21-09-09
Basic requirements for paralleling : Voltage rating of incoming set to be same as that of existing set or grid at point of connection. The rated frequency of the voltage output from new set must be equal to that of the grid or existing set. The sequence of phase rotation of the incoming set must be same as that of the grid or with existing sets at the point of connection. Control systems for DG synchronization : Manual synchronization - Double voltmeter, Double frequency meter, synchroscope or check synchro relay. Automatic synchronization Auto synchronizer which also adjusts voltage and frequency of incoming machine and sends the switchgear closing command at the instant of synchronism automatically thus enabling the operator to perform synchronism 6 at one single command. A.THIAGARAJAN
21-09-09
A.THIAGARAJAN
FREQUENCY
Hz
50 49 48 47
Nominal speed
Operating speed
Load on M / c 1
0 100 %
LOAD % LOAD SHARING BETWEEN TWO MACHINE EOUAL RATINGS DIFFERENT DROOPS 21-09-09 A.THIAGARAJAN 9
FREQUENCY ( Hz)
FREQUENCY ( Hz )
4.5 MW
6 MW
LOAD SHARING BETWEEN TWO MACHINES DIFFERENT RATINGS EQUAL DROOP 21-09-09 A.THIAGARAJAN 10
GRID
G1
G2
G3