPECTION COSTS OF INCOMING MATERIAL -COST OF STORAGE OF MATERIAL AWAITING INSPECTION -EMPLOYEE AND EQUIPMENT PERFORMANCE -IN PROCESS INSPECTION AND CONTROL -FINAL TESTING AND INSPECTION -PRODUCTION TRIALS -MATERIAL CONSUMED DURING INSPECTION AND TESTING -FIELD PERFORMANCE TESTING -MAINTENANCE AND CALIBRATION OF EQUIPMENT -AUDIT OF PREVENTIVE SYSTEM TO ENSURE EFFECTIVENESS
PREVENTION COSTS
AIMED AT PREVENTING DEFECTS AND BUILDING ACCEPTABLE QLTY INTO PRODUCTS AND SERVICES INCLUDES TRAINING, DESIGNING PROCEDURES, VENDOR ASSURANCE EXERCISES,PROCESS CAPABILITY BUILDING ,TRAINING AND CONSUMER RESEARCH ORIENTED AT IMPROVING QLTY,PLANNING QUALITY ASSURANCE PREVENTION IS AVOIDABLE ACTIVITY AND SHOULD BE REPLACED BY TQM WHICH ADVOCATES COST OF BUILDING ACCEPTABLE QLTY PREVENTIVE COSTS INCLUDE DEVELOPMENT AND MAINTENANCE COSTS AS WELL AS QLTY PLANNING WHICH INCLUDESCOSTS INCURRED IN MFG PROCESS ,PROCESS RELIABILITY, PROCEDURE MANUALS,VENDOR DEVELOPMENT COSTS ,ADMIN COSTS,TRAINING COSTS, AND QLTY AUDIT COSTS
FAILURE COSTS
TWO CATEGORIES: INTYERNAL FAILURE COSTS AND EXTERNAL FAILURE COSTS INTERNAL FAILURE COSTS ARE COSTS INCURRED BECAUSE OF DEFECTS IN PRODUCT BEFORE SHIPMENT TO CUSTOMER AND INCLUDES COSTS SUCH AS: -COST OF SCRAPPING PRODUCT -COST OF REWORK -COST OF LOSS OF PRODUCTIVE TIME LOSS DUE TO DEFECTS SALE -LIABILITY INSURANCE COST OF OPPORTUNITY LOSS EXTERNAL FAILURE COSTS REPRESENTS COSTS INCURRED AFTER DELIVERY TO CUSTOMER AND INCLUDES HEADS SUCH AS COST OF COMPLAINT HANDLING,COST OF REPLACEMENT,WARRANTY COST OF REPAIRS AND EXTENDED WARRANTY,COST OF ADDITIONAL CLAIMS TO BE PAID TO CUSTOMER TO COVER LITIGATION COSTS AND PENALTY COSTS,LOST CUSTOMERS,BAD DEBT,SALES RETURNS
COST OF QUALITY
MANY ORG ARE UNAWARE OF HOW MUCH IT COSTS THEM TO PRODUCE NON QLTY COST OF QLTY DOES NOT SHOW UP IN PROFIT/LOSS STATEMENTS IT COULD COST COMPANIES AS MUCH AS 40-50% OF SALES TURNOVER TO GET THINGS RIGHT TQM HAS NOTHING TO DO WITH COST REDUCTION MEASURE THE INTANGIBLES IN THE SERVICE AREAS FIRST THAT IS WHERE THE REALWASTE IS EVIDENT
COST OF QUALITY
80-85% OF THE PROBLEMS ORIGINATE FROM NON MFG AREAS COST OF QLTY IS COMPOSED OF THE COST OF ERRORS AND REWORK COST OF INSPECTION AND COST OF PREVENTION REWORK AND INSPECTION COSTS CAN BE REDUCED THRU INCREASE IN ACTIVITIES OF PREVENTION ALL FUNCTIONS SHOULD IDENTIFY COQ MEASURES
TQM IN MARKETING
TQMMAR INVOLVES CONTINUOUS IMPROVEMENT IN THE MARKETING FUNCTION COMPANY OPERATIONS MUST BE COORDINATED AND MATCHED WITH NEEDS OF CUSTOMERS EVERYBODY WHO WORKS FOR THE COMPANY MUST PARTICIPATE IN A TOTAL MARKETING ENVIRONMENT
CLARIFY THE VISION IN RELATION TO MKT OPPORTUNITIES eg WHAT SORT OF BUSINESS WE WISH TO BE IN SET TANGIBLE GOALS TO EXPRESS WHAT THE COMPANY WANTS TO ACHIEVE eg LOW COST PRODUCER CHALLENGE DEVELOP AWARENESS AND KNOW OF WHERE COMPANY IS NOW,HOW SITUATION HAS EVOLVED AND WHAT TRENDS ARE OPEN IN THE FUTURE eg COMPARITIVE PERCEPTION BETWEEN CUSTOMERS AND SALESMEN MAINTAIN BUSINESS ACTIVITIES TO ENSURE THAT STRATEGIES AND TACTICS ARE MUTUALLY REENFORCING eg APPLY DEMING PDCA CYCLE IN STRATEGIC PLANNING AND DEPLOYMENT SET DYNAMIC STANDARDS TO CREATE CLEAR AND CONSISTENT OPERATING MILESTONES WHICH ARE RELEVANT TO CHANGING DYNAMICS OF MKTPLACE PLANNED IMPLEMENTATION DESIGNED TO ENSURE STRATEGIES AND POLICIES ARE PUT INTO PLACE THROUGH MARKETING PLANNING SYSTEMS ESTABLISH SOUND FEEDBACK CONTROL SYSTEMS TO REPORT ANALYZE AND RECTIFY THREATENING AND OUT OF CONTROL SITUATIONS
TQM IN PURCHASING
ORGANIZATIONWIDE PARTICIPATION IN THE IMPROVEMENT OF THE LOGISTIC PROCESS TO MEET THE NEEDS OF THE CUSTOMER IN MFG COMPANIES AROUND 50% OF PRODUCT COST COMES FROM MATERIAL COST IN SUPPLY CHAIN AREA PURCHASE QLTY IS CONSIDERED PARAMOUNT TO THE PROFITABILITY OF THE BUSINESS AND HENCE ACCENT ON PURCHASE QLTY PURCHASING NEEDS TO BE HENCE CONSIDERED AS A STRATEGIC FUNCTION
TQM IN PURCHASING
PURCHASING EFFECTIVENESS PURCHASING EFFICIENCY
PURCHASING EFFECTIVENESS
PURCHASING PRICE/COST DIMENSION PURCHASING QUALITY DIMENSION PURCHASING LOGISTICS DIMENSION
PRICE/COST DIMENSION
MATERIAL COSTS/PRICES COMPARISON COORDINATION TRANSPORTATION
QUALITY DIMENSION
SPECIFICATIONS REJECTS PURCHASING ENGINEERING REWORK PRODUCTION STOPS
LOGISTICS DIMENSION
LEAD TIMES ORDER QUANTITY INVENTORIES VENDOR PERFORMANCE DELIVERY PERFORMANCES
PURCHASING EFFICIENCY
PURCHASING ORGANIZATION DIMENSION -WORKLOAD ORDERS/QUOTATIONS -PROCEDURES -INFORMATION SYSTEM -MANAGEMENT -EXPERTISE
TQM IN HR
NEED TO DEFINE HR CAPABILITIES AND CAPACITY REQUIRED TO ACHIEVE SHORT AND LONG TERM GOALS HR QLTY RANGES FROM EFFECTIVE TRANSLATION OF ORG STRATEGIC GOALS TO HR LONG TERM AND SHORT TERM TARGETS AND TRANSLATE THEM INTO EFFECTIVE
TQM IN FINANCE
Effective risk management Expenditure control with respect to budget Reduced cost of operations Effective internal controls adhering to clause 49 , sox 404 and sas 70 Reduced cost of capital thru judicious borrowing Effective working capital management and minimized debts
CASE STUDY OF TQM IMPLEMENTATION AT ASHOK LEYLAND ASHOK LEYLAND HAS CHOSEN A TQM MODEL WHICH IS BASED
ON THE FOLLOWING PILLARS - TOTAL QUALITY CONTROL - JUST IN TIME - TOTAL PRODUCTIVE MAINTENANCE MODEL DESCRIBED IN THEIR PURSUIT OF WORLD CLASS MFG PURSUIT STEPS - CHANGE MGT & WORKER INVOLVEMENT / OWNERSHIP - BENCHMARKING OF TQM GOALS - CREATION OF SKILLS / MULTI SKILLS FOR TQM - CREATION OF PROCESSES FOR MONITORING OF IMPROVEMENT AND QUALITY CONTROL - IMPLEMENTATION OF INITIATIVES SUCH AS 5S, AUTONOMOUS MAINTENANCE, DESIGN FOR QUALITY, KAIZEN etc AIMED AT MAXIMISING THROUGHPUT OF PROCESSES AS PER CUSTOMER REQMNT.
CUSTOMER PERCEIVED SERVICE QUALITY IS VIEWED AS A RESULT OF TECHNICAL (OUTPUT) QLTY AND FUNCTIONAL (PROCESS) QLTY. TECHNICAL REFERS TO TRADITIONAL QC IN MFG FUNCTIONAL IS WAY SERVICE IS DELIVERED THRU PROCESS IN WHICH CUSTOMER IS A PARTICIPANT CUSTOMER EVALUATES QLTY DURING OR AFTER SERVICE TEN DETERMINANTS OF SERVICE QUALITY - TANGIBLES SERVICE SHOULD BE A TANGIBLE FACILITY OR ADVICE RENDERED TO CUSTOMER - RELIABILITY CONSISTENCY OF PERFORMANCE AND ABILITY TO HONOUR PROMISED - RESPONSIVENESS READINESS AND TIMELINESS TO PROVIDE SERVICE
NO FORMAL STRATEGY OR METHOD LACK OF EFFECTIVE COMMUNICATN INADEQUATE TRG AND FOCUS ON QLTY LACK OF TOP MGT COMMITMENT AND INCOMPATIBLE STRUCTURES AND ISOLATED INDIVIDUALS LACK OF COMPETENCE OF LEADERS INADEQUATE DATA SYSTEMS AND ANALYSIS THRU UNAVAILABILITY OF PROPER TOOLS NO CUSTOMER FOCUS LACK OF PROPER SYSTEMS AUDIT LACK OF CROSS FUNCTIONAL EFFORTS EMPHASIS ON QUICK FIXES INABILITY TO CHANGE CULTURE IMPROPER PLANNING INEFFECTIVE MEASUREMENT TECHNIQUES LACK OF EMPOWERMENT FAILURE TO CONTINUALLY IMPROVE
POKA YOKE
POKAYOKE
TECHNIQUE USED TO PREVENT ERRORS BEING CONVERTED TO DEFECTS QA APPROACH NON STATISTICALLY DRIVEN BASED ON ASSUMPTION THAT MISTAKES WILL OCCUR UNTIL PREVENTIVE MEASURES ARE TAKEN AFTER EVERY OPER PRODUCT ANALYSED FOR COMPLETENESS OF SPECS AND ADHERENCE TO QLTY AND IF EXCESS VARIATION PROCESS STOPPED SOURCE OF MISTAKE TO BE KNOWN ANALYSED AND CORRECTED EMPHASIS ON SOURCE ANALYSIS WHICH CHECKS FOR FACTORS WHICH CAUSE MISTAKES AND SOLUTIONS FOUND AND APPLIED TO PREVENT REOCCURENCE FORMIDABLE TOOL FOR ACHIEVING ZERO DEFECT ENCOURAGES WORKERS TO BECOME SENSITIVE TO QLTY ISSUES AND AVOIDS PASSING RESPONSIBILITY TO QLTY DEPT ENCOURAGES A BUILT IN QLTY CHECK SYSTEM DRASTICALLY REDUCES REWORK AND REJECTS AND OVERALL LEAD TIME
ADVANTAGES OF POKAYOKE
REMOVES DEFECTS FROM SOURCE FASTER DEFECT DETECTION IMPROVES ENVT SAFETY ENSURES IMMEDIATE FEEDBACK IMPROVES EQPT EFFECTIVENESS AND RELIABILITY PROMOTES WORK CULTURE FOR PERFECTION
Agenda
Why does it always seem we have plenty of time to fix our problems, but never enough time to prevent the problems by doing it right the first time?
412
Failure Mode:
The manner in which a system fails.
Failure Modes
Premature operation Failure to operate on time Intermittent operation Failure to cease operation on time Loss of output or failure during operation Degraded output or operational capability Unique failure conditions
FMEA is an inductive (bottom-up) engineering analysis method. It is intended to analyze system hardware, processes, or functions for failure modes, causes, and effects. Its primary objective is to identify critical and catastrophic failure modes and to assure that potential failures do not result in an adverse effect on safety and system operation. It is an integral part of the design process. It is performed in a timely manner to facilitate a prompt action by design organization and project management.
416
FMEA is a Tool
FMEA is a tool that allows you to: Prevent System, Product and Process problems before they occur reduce costs by identifying system, product and process improvements early in the development cycle Create more robust processes Prioritize actions that decrease risk of failure Evaluate the system,design and processes from a new vantage point
A Systematic Process
FMEA provides a systematic process to: Identify and evaluate
potential failure modes potential causes of the failure mode
Identify and quantify the impact of potential failures Identify and prioritize actions to reduce or eliminate the potential failure Implement action plan based on assigned responsibilities and completion dates Document the associated activities
MIL-STD-1629A, Procedures for Performing a FMECA, discusses the FMECA as a two-step process:
Failure Modes and Effects Analysis (FMEA). Criticality Analysis (CA).
Criticality analysis can be done quantitatively using failure rates or qualitatively using a Risk Priority rating Number (RPN). CA using failure rates requires extensive amount of information and failure data. A RPN is relatively simple measure which combines relative weights for severity, frequency, and detectability of the failure. It is used for ranking high risk items.
422
Effects
Fire and Explosion
Fire and Explosion Fire and Explosion Fire and Explosion Fire and Explosion
Turbine Exhaust External Duct Assembly leakage of hot exhaust P/N gas (System 10206-0002-102 A and/or B)
6. Contamination Fire and during assembly Explosion 7. Improperly lockwired Fire and explosion
423
METHODOLOGY OF FMEA
IDENTIFY PROCESS CHARACTERISTICS IN EACH OPERATION DEFINITION OF WHAT IS FAILURE-TOTAL,PARTIAL WITH EFFECTS FIND OUT ALL POSSIBLE FAILURE MODES AND ANALYSE EFFECTS ESTIMATE SERIOUSNESS OF FAILURE MODES AND EFFECT TO CUSTOMER BY RATING FAILURE IN TERMS OF RISK PRIORITY NUMBER FIND OUT ROOT CAUSE OF FAILURE SUGGEST ACTIONS TO IMPROVE DETECTION AND ELIMINATE FAILURE MODE OR REDUCE OCCURRENCE AND IMPACT FAILURES ADDRESSED BASED ON RPN OBJECTIVE OF FMEA TO ANTICIPATE FAILURES INTER RELATIONSSHIP BETWEEN FAILURES DRAWN THRU FAULT TREE ANALYSIS USING AND/OR GATES FTA/FMEA DEVELOPED BY BELL LAB AND WIDELY USED BY US DEFENCE UNDER THE INITIATIVE RCM 1
Strategy to Improve
Try to eliminate the failure mode.
Minimize the severity of the failure. Reduce the occurrence of the failure mode.
CATEGORIES OF FMEA
SYSTEM FMEA USED TO ANALYSE COMPONENTS/SUBSYSTEMS IN EARLY STAGE OF DESIGN CONCEPT DONE THRU COP AID SIMULA DESIGN FMEA USED TO ANALYSE PRODUCTS/PARTS BEFORE THEY ARE RELEASED TO MFG THRU CAE-CAD PROCESS FMEA APPLICABLE IN ANALYSIS OF FAILURE MODES CAUSED BY PROCESS DEFICIENCES SEVICE FMEA USED TO ANALYSE SERVICES BEFORE THEY REACH THE CUSTOMER THRU ENSURING OF QLTY AND RELIABILITY OF SERVICE
FMEA Process
Define system & analysis scope Construct block diagrams Assess each block for effect on system List ways that components can fail Assess failure effects for each failure mode Identify single point failures Determine corrective actions Document results on worksheet
=QFD
Ready?
Determine Effects of The Failure Mode
=Brain Storming
= What we Define the FMEA are and are Scope not working
Determine Product or Process Functions 432
Severity Rating
Occurrence Rating
Determine Controls
6 6
Detection Rating
OUTPUT OF FMEA
POTENTIAL LIST OF FAILURE MODES POTENTIAL LIST OF CRITICAL CHARACTERISTICS AND EFFECTS POTENTIAL LIST OF FAILURE MODES PRIORITIES RANKED BY RPN POTENTIAL LIST OF PARAMETERS TO BE TESTED FOR A PROCESS SHORT AND LONG TERM PROCESS CAPABILITIES
1
Determine Product or Process Functions
3
Determine Effects of The Failure Mode
5
Determine Controls
7
Develop and Drive Action Plan
Severity Rating
Detection Rating
If an FMEA was created during the Design Phase of the Program, USE I Create an Action Plan for YOUR ROOT CAUSE and Re-Evaluate the RPN Accordingly
434
SEVERITY CODES
1 NO EFFECT 2 VERY SLIGHT EFFECT ON PERFORMANCE. NON VITAL FAULTS OBSERVED.CUST NOT ANNOYED 3 SLIGHT EFFECT ON PERFORMANCE.CUST SLIGHTLY ANNOYED 4 MINOR EFFECT ON PERFORMANCE.FAULT DOES NOT REQUIRE IMMEDIATE ATTENDANCE.CUST OBSERVES MINOR EFFECT ON PERFORMANCE.NON VITAL FAULTS OBSERVED 5 MODERATE EFFECT ON PERFORMANCE.CUST DISSATISFIED.FAULT REQUIRES REPAIRS 6 SIGNIFICANT DEGRADATION OF PERFORMANCE BUT SYSTEM OPERATIONAL.CUST DISCOMFORT.NON VITAL PART INOPERABLE 7 MAJOR PERFORMANCE RETARDATION BUT SYSTEM OPERATIONAL. SUBSYSTEM INOPERABLE.CUST VERY DISSATISFIED 8 EXTREME SITUATION.SYSTEM INOPERABLE BUT SAFE CUST VERY DISSATISFIED 9 SERIOUS POTENTIAL HAZARD GRADUAL WHOLE FAILURE.SAFETY ENDANGERED 10 CATASTROPHIC HAZARDOUS EFFECTS SAFETY RELATED FAILURES.
OCCURRENCE PROBABILITY
RATING 1 2 3 4 5 6 7 8 9 CHANCE LIKELY 10**-8 REMOTE 10**-7 ISOLATED 10**-6 OCCASIONAL 10**-5 MODERATE LOW 10**-4 MODERATE HIGH 10**-3 RSNABLE PROBABLTY 10**-2 HIGH PROBABLTY 10**-1 IMMINENT 100% FAILURE
DETECTION RATING
1 FAULT OBVIOUS 2 FAULT DISCOVERED AFTER INSPECTION 3 FAULT DICOVERED AFTER FAILURE ANALYSIS 4 FAULT DISCOVERED AFTER PERFORMING CAUSE EFFECT AND ROOT CAUSE ANALYSIS
FMEA Scoring
Severity
Severity of Effect Extreme
May endanger machine or operator. Hazardous without warning May endanger machine or operator. Hazardous with warning Major disruption to production line. Loss of primary function, 100% scrap. Possible jig lock and Major loss of Takt Time Reduced primary function performance. Product requires repair or Major Variance. Noticeable loss of Takt Time Medium disruption of production. Possible scrap. Noticeable loss of takt time. Loss of secondary function performance. Requires repair or Minor Variance Minor disruption to production. Product must be repaired. Reduced secondary function performance. Minor defect, product repaired or "Use-As-Is" disposition. Fit & Finish item. Minor defect, may be reprocessed on-line. Minor Nonconformance, may be reprocessed on-line. No effect
Rating
10 9 8
High
7
6 5 4 3 2 1
440
None
Low
Moderate
Occurrence
Very High
Likelihood of Occurrence
Failure is almost inevitable
(Cpk) Rating
10 9 8 7
High
Moderate
6 5
4 3
Process is in statistical control. Only isolated failures associated with almost identical processes. 1 in 150k Failure is unlikely. No known failures associated with almost identical processes. 1 in 1.5M
2
1
441
Remote
Detection
Very Low
FMEA Scoring
Rating
10
Low
9
8
Moderate
7
Controls may detect the existence of a failure
6 5 4 3 2 1
Controls have a good chance of detecting the existence of a failure The process automatically detects failure. Controls will almost certainly detect the existence of a failure.
442
Very High
High
The Calculation !
443
Benefits of FMEA
Contributes to improved designs for products and processes. Higher reliability Better quality Increased safety Enhanced customer satisfaction Contributes to cost savings. Decreases development time and re-design costs Decreases warranty costs Decreases waste, non-value added operations Contributes to continuous improvement
WELL ESTABLISHED TECHNIQUE FOR FINDING FAILURE RELATIONSHIP AND IS FAULT ORIENTED WHERE IT LOOKS AT ALL POSSIBLE WAYS IN WHICH A PRODUCT COULD FAIL FOCUSES ON RELATIONSHIPS BETWEEN FUNCTIONAL EFFECTS AND PRODUCT COMPONENT AND IS DONE TOP DOWNWARDS AND BEGINS BY IDENTIFYING THE TOP UNDESIRABLE EVENTS IN THE SYSTEM BASIC STEPS INVOLVED IN PERFORMING FTA : -ESTABLISHING SYSTEM DEFINITION -CONSTRUCTING FAULT TREE - EVALUATING FAULT TREE QUALITATIVELY -COLLECTING DATA SUCH AS FAILURE RATES REPAIR RATES AND FAILURE PROBABILITY AND MTBF -RECOMMENDING CORRECTIVE MEASURES WHEREAS FMEA CONSIDERS FAILURE OR INDIVIDUAL COMPONENTS OF SYSTEM ONE AT A TIME AND NOTING FAILURE CONSEQUENCES FROM BOTTOM UP FTA IS REVERSE OF FMEA USES OR /AND GATES FOR DRILLING DOWN
Inhibit gate
Causal Relations
Output occurs if all the input events occur in the order
from left to right.
Exclusive OR Gate
Output event occurs if one, but not both, of the input events occur.
n inputs
m-out-of-n gate
MTR-1-PWR Page X
MTR-CTRL-1-OFF
MTR-CTRL-1-PWR
Pump Package 1 Motor Controller Fails Off / Low (Component Failure) MTR-CTRL-1-FOF
Pump Package 1 Motor Controller Commanded Off / Low (Software / Pressure Transducer Error) MTR-1-CTRL-CMD-OFF
PMP-PKG-1-REL-OFF
Page XX Pump Package 1 Relay Fails Off Pump Package 1 Relay Commanded to "Off" Position
PKG-1-REL-FOF
PMP-PKG-1-CMD-OFF
NO-LOAD-CH4
VLV-1557-OP
VLV-1537-CL
6.50E-06
3.90E-04
3.90E-05 Solenoid Operated Valve SOV-1561 Mech. Fails Closed Solenoid Operated Valve SOV-1561 Solenoid Fails Closed
SOV-1561-SOL-OP
2.86E-08
452
SOV-1561-MECH-OP
6.50E-06
3.90E-04
Why?
Why?
Why?
Why?
Why?
Employees are not Employees feel satisfied that they are underpaid
Reduced Sales
Rising costs
Contd /-
Increased competition
Uncompetitive pricing
Contd /-
Delayed delivery
Poor quality
Incorrect shipment
PROBLEM-CONVEYOR BELT GOT CUT ALONG WIDTH WHY BELT CUT--FOREIGN MATRL STUCK WHY FOREIGN MATRL STUCKENTRAPPED AROUND ROUTE WHY ENTRAPPEDMATRL NOT SCREENED WHY MATRL NOT SCREENEDINADEQUATE PROCESS CONTROL ROOT CAUSEWHY INADEQUATE PROCESS CONTROL SCREENING FACILITY NOT AVAILABLE
METHODOLOGY WHERE ALL KNOWLEDGE ABOUT NEEDS AND WANTS OF CUST ARE INCORPORATED INTO ALL STAGES OF DESIGN,MFG,DELVY AND SERVICES QFD IS METHODOLOGY WHERE ALL REQMNT ARE UNDERSTOOD AND INCORPORATED FOR BENEFIT OF CUSTOMERS QFD EMPLOYS A STEP BY STEP APPROACH FROM CUSTOMER NEEDS AND EXPECTATIONS THRU 3 PLANNING PHASES OF: -PRODUCT PLANNING PRODUCT DEVELOPMENT -PROCESS DELIVERY AND SERVICES QFD IS PROCEDURE WHICH HELPS TO BUILD QLTY INTO UPSTREAM PROCESSES AND INTO NEW PRODUCT DEV VOICE OF CUSTOMER IS CARDINAL TO QFD IMPORTANT TO DETERMINE WHO ACTUALLY IS THE CUSTOMER INTERNAL OR EXTERNAL LEVELS OF CUSTOMER EXPECTATIONS: -BASIC FUNCTIONAL EXPECTATION PERFORMANCE EXPECTATIONS -SERVICE EXPECTATIONS -INVESTMENT PROTECTION EXPECTATIONS -MINIMUM COST OF OWNERSHIP
QFD PROCESS
REQUIRES THAT COMPANY ADOPT A CUSTOMER ORIENTED PHILOSOPHY QFD HAS MULTIPLE MATRICES FOR TRANSLATRING CUSTOMER NEEDS INTO PRODUCT REQMNT AND SYSTEM SPECS PHASES EMPLOYED ARE: -CONVERTING CUSTOMER REQMNT INTO TECHNICAL REQMNT -CONVERTING TECHNICAL REQMNT INTO CHARACTERISTICS OF KEY PARTS OF PRODUCT -CONVERTING CHARACTERISTICS OF KEY PARTS INTO THE PROCESS TO MFG OF THESE PARTS -CONVERTING CHARACTERISTICS OF THE MFG PROCESS INTO DETAILED PRODN PROCEDURES AND CONTROL METHODS 1 CUSTOMER REQUIREMENT TECHNICAL ATTRIBUTES -CUSTOMER PERCEPTIONS -ENGINEERING MEASURES 2 DESIGN MATRIX -TECHNICAL ATTRIBUTES -PRODUCT FEATURES MEASURES 3 OPERATING MATRIX PRODUCT FEATURS -PROCESS STEPS MEASURES -PROCESS STEPS 4CONTROL MATRIX -PROCESS STEPS OPERATIONAL TASKS,CONDITIONS,CONTROLS MEASURES
IMPLEMENTING THE QFD PROCESS-SEQUENCE OF ACTIONS OBTAIN CUSTOMER NEEDS AND PERCEPTIONS
TRANSLATE CUSTOMER NEEDS INTO PRODUCT/ SYSTEM REQMNT & SPECS MEASURES OF CUSTOMER NEEDS ARE TRANSLATED INTO DESIGN ATTRIBUTES AND ENGINEERING MEASURES DESIGN ATTRIBUTES ARE TRANSLATED INTO PRODUCT/SERVICE FEATURES REQUIRED FEATURES ARE BASED DIRECTLY ON MEASURES OF CUSTOMER NEEDS FEATURES ARE THEN USED TO DEFINE PROCESSES AND OPERATING CONDITIONS THAT ARE REQUIRED TO DELIVER VALUE TO CUSTOMER CONTROLS ARE DEFINED FOR OPERATING CONDITIONS HOUSE OF QLTY DESIGN MATRIX OPERATING MATRIX CONTROL MATRIX
BENEFITS OF QFD
PROMOTES BETTER UNDERSTANDING OF CUSTOMER DEMANDS AND COMPLAINTS AND SIMPLIFIES REMEDIAL ACTION PROMOTES BETTER UNDERSTANDING OF DESIGN INTERACTIONS INVOLVES MFG IN DESIGN PROCESS IMPROVES DOCUMENTATION OF DESIGN AND DEVELOPMENT PROCESS REDUCES NUMBER OF ENGG CHANGES BRINGS NEW DESIGNS TO MARKET FASTER REDUCES OVERALL COSTS OF DESIGN AND MFG FACILITATES IDENTIFICATION OF CAUSES OF CUSTOMER COMPLAINTS AND MAKES IT EASIER TO TAKE PROMPT ACTION INCREASES CUSTOMER SATISFACTION USEFUL TOOL FOR IMPROVING PRODUCT QLTY MINIMIZES REJECTS AND REWORK MINIMIZES CUSTOMER CLAIMS SUBSTANTIALLY
BENEFITS OF QFD
INREASES THE ASSURANCE OF MEETING VOICE OF CUSTOMER WITH A NEW PRODUCT PROVIDES A MECHANISM TO TARGET SELECTED AREAS WHERE COMPETITIVE ADVANTAGE WOULD HELP INCREASE MARKET SHARE QFD REDUCES NUMBER OF ENGG CHANGES AS WELL AS ENGG COSTS IDENTIFIES CONFLICTING DESIGN REQUIREMENTS FOCUSES COMPANY ACTIVITIES ON CUSTOMER ORIENTED OBJECTIVES REDUCES PRODUCT DEVELOPMENT CYCLE REDUCES COST OF ENGG , MFG AND SERVICE IMPROVES QLTY OF PRODUCTS AND SERVICES
Completed products are transferred to next operation. Raw material is moved after the machine is stopped.
Setup tooling delivered after the changeover has begun. Defective product identified after internal setup has begun.
Defective tooling, fixtures, setup instruments are noticed after the machine is turned on.
The operator notices that equipment is missing after internal setup has begun.
474
WHAT IS SMED
MEHOD DEVELOPED BY SHINGO AIM OF APPLYING SMED METHODOLOGY IS TO SYSTEMATICALLY REDUCE TIME LOST IN PRODN FOR MACHINE SETUPS FROM HOURS TO MINUTES APPLIES TO ALL PRODN ACTIVITIES AND IS AN IMPORTANT INITIATIVE IN THE LEAN MFG AREA VERY RELEVANT IN THE DAYS OF INCREASED REQUESTS FOR CUSTOMISED PRODUCTS AT SHORT NOTICE SMED LEADS TO REDUCED LEADTIMES
No Setup
477
478
Competitive advantage
Quick Changeover techniques will make us more competitive in a marketplace which is becoming more and more demanding.
Setup reduction
Typical setup activities
Prepare Attach machine parts Measure, center Adjust 30% 5% 15% 50%
481
Prep
5%
15%
50%
APPROACH OF SMED
SETUP TIME REDUCTION IS OF CRUCIAL IMPORTANCE FOR PROFITABILITY APPROACH OF SMED IS TO REDUCE OUTPUT AND QLTY LOSSES DUE TO CHANGEOVER SMED APPROACH IS RECOMMENDED BY JIPM TO REDUCE SETUP LOSSES
No Involvem ent
Receive Informati on
Joint Consultati on
Employee Involvement
Employee Involvement includes:
Teamworking (including self-managing teams) Team Briefing Downward communications Two-way communications Suggestion schemes Problem-solving groups Financial participation (includes profit sharing schemes and ESOPs)
And Engagement?
Engagement is an idea whose time has come.it represents an aspiration that employees should understand, identify and commit themselves to the objectives of the organisation they work for..(however).HR professionals need to recognise that engagement is a strategic issues that cannot simply be left to manage itself (CIPD 2005, 2006)
An illustration of the assumed links between engagement and other factors is contained on the next slide
Employee Engagement
Feeling informed
Engagement
Performance
Intention to Stay
Treating employees With respect
New Challenge
A company manufactures glassware. The last step of the process is to wrap glasses individually in used newspapers and then place them in a specially designed box. The box is then sealed. Management notices low productivity with this last step, observing that workers occasionally stop to read the newspapers? What can management do to increase productivity?
Envisioning Techniques
Linear
step-by-step; scenario planning, etc.
Intuitive
brainstorming
500
501
DEFINITION
Creative problem solving is - looking at the same thing as everyone else and thinking something different.
503
z Why dont we think creatively more often? z What are the barriers that get in our way?
504
MENTAL BLOCKS
Mental blocks are reasons (attitudes) why we dont think something different.
506
508
509
z Which will provide the optimum solution? z What are the risks? z Are costs in keeping with the benefits? z Will the solution create new problems?
511
513
514
Brainstorming
Getting Ideas Before You Write
Increase the number and quality of their innovations Select the most competitive innovations from the pool of generated options
What is brainstorming?
Brainstorming is a means of generating ideas. Brainstorming can be used to identify alternatives, obtain a complete list of items and to solve problems. There are a variety of brainstorming techniques. The common principle of brainstorming is to set aside the restrictive thinking processes so that many ideas can be generated.
517
Creativity is ...
Developing the solution definition, particularly in identifying alternative solutions. Identifying all potential risks on a project. Developing the Work Breakdown Structure (identifying all the deliverables and work items). Dealing with difficult problems that arise during the course of the project.
520
BRAINSTORMING
Rules for Brainstorming:
The more ideas the better! No discussion No idea is a bad idea Build on one anothers ideas Display all ideas
521
Brainstorming
Principles for generating ideas
have clearly defined subject try to maintain criticism free setting when ideas generated,
ideas flow freely, not be hampered by critical comments or attacks from other group members
Brainstorming
Principles for generating ideas
related atmosphere sufficient time small group leader or not?
Brainstorming can:
break through traditional thinking about a problem. generate new ways of thinking. provide an environment for building on new ideas. reduce the tendency to prematurely discard new ideas. facilitate team building. encourage team problem solving.
524
Tools for Brainstorming Use the divergent rules to create and capture these ideas:Brainstorming
Goals in Idea Capture
Create as many ideas as possible Get input from as many good minds as possible
Step 2: Planning
The basic questions you should consider before doing a brainstorming session: Who should I invite to participate ?
Step 2: Why it is critically important to involve the users??: The Railway Paradox Problem Statement: When railroads are asked to establish new stops on the schedule, they study the requirements, by sending someone to the (requested stop) at the designated time to see if someone is waiting for the train. Of course, nobody is there because no stop is scheduled, so the railroad turns down the request because there is no demand.
Step 2: Conclusion:
Decision makers must talk to the ultimate users of the product to establish the true need for the product or the improvement.
Brainstorming is used to examine all the options available needed to solve the defined problem
It is used to help ensure that you are solving the problem in the best manner possible.
A clear and written definition of the real problem. Set criteria and their importance
Make sure the team understands and agrees to the problem at hand. Select a discussion Leader (Facilitator) Select a scribe whose job is to write without censorship ideas given by participants. Lay down the rules of divergent thinking.
No criticism, no negative reactions, etc (see below) No Analysis of the ideas Be patient with silence Allow mutation and growth of ideas
Basic Rules in How to Conduct a Brainstorming Session How do you know you are doing the right thing? Heres a summarycheck list.
No criticism or debate of ideas Let the imagination soarthe wilder the idea the better Need for a safe uncritical and friendly meeting Be patient with silence Test: if no one is laughing, it is not a good session Go for quantity (but dont go hog wild either) Mutate and combine ideas (build not destroy) Do your brainstorming in a manner suitable for you and your team but observe the basic rules! Only Later Concentrate ideas to manageable number using methods
Scamper
Ask yourself, what might you substitute, combine, adapt, magnify/minimize, put to other uses, eliminate, or reverse.
Gap Analysis
How many gaps can you fill/eliminate/simplify?
Analyzing Results of Brainstorming Session: Making the final list. Methods used:
Voting with a threshold All participants are given 5 votes (say)
Participant can vote any way they want for the posted ideas Idea with most votes from group gets included This cycle could be repeated with a second thresholding vote
Supervisory Encouragement of Creativity Acceptance of dumb ideas Acceptance of mistakes Supportive Work Group Peer support and acceptance Culture of acceptance of new ideas Organizational Encouragement of Creativity
Right Braining
Use of drawing to spur right-brain artistic ideas Establish the important attributes of what you want to design visually or graphically Sketch (quickly) each attribute Then, pair randomly the various individual pictorial attributes Continue until all attributes are included.
Ref: D.C Gause & G.M Weinber: Exploring Requirements: Quality before Design
Braindrawing
Use pictures sketches etc to capture ideas Does not use words in description
Ref: D.C Gause & G.M Weinber: Exploring Requirements: Quality before Design
Delphi Method 1
Process 2:
Questionnaire is distributed to the members. Each member jots down as many ideas as possible All items are collected and redistributed by the coordinator to the participants. They again add to the ideas or modify by variation. This continues until a stable set of ideas result.
Problem
very expensive, time consuming and tainted by peer influence
(1) Rand Corp late 1960s (2) P H Francis: Principles of R&D Management pg 169
* The facilitator provides exercises and determines when the participants are ready to proceed with the technique.
549
BRAINSTORMING GUIDELINES
Remember Creative Thinking
2. Clarify understanding. Once all the ideas have been generated (it may take approximately 5 to 6 minutes), review ideas offered.
550
BRAINSTORMING GUIDELINES
Lets combine ideas!!!
4. Completion.
551
MIND MAPPING
Definition : A visual picture of a group of ideas,
concepts or issues.
Purpose :
Unblock our thinking.
See an entire idea or several ideas on one sheet of paper. See how ideas relate to one another. Look at things in a new and different way. Look at an idea in depth.
552
Limitations
Brainstorming
discussion generally succumbs to influence of few individuals due to status, personality & other forces
What is NGT?
Basic process:
Team members silently write down ideas Ideas are shared and discussed Team members vote
Advantages
More unique ideas More participation Members have greater sense of contribution Time-efficient Better decisions Productive
Disadvantages
Addresses only one problem at a time Mechanical Requires preparation Hard to combine ideas at the end for even better output
Stages
Preparation
Idea Sharing
Discussion Voting/Ranking
Preparation
A team is assembled to include participants from varying areas. Materials needed:
Pen and paper for each member Flip chart Markers Tape Sticky notes (optional)
Preparation: members
Members can be heterogeneous, unlike a focus group
heterogeneous groups can be more creative there can be communication difficulties
individuals should be able to speak a common language
if have doctors and patients, doctors should not use medical jargon could have a variety of social scientists
Preparation: members
members in an NGT should be
interested in the problem have either experience or education which makes them a resource to the group flexible so they can openly explore various points of view
selection bias
if suspect, try a different mixture of participants in future groups
Introduction
A facilitator introduces themselves, explains the NGT process. The key problem or question is presented, explaining the purpose of the meeting. Telling team members about problem sooner allows them to come prepared.
Introduction
Role of Facilitator: A facilitator is chosen from among group members. Their responsibilities include:
Helping group avoid conflict Encouraging participation Keeping time Facilitating rounds Recording ideas
Idea Generation
Individuals silently and independently write down as many ideas as possible during pre-determined time period. (usually 10 minutes)
Idea Sharing
There are various approaches to idea sharing, but the same principles apply:
Everyone has equal chance to share their ideas All ideas shared are recorded on flip chart, except repeat ideas There is no discussion during this stage
Discussion
c Now ideas are disussed. Members can ask for details or clarification. The purpose is clarification not changing peoples opinions. Ideas are not eliminated. Ideas can be re-worded.
Discussion
Facilitator tries to keep all members involved, continue the flow of discussion, and not get caught on any point for too long. This phase typically lasts 3040 minutes.
Discussion
If there are many ideas (over 40), there can be an elimination stage before voting. Members can choose to eliminate their own ideas, or combine ideas together. Alternatively, idea elimination can require approval by all members.
Voting/Ranking
Voting or ranking determines the NGTs output. Facilitator should number the ideas to make voting easier. Members either vote anonymously, with the facilitator totaling points, or they can publicly write their votes on the flipchart.
Voting/Ranking
Voting method 1: Members can vote for ideas based on a chart like the following:
Number of ideas Less than 20 20-35 Over 35 Number of votes 4 6 8 Value of votes 1, 2, 3, 4 1, 2, 3, 4, 5, 6 1, 2, 3, 4, 5, 6, 7, 8
Points for each idea are totaled after all members vote.
Voting/Ranking
Voting method 2: Members rank all ideas, with the highest number as the most favored idea. Points are totaled after all members rank ideas. The idea with the most points wins.
Voting/Ranking
If the top 5 ideas are all within several points of each other, a second round of votes will best determine the real winner. Repeat the voting stage using only the top 5 ideas.
Visibility
Throughout the process, all charts should remain visible. Tape them to the walls around the room.
Example of NGT
The faculty at X-University is concerned that the students are not getting internships and jobs. A team is created involving faculty, students, and recruiters. The goal is to identify the cause of this problem. After this NGT process, the faculty will create an action plan based on the outcome.
Example of NGT
Statement of Problem: Why arent students getting internships and job offers?
Example of NGT
Individual idea generation:
The job market is slow. Poor interview skills. Theyre not networking.
Not enough recruiters come. Their resumes are weak. Students are unwilling to relocate. Students are unprepared. No internships prevents them from getting jobs later on. The career fair is not productive. Everyone wants to stay instate.
Example of NGT
Idea Sharing:
Example of NGT
Discussion:
Should we combine unwilling ness to relocate with students wanting to stay instate?
Is the career fair not productive because there are too many people or too few? Can we re-word that to say, There arent job opportunities through the career fair?
What do you mean by poor interview skills? Does that include lack of training?
Example of NGT
Idea # Rank
Voting/ranking:
1. Unwilling to relocate 2. Poor interview skills 3. Weak resumes 4. Career fair doesnt offer very many job opportunities 5. Students arent networking. 6. Not enough recruiters. 7. Bad job market
3
4 7 2 1 5 6
7
6 5 4 3 2 1 Idea # 1 Rank 3+1+1=5 4+2+3=9 7+6+7=20 6+3+6=15 2+4+2=8
List of ideas
Individual rankings Combined points
2 3 4 5
6
7
1+5+4=10
5+7+5=17
Definition:
In summary: NGT allows groups to reach optimal solutions by generating ideas privately, sharing ideas, discussing, and voting. It eliminates biases and groupthink. Members can participate equally with less intimidation. Try using NGT for your organizations future questions and challenges.
Advantages
different group processes for independent idea generation, feedback & voting increased attention to each idea increased opportunity for each individual to assure her or his ideas are heard avoids arguments & extraneous interactions
Limitations
cross-fertilization of ideas diminished because of structure imposed by NGT
reduced flexibility,
structure is imposed on meeting
SYNECTICS