Exchanger Inspection 101 Visual Inspection of Shell and Tube Heat Exchangers

The inspection of heat exchangers is the one area of equipment inspection where I firmly advocate the use of a check list to make sure you got everything. The reason that I do so is that in my opinion, with the parts scattered and the confusion endemic to the bundle slab, its easy to miss a part, or to only partially inspect a part. Ill include sample checklists, as well as a sample Excel type sheet for those unfortunates that might be tasked with multiple exchangers, and a typical wall chart for exchangers at the back of this book. On to the inspection!!! **Hopefully, by this time you already know what to look for on a gasket surface, but just in case, heres a list: Actual gasket seating surface cuts, dings or gouges that extend across greater than 25% of the surface. Severity weighting should be given to those which start from the pressure side, are particularly deep, or which have displaced, raised metal which might interfere with the gasket sealing. If the defect doesnt go deeper than the serrations, it generally wont cause a leak, except in high pressure steam service. Watch for nibbling away of the actual seating surface outward from the stagnant area and if theres a nubbin, check that the nubbin is intact and square. The best way to do this is with your fingers as well as your eyes.

Serrated stagnant area - The remaining serrations. Corrosion, pitting, cuts or gouges which might lead process fluids to the aforementioned gasket seating surface Stagnant area The area inward from the actual gasket seating surface, through the knuckle. Corrosion in this area is often difficult to quantify, and gets ignored, since theres lots of metal there, but the corrosion allowance doesnt say everywhere except Pass partition gasket seating surfaces Should be straight and true on both sides. Some degradation of the edges is normal, but there needs to be at least an eighth inch of flat, smooth surface from end to end to ensure the gasket seats.** Channel Cover: Mostly open area, pitting and corrosion are common. The gasket surface 360o and across the face for the pass partition is of primary importance. Persistent leakers may be warped and should be dialed in by a machinist. A WORD ON THE NUBBIN Metal jacketed and double jacketed gaskets When used on a tongue and groove joint without a nubbin, the gasket should be installed so that the tongue bears on the seamless side. When a nubbin is used, the nubbin should bear on the seamless side. Nubbins are usually 1/16th inch wide, by 1/32" high. If the height varies significantly (by touch), remachine!!!

Channel:
I look at channels in as methodical a method as I can. I try to look at the channel cover end first, followed by the barrel/shell, then the shell cover end. The nozzle internal attachment welds and the nozzle bore are next. A mirror is a must for this inspection. . Also, special attention should be paid to any bull plug vents. They may be corroded out, with all the threads gone except the threads holding the plug. These vents are usually 3000# or 6000# couplings, and are difficult to hydroblast free of deposits. Buster Powell says; They should remove the bull plugs before blasting. That applies to blind flanges, too.

**Cooling Water Service Tubeside Cooling water deposits are bad Make them blast the channel clean of deposits, but, if possible, without disturbing the black oxide scale. This black scale is a corrosion barrier, and with a little luck on the part of the client, more will form where the Microbiologicals in the deposits have been blasted away. Dont inspect a dirty channel, especially if there are tubercles /carbuncular deposits. There is no way to predict how deep the corrosion under deposits may be.

Process Tubeside - The inspection is usually a lot more boring, but any corrosion found is usually taken much more seriously, for obvious reasons. Again, dont letem talk you into inspecting it without cleaning, too many things can be masked by even a thin coating of black nasties. **

Primary (Stationary) Tubesheet - Channel End Tubesheet on a removable bundle, or on a multi-pass fixed tubesheet. Again, I look at the gasket seating surface(s), first and foremost, then the tubesheet itself. Tubesheets are subject to a variety of corrosion, from simple corrosion under deposits, to service induced cracking, surface checking and galvanic or turbulence induced corrosion at the tube perforation.

Tube ends - Tube ends should be intact


and square, with no corrosion taking little bites out

They should not be thinning to knife edges, or corroded below the tubesheet surface. Any mechanical damage should, of course, be noted, as well as the number of plugs installed.

Tube IDs -This is one of the few areas where I


use Weasel Wording on a regular basis. That portion of the tube IDs visible, Cause you cant see very much, and what you can see, you cant quantify. Ive had old timers from Mobil Oil tell me that they can tell how deep ID pitting is with a Pit Picker, but I dont have the touch, I guess, and thats still only a few feet down the tube. As the following pictures show, the only good way to survey the inside of a tube is with a video boroscope. Flashlights are horrible. Reflected sunlight is better, but still very limited, and even a boroscope sucks if the conditions arent just right. Be that as it may, when doing a visual, try to use sunlight. Note any visible pitting and scale. Note any damage at the tube rolls, and any longitudinal die marks (these are a prime spot for corrosion to start).

Secondary Tubesheet The other one If theres more than two, its too weird for me to inspect. On a fixed tubesheet exchanger, theyre identical. On a floating head, the secondary tubesheet is small enough to pass through the shell, and will probably have a seating angle for the split backing ring. (Dont forget to check this area for humps, bumps and other things that might make the split ring not seat right. Check the split rings for twisting that might make them not seat right, since this can effect the seating of the floating head, too.)

Bundle - Again, may not be the best way, just the way I do it. I try to find the angle that I can look through the bundle, and slowly walk around the bundle, tapping tubes, tie rods and baffles, but primarily looking through the bundle, checking for fouling and/or distorted tubes.. If the baffles or tubes sound at all loose (and they almost always do), I stop and look to see if theres hole enlargement and/or fretting damage to the tubes.

I then walk around the bundle again, looking at the tube ODs. I check closely at the tubesheet to tube junction, and the U bends, too., as well as the length of the tube. I look at the impingement plate, plate attachment tacks and the surface of the tubes around the plate. If there isnt an impingement plate, I try to find indications of inlet/outlet locations.

Floating Head The floating head requires no special inspection, treat it like any other component. Do look closely, as always.

The Shell and Shell Cover (For the sake of this book, were going to pretend that all shell covers are left in place. This is a fairly common occurrence, with both pros and cons, but if the shell cover is dropped, you treat it just like any other component.) I approach the shell like any other internal inspection, with this proviso; I REALLY dont like to inspect wet shells. If you inspect shells immediately after hydroblasting, you WILL miss stuff. Maybe not today, but eventually, if you continue to do it, you will. All wet shiny stuff looks wet and shiny, and thats all it looks like. First, I look at the bolt circle, flange face, gasket surface, nubbin if present, stagnant area and attachment weld. A note on bolt circles Try as I might, I can find nowhere in the codes that says you can lose ANY of the thickness of the bolt circle. Ive put what I have found in the back of the book On to the shell

The variations in design seem endless, and a certain amount of Figuring it Out is frequently necessary.

First, shadow the shell from the outside (presupposing that entry is possible). You should be able to see, if not quantify, a lot of what you are going to find from right there. From the flange, you can see; one of the two prime areas for deposit collection, which are right up against the back of the tubesheet, and at the back of the shell, below the bundle. You can see the primary location of any extraction damage, i.e., gouges to the shell internal surface, as well as any damage to the skid bars. Any bulges or distortions of the shell will be most evident when shadowing from the end, and any severe baffle wear on the shell will be very evident.

Remember though, EVERYTHING looks worse when its shadowed. As you crawl the shell, all the items that were visually noted from the flange should be checked out for validity and quantified, as well as any corrosion that wasnt visible from outside. I try to pay particular attention to any phase change marks (like those in a drum) on the shell that might lead me to expect different corrosion characteristics, the nozzles internal surfaces and the

bottom and top centerline, as well as all the welds. The shell to shell cover joint, whether the shell cover is integral or not, is a prime location for corrosion, as is the shell immediately adjacent to the weld and the shell cover bottom third or so.