First Zero Flare Plant in Middle East


Client: ADCO. BAB Field, United Arabic Emirates. Delivered in 2003 Design Capacity (recovered gas): 2.2 MMSCFD Reduction in H2S emissions: ~50 tonnes per annum Safety Integrity Level 3 required. Actual level (SIL4): 10- 4 to 10- 5 Comprising the following deliveries (EPC): Gas Recovery Compressor Inert Gas Package Valve Skid (Quick opening Valves, QOV) Auto Ignition System Control & Monitoring

Zero Flare System at BAB, UAE


Continuous
INTEGRATED FLARE CONTROL PACKAGE
(IEC 61508/61511 SAFETY STANDARD) STATOIL PATENTED UK,Norway, USA MARKETED BY ABB DCS

Ignition System

LOGIC

GAS RECOVERY

PT PT

K.O.DRUM K.O. DRUM


N

N2 Purge PURGING
2

INERT

GAS FOR

TANK FARM

Process

Control & QOV

Ignition System

May 2003

Zero Flare Project References:


First zero flare pilot plant for the Middle East.
Client: ADCO. BAB Field, United Arabic Emirates (2003) Kristin Platform. Client: Statoil (2005) Snorre B Platform. Client: Norsk Hydro (2001) Oseberg South Platform. Client: Norsk Hydro (2000) sgard B Platform. Client: Statoil (2000) Pierce FPSO. Client: Enterprice Oil (1999) Oseberg Gas Platform. Client: Norsk Hydro (1999) sgard A Platform. Client: Statoil (1999) Siri Platform. Client: Statoil (1998) Njord Platform. Client: Norsk Hydro (1997) Heidrun Platform. Client: Statoil (1995)

Gas Technology
Gas Production
Closed Flare
Pilot Plant in UAE Optimum Flare Design Hydrate Production

CO2 Capture & Green Power


AK Main Contractor
CO2 Capture from gas Reinjection in aquifer Fuel Cell

Gas Transport
Own Technology, IPR LNG Facilities Onshore & Offshore Production & Terminals

Multi- MW Demo Plant


Developments, IPR CO2 Membrane

Compact Design
Pilot @ Krst HiOx Development Zero Emission Power Demo Plant 45 MWe

GTL / Methanol / CNG


Offshore Application Stranded Gas
Aker Kvaerner Technology
Contact: Oscar Fr. Graff, Tel. +47 91 37 58 59 oscar.graff@akerkvaerner.com

SAAS System
SAAS System is a specialist integrator of Environmental and Safety applications to the Petroleum Industry. Have since 1998 worked closely with Aker Kvaerner Technology to promote environmental friendly technologies in selected export markets.

SAAS` latest delivery to Malaysia


HIPPS system;last barrier to protect the Top side on this unmanned platform in offshore Borneo waters. Reducing CAPEX by spec-break. Offshore commissionig due in October.Shell Sarawak`s first HIPPS in accordance with IEC 61508 Safety Standard.

You might also like