Program Priorities
Program Focus
System safety and security Regulatory requirements State of Good Repair (SGR) - 85% of program System Expansion System Enhancements
Definition
State of Good Repair (SGR) the condition of an asset where the asset, at a minimum, is capable of delivering the required performance safely and reliably for a predetermined period of time*
* state of good repair may include short or long term replacement/rehabilitation based on the needs of the Authority. It does not necessarily constitute complete replacement/rehabilitation of an asset
Prioritize actions
Evaluate alternatives Program acquisition, renewal, or disposal
Condition Assessment
The Condition Assessment forms the basis for MARTAs Capital Improvement Program (CIP). The last formal system wide condition assessment was performed in 2000. Asset Breakdown Structure
There were sixteen (16) asset categories assessed: - Buildings - Traction Power - Structures - Communications - Other Structures - Vehicle Service Equipment - Mechanical Equipment - Buses - Track - Rail Cars - Fare Collection - Other Vehicles - Automatic Train Control - Computers - Signage - Office Furniture
Condition Assessment
Remaining Useful Life (RUL) and Percent of Assets
Condition Assessment
CIP
10
($ Millions)
FY2014
FY2015
FY2016
FY2017
FY2018
Service Enhancements
System Expansion
Regulatory Requirements
11
250 200 150 100 50 0 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017
Fiscal Year
Planned Expenditures
Actual Expenditures
12
Program Review
Continued Focus on State of Good Repair Safety/Regulatory Mandates
In 2008, MARTA completed an independent comprehensive system wide Safety Assessment of all safety related systems to be used for CIP prioritization.
13
Dollars (millions)
300.0 250.0 200.0 150.0 100.0 50.0 0.0 FY08 FY09 FY10 FY11 FY12 FY13 Fiscal Year CIP January CIP April FY14 FY15 FY16 FY17 FY18
14
Bus - Vehicles
Infrastructure (average bus age 5.5 years)
532 - 40 foot low floor buses, 428 CNG, 104 Diesel 22 - 30 foot low floor buses, all CNG 55 - 35 foot low floor buses, all Diesel
Proposed CIP
Continuation of Baseline (major programs)
Replacement (CNG ~$350,000, Diesel ~$320,000, Accessories)
30-40 foot bus 12 years or 500,000 miles
New Initiatives
Memorial Drive BRT Bus Procurement
15
Infrastructure
Bus - Facilities
Operating Garages
Hamilton diesel only, S. Fulton, 31 years old, capacity: 223 Laredo diesel/CNG, DeKalb, 24 years old, rehab project ~2000, capacity: 250 Perry diesel/CNG, W. Atlanta, 11 years old, capacity: 225
Browns Mill heavy maintenance 31 years old, S. Atlanta Street furniture (shelters and benches)
Proposed CIP
Continuation of Baseline (major programs)
State of Good Repair
Facility renovation Hamilton (Title VI issue) Facility upgrades Laredo, Perry & Browns Mill Equipment upgrades/replacements all facilities & street furniture
Enhancements
Stonecrest Park & Ride
New Initiatives
Replacement of Rotary Lifts Relocate Non-revenue Vehicle Maintenance
16
Mobility
Infrastructure
Lift Vans 130 in revenue service, 45 pending
50 medium duty vans, 5 years old 12 heavy duty vans, 3 years old 33 heavy duty vans, 2 years old 5 heavy duty vans, 1 year old 30 medium duty vans, less than 1 year 45 heavy duty vans, currently being equipped for revenue service
Proposed CIP
Continuation of Baseline (major programs)
Replacement (Medium 4 years or 100,000 mi. Heavy 5 years or 200,000 mi.) State of Good Repair
Brady Renovation
Enhancement
Mapping Device for Vans
17
Infrastructure
Rail - Vehicles
Systems
Train Control HVAC Doors Propulsion Communications Aux. Power Supply Cab & Fault Monitoring Coupler SCADA Air System/Brakes Trucks Car Body
Proposed CIP
Continuation of Baseline (major programs)
Procurement close out CQ312 Breda contract State of Good Repair
Mid-Life Overhaul (final car delivered FY09) Life Cycle Asset Reliability Enhancement Program (LCARE) Rotables/Rebuilds
New Initiatives
Configuration Management standardize fleet
18
Rail - Facilities
Infrastructure
Maintenance/Yard Facilities
Avondale 28 years old South 19 years old Armour 2 years old
Passenger Facilities
38 rail stations service dates 1979-2000
Ancillary Facilities (Traction Power Sub Station, Gap Breaker Sub Station, Train Control Rooms, Auxiliary Power) Structures
Bridges - 19 Pedestrian, 6 General Aerial Structures 58 structures totaling 12.6 miles Parking Decks 10 decks
Tunnels/Cut & Cover 41 structures, 9.4 miles Track 48 miles double trackway in revenue service (100+ miles total) Support Facilities
Headquarters, South Annex, Rail Services Control Center
19
Enhancements
Buckhead North Entrance
New Initiatives
Five Points Renovation Rehabilitate Station Chillers
20
Technology
Infrastructure
Radio Communication Network Ops Center EDP Hardware & Software LAN/WAN Systems Ops & Maint. Info Systems - AFC System (Breeze) - Call Centers - CCTV - Admin Systems - Dispatch Centers
Proposed CIP
Continuation of Baseline (major programs)
Replacement
ERP/EAM System (Financial/Maintenance/HR) New MMIS System on-line October 2006 Bus & System wide Radio Automated Fare Collection (Breeze) Equipment & Software upgrades
New Initiatives
DEO Management Systems
21
Proposed CIP
Continuation of Baseline (major programs)
CCTV replacement Facilities Security Underground storage tank management programs Pollution Prevention Program
New Initiatives
CCTV on revenue rolling stock
22
System Support
Infrastructure
Non-Revenue Vehicles Administrative Facilities Tools & Equipment
New Initiatives
Training Equipment & E-lab
23
Communications
Infrastructure
Life Safety
Fire Alarm Public Address (audio & visual) Telephone
Signage
Multipurpose LED Signs (by Sign Post) CBS Rail Network TTN Fixed route bus
Proposed CIP
Continuation of Baseline (major programs)
State of Good Repair
Station signage upgrades Fire alarm upgrades Upgrade PA system Voice communication
New Initiatives
Seamless Bus, Rail, Station and Vehicle communication system
24
Planning
Proposed CIP (major programs)
System Optimization Study
Facility Requirements Infill Stations Neighborhood Circulators Fleet Sizing and Configuration I-20 East Line BRT I-20 West Line BRT BeltLine Clifton Corridor Peachtree Street Car Woodruff Arts Center Transit Oriented Development Greening Initiative
Expansion
Other
25
New Initiatives
[$millions]
Configuration Management CCTV Cameras in Buses CCTV Cameras in Rail Cars Relocation of Nonrevenue Vehicle Maintenance Update Condition Assessment of Fixed Assets Decatur Tunnel Vibration Remediation Seamless Bus, Rail, Station, and Vehicle Communication System (planning) E-Labs and Equipment Environmental "Greening" Initiative Multimodal Facility Requirements and Plan Peachtree Streetcar Project GIS/REIS Needs Assessment DEO Management Systems Rail Station Chiller Plant Rehabilitation Evaluation (Five Points Arts Center) Replacement of Rotary Lifts Five Points Station Renovation Accelerate Systemwide Escalators Groups 4, 5, & 6 Arts Center Station Modifications for Woodruff Arts Center * Funded within existing projects 30.0 13.0 8.0 2.5 2.5 0.5 0.5 0.4 0.3 0.3 0.3 0.2 0.2 * * * * *
26
27
Questions